HomeMy WebLinkAboutSr. Hsg. L.O.C Phase I - permit conditions ORONO WOODS SENIOR HOUSING PHASE 1 (SITE GRADING) PERMIT CONDITIONS READ NOW!! Attachment to 2040 W. Wayzata Blvd. (Orono Senior Housing) Phase 1 grading permit. Terms and Conditions of Permit 1. This permit is subject to the terms and conditions of the PUD 2B Agreement,a copy of which is attached hereto. 2. Permit approval is based on the approved Site Plan(Sheet C2-1, latest revision 12-17-01) and the approved Grading/Drainage/Erosion Control Plan (Sheet C3-1, latest revision 12- 17-01) and is subject to ongoing review and site inspections by the City. Any changes to plans require City approval. 3. Orange silt fence shall be installed and maintained in place and in functional condition at all times, subject to Minnehaha Creek Watershed District requirements. 4. Tree removal shall occur only within the limits established by silt fencing as shown on the approved plans. 5. In the event that site activities result in spillage of fill materials on adjacent roadways, contractor shall be responsible for maintaining area roadways in a clean condition on a daily basis or as may be required by the City. 6. In the event that excess fill is to be hauled off-site, be advised that any location in Orono to be receiving such fill must first have obtained the appropriate permits from the City (more than 500 cubic yards to any single receiving site requires a 60-day conditional use permit review process). 7. This permit covers only the Phase 1 Improvements as listed in the attached Phase 1 Site Grading Cost Estimate. A separate permit will be required for the Phase 2 Improvements which include all work shown on the attached Phase 2 Utilities and Street Improvements Cost Estimate. 8. THIS PHASE 1 IMPROVEMENTS PERMIT WILL BE REVOKED IF THE PHASE 1 LETTER OF CREDIT IS NOT RECEIVED AT THIS OFFICE BY 4:30 P.M. ON WEDNESDAY, DECEMBER 26, 2001. IF THIS PERMIT IS REVOKED, THE CITY WILL ORDER ALL WORK AT THE SITE TO BE STOPPED BEGINNING AT 8:00 A.M. ON THURSDAY DECEMBER 27,UNTIL THE LETTER OF CREDIT IS RECEIVED AT WHICH TIME THE PERMIT WILL BE REINSTATED. 9. Commencement of the Phase 2 (Utilities and Street) Improvements may not commence until a Phase 2 Improvement Permit is issued, which we anticipate will be in the spring of 2002. Such permit will not be issued until the Phase 2 Letter of Credit is received. 10. This permit does not cover the following activities which require separate permits: - Foundation and building construction - Utility connections to building - Building systems (plumbing, mechanical, electrical, etc.) Sheet 1 of 4 11. Construction trailer is approved to be located near the northeast corner of the site. Any temporary lighting shall be directed away from adjacent properties. 12. Do not commence site grading or improvements until all other agency permits have been obtained (Mn/DOT, MCWD, etc.). 13. Applicant is advised that City will coordinate with the developer prior to commencing burial of existing power lines, installation of street lighting along Brown Road and Highway 12, and other off-site improvements for which the City is responsible. 14. Hours of construction activity(use of power equipment) limited by Orono Ordinance 155 to between the hours of 7:00 a.m. and 8:00 p.m. weekdays and 8:00 a.m. to 8:00 p.m. on weekends and holidays. Sheet 2 of 4 s , CITY OF ORONO ORONO WOODS APARTMENTS COMMERCIAL SITE DEVELOPMENT PLAT FILE NO. 2641 SITE IMPROVEMENT COST ESTIMATE: PHASE 1-SITE GRADING ....................:::::::::::::::::... U N I T• EST. ES T. ITEM UNIT QUANTITY PRICE COST Mobilization LS 1 $5,000.00 $5,000 Site grading LS 1 20,000.00 20,000 Common excavation CY 2300 5.00 11,500 Landscaping LS 0.25 40,000.00 10,000 Retaining wall SF 320 15.00 4,800 Silt fence LF 1500 3.00 4,500 Estimated Construction Cost $55,800 0 50/o Security Deposit 27,900 Total Security Deposit Required $83,700 Sheet 3 of 4 CITY OF ORONO - ORONO WOODS APARTMENTS COMMERCIAL SITE DEVELOPMENT PLAT FILE NO. 2641 SITE IMPROVEMENT COST ESTIMATE: PHASE2 UTILITIES AND STREET EST. UNIT 1 EST. ITEM UNIT QUANTITY PRICE COST Stabilization fabric SY 4000 1.00 4,000 Aggregate base, Cl. 4, 100% crushed TN 1900 11.00 20,900 Aggregate base, Cl. 5, 100% crushed TN 1900 11.00 20,900 Type 31 bit. base course TN 600 32.00 19,200 Type 41 bit. wear course TN 300 35.00 10,500 Bituminous material for tack GL 400 1.00 400 Concrete curb and gutter LF 1910 8.00 15,280 Landscaping LS 0.75 40,000.00 30,000 Concrete walk SF 3000 3.00 9,000 6" DIP LF 160 20.00 3,200 8" DIP LF 980 25.00 24,500 DIP fittings LB 3000 1.00 3,000 6" gate valve & box EA 5 800.00 4,000 8" gate valve & box EA 3 1,000.00 3,000 Hydrant EA 3 1,500.00 4,500 Connect to existing water main EA 2 1,000.00 2,000 12" HDPE storm sewer LF 565 15.00 8,475 12" RCP storm sewer LF 171 25.00 4,275 15" RCP storm sewer LF 405 30.00 12,150 21" RCP storm sewer LF 85 35.00 2,975 21" RCP FES EA 1 1,000.00 1,000 Class III riprap CY 8 50.00 400 Connect to existing storm MH EA 1 1,000.00 1,000 Storm catch basin w/casting EA 7 1,200.00 8,400 Storm catch basin MH w/casting EA 7 1,500.00 10,500 6" PVC sanitary sewer LF 180 15.00 2,700 8" PVC sanitary sewer LF 550 23.00 12,650 Improve pipe foundation LF 550 1.00 550 8"x6" wye EA 1 50.00 50 Sanitary MH w/casting EA 3 1,800.00 5,400 Construct MH over existing line EA 1 3,000.00 3,000 Connect to existing sanitary sewer EA 2 1,000.00 2,000 Remove existing sanitary sewer LF 380 5.00 1,900 Estimated Construction Cost $251,805 +50% Security Deposit 125,903 Total Security Deposit Required $377,708 Sheet 4 of 4 ,1 4 ORONO WOODS SENIOR HOUSING PHASE 1 (SITE GRADING) PERMIT CONDITIONS READ NOW!! Attachment to 2040 W. Wayzata Blvd. (Orono Senior Housing) Phase 1 grading permit. Terms and Conditions of Permit 1. This permit is subject to the terms and conditions of the PUD 2B Agreement,a copy of which is attached hereto. 2. Permit approval is based on the approved Site Plan(Sheet C2-1, latest revision 12-17-01) and the approved Grading/Drainage/Erosion Control Plan (Sheet C3-1, latest revision 12- 17-01) and is subject to ongoing review and site inspections by the City. Any changes to plans require City approval. 3. Orange silt fence shall be installed and maintained in place and in functional condition at all times, subject to Minnehaha Creek Watershed District requirements. 4. Tree removal shall occur only within the limits established by silt fencing as shown on the approved plans. 5. In the event that site activities result in spillage of fill materials on adjacent roadways, contractor shall be responsible for maintaining area roadways in a clean condition on a daily basis or as may be required by the City. 6. In the event that excess fill is to be hauled off-site, be advised that any location in Orono to be receiving such fill must first have obtained the appropriate permits from the City (more than 500 cubic yards to any single receiving site requires a 60-day conditional use permit review process). 7. This permit covers only the Phase 1 Improvements as listed in the attached Phase 1 Site Grading Cost Estimate. A separate permit will be required for the Phase 2 Improvements which include all work shown on the attached Phase 2 Utilities and Street Improvements Cost Estimate. 8. THIS PHASE 1 IMPROVEMENTS PERMIT WILL BE REVOKED IF THE PHASE 1 LETTER OF CREDIT IS NOT RECEIVED AT THIS OFFICE BY 4:30 P.M. ON WEDNESDAY, DECEMBER 26, 2001. IF THIS PERMIT IS REVOKED, THE CITY WILL ORDER ALL WORK AT THE SITE TO BE STOPPED BEGINNING AT 8:00 A.M. ON THURSDAY DECEMBER 27,UNTIL THE LETTER OF CREDIT IS RECEIVED AT WHICH TIME THE PERMIT WILL BE REINSTATED. 9. Commencement of the Phase 2 (Utilities and Street) Improvements may not commence until a Phase 2 Improvement Permit is issued, which we anticipate will be in the spring of 2002. Such permit will not be issued until the Phase 2 Letter of Credit is received. 10. This permit does not cover the following activities which require separate permits: - Foundation and building construction - Utility connections to building - Building systems (plumbing, mechanical, electrical, etc.) Sheet 1 of 4 , 11. Construction trailer is approved to be located near the northeast corner of the site. Any temporary lighting shall be directed away from adjacent properties. 12. Do not commence site grading or improvements until all other agency permits have been obtained (Mn/DOT, MCWD, etc.). 13. Applicant is advised that City will coordinate with the developer prior to commencing burial of existing power lines, installation of street lighting along Brown Road and Highway 12, and other off-site improvements for which the City is responsible. 14. Hours of construction activity (use of power equipment) limited by Orono Ordinance 155 to between the hours of 7:00 a.m. and 8:00 p.m. weekdays and 8:00 a.m. to 8:00 p.m. on weekends and holidays. Sheet 2 of 4 CITY OF ORONO ORONO WOODS APARTMENTS COMMERCIAL SITE DEVELOPMENT PLAT FILE NO. 2641 SITE IMPROVEMENT COST ESTIMATE: PHASE 1-SITE GRADING .... .............. EST. UNIT EST. ITEM UNIT QUANTITY PRICE COST Mobilization LS 1 $5,000.00 $5,000 Site grading LS 1 20,000.00 20,000 Common excavation CY 2300 5.00 11,500 Landscaping LS 0.25 40,000.00 10,000 Retaining wall SF 320 15.00 4,800 Silt fence LF 1500 3.00 4,500 Estimated Construction Cost $55,800 +50% Security Deposit 27,900 Total Security Deposit Required $83,700 Sheet 3 of 4 CITY OF ORONO - ORONO WOODS APARTMENTS COMMERCIAL SITE DEVELOPMENT PLAT FILE NO. 2641 SITE IMPROVEMENT COST ESTIMATE: PHASE2 UTILITIES AND STREET EST. UNIT 1 EST. ITEM UNIT QUANTITY PRICE COST Stabilization fabric SY 4000 1.00 4,000 Aggregate base, Cl. 4, 100% crushed TN 1900 11.00 20,900 Aggregate base, CI. 5, 100% crushed TN 1900 11.00 20,900 Type 31 bit. base course TN 600 32.00 19,200 Type 41 bit. wear course TN 300 35.00 10,500 Bituminous material for tack GL 400 1.00 400 Concrete curb and gutter LF 1910 8.00 15,280 Landscaping LS 0.75 40,000.00 30,000 Concrete walk SF 3000 3.00 9,000 6" DIP LF 160 20.00 3,200 8" DIP LF 980 25.00 24,500 DIP fittings LB 3000 1.00 3,000 6" gate valve & box EA 5 800.00 4,000 8" gate valve & box EA 3 1,000.00 3,000 Hydrant EA 3 1,500.00 4,500 Connect to existing water main EA 2 1,000.00 2,000 12" HDPE storm sewer LF 565 15.00 8,475 12" RCP storm sewer LF 171 25.00 4,275 15" RCP storm sewer LF 405 30.00 12,150 21" RCP storm sewer LF 85 35.00 2,975 21" RCP FES EA 1 1,000.00 1,000 Class III riprap CY 8 50.00 400 Connect to existing storm MH EA 1 1,000.00 1,000 Storm catch basin w/casting EA 7 1,200.00 8,400 Storm catch basin MH w/casting EA 7 1,500.00 10,500 6" PVC sanitary sewer LF 180 15.00 2,700 8" PVC sanitary sewer LF 550 23.00 12,650 Improve pipe foundation LF 550 1.00 550 8"x6" wye EA 1 50.00 50 Sanitary MH w/casting EA 3 1,800.00 5,400 Construct MH over existing line EA 1 3,000.00 3,000 Connect to existing sanitary sewer EA 2 1,000.00 2,000 Remove existing sanitary sewer LF 380 5.00 1,900 Estimated Construction Cost $251,805 +50% Security Deposit 125,903 Total Security Deposit Required $377,708 Sheet 4 of 4 ORONO WOODS SENIOR HOUSING PHASE 1 (SITE GRADING) PERMIT CONDITIONS READ NOW!! Attachment to 2040 W. Wayzata Blvd. (Orono Senior Housing) Phase 1 grading permit. Terms and Conditions of Permit 1. This permit is subject to the terms and conditions of the PUD 2B Agreement,a copy of which is attached hereto. 2. Permit approval is based on the approved Site Plan(Sheet C2-1, latest revision 12-17-01) and the approved Grading/Drainage/Erosion Control Plan (Sheet C3-1, latest revision 12- 17-01) and is subject to ongoing review and site inspections by the City. Any changes to plans require City approval. 3. Orange silt fence shall be installed and maintained in place and in functional condition at all times, subject to Minnehaha Creek Watershed District requirements. 4. Tree removal shall occur only within the limits established by silt fencing as shown on the approved plans. 5. In the event that site activities result in spillage of fill materials on adjacent roadways, contractor shall be responsible for maintaining area roadways in a clean condition on a daily basis or as may be required by the City. 6. In the event that excess fill is to be hauled off-site, be advised that any location in Orono to be receiving such fill must first have obtained the appropriate permits from the City (more than 500 cubic yards to any single receiving site requires a 60-day conditional use permit review process). 7. This permit covers only the Phase 1 Improvements as listed in the attached Phase 1 Site Grading Cost Estimate. A separate permit will be required for the Phase 2 Improvements which include all work shown on the attached Phase 2 Utilities and Street Improvements Cost Estimate. 8. THIS PHASE 1 IMPROVEMENTS PERMIT WILL BE REVOKED IF THE PHASE 1 LETTER OF CREDIT IS NOT RECEIVED AT THIS OFFICE BY 4:30 P.M. ON WEDNESDAY, DECEMBER 26, 2001. IF THIS PERMIT IS REVOKED, THE CITY WILL ORDER ALL WORK AT THE SITE TO BE STOPPED BEGINNING AT 8:00 A.M. ON THURSDAY DECEMBER 27,UNTIL THE LETTER OF CREDIT IS RECEIVED AT WHICH TIME THE PERMIT WILL BE REINSTATED. 9. Commencement of the Phase 2 (Utilities and Street) Improvements may not commence until a Phase 2 Improvement Permit is issued, which we anticipate will be in the spring of 2002. Such permit will not be issued until the Phase 2 Letter of Credit is received. 10. This permit does not cover the following activities which require separate permits: - Foundation and building construction -Utility connections to building - Building systems (plumbing, mechanical, electrical, etc.) Sheet 1 of 4 11. Construction trailer is approved to be located near the northeast corner of the site. Any temporary lighting shall be directed away from adjacent properties. 12. Do not commence site grading or improvements until all other agency permits have been obtained (Mn/DOT, MCWD, etc.). 13. Applicant is advised that City will coordinate with the developer prior to commencing burial of existing power lines, installation of street lighting along Brown Road and Highway 12, and other off-site improvements for which the City is responsible. 14. Hours of construction activity(use of power equipment) limited by Orono Ordinance 155 to between the hours of 7:00 a.m. and 8:00 p.m. weekdays and 8:00 a.m. to 8:00 p.m. on weekends and holidays. Sheet 2 of 4 CITY OF ORONO ORONO WOODS APARTMENTS COMMERCIAL SITE DEVELOPMENT PLAT FILE NO. 2641 SITE IMPROVEMENT COST ESTIMATE: PHASE 1-SITE GRADING EST. UNIT EST. ITEM UNIT QUANTITY PRICE COST Mobilization LS 1 $5,000.00 $5,000 Site grading LS 1 20,000.00 20,000 Common excavation CY 2300 5.00 11,500 Landscaping LS 0.25 40,000.00 10,000 Retaining wall SF 320 15.00 4,800 Silt fence LF 1500 3.00 4,500 Estimated Construction Cost $55,800 +50% Security Deposit 27,900 Total Security Deposit Required $83,700 Sheet 3 of 4 CITY OF ORONO ORONO WOODS APARTMENTS COMMERCIAL SITE DEVELOPMENT PLAT FILE NO. 2641 kr SITE IMPROVEMENT COST ESTIMATE: PHASE2-UTILITIES AND STREET EST. UNIT EST. ITEM UNIT QUANTITY PRICE COST Stabilization fabric SY 4000 1.00 4,000 Aggregate base, Cl. 4, 100% crushed TN 1900 11.00 20,900 Aggregate base, CI. 5, 100% crushed TN 1900 11.00 20,900 Type 31 bit. base course TN 600 32.00 19,200 Type 41 bit. wear course TN 300 35.00 10,500 Bituminous material for tack GL 400 1.00 400 Concrete curb and gutter LF 1910 8.00 15,280 Landscaping LS 0.75 40,000.00 30,000 Concrete walk SF 3000 3.00 9,000 6" DIP LF 160 20.00 3,200 8" DIP LF 980 25.00 24,500 DIP fittings LB 3000 1.00 3,000 6" gate valve & box EA 5 800.00 4,000 8" gate valve & box EA 3 1,000.00 3,000 Hydrant EA 3 1,500.00 4,500 Connect to existing water main EA 2 1,000.00 2,000 12" HDPE storm sewer LF 565 15.00 8,475 12" RCP storm sewer LF 171 25.00 4,275 15" RCP storm sewer LF 405 30.00 12,150 21" RCP storm sewer LF 85 35.00 2,975 21" RCP FES EA 1 1,000.00 1,000 Class III riprap CY 8 50.00 400 Connect to existing storm MH EA 1 1,000.00 1,000 Storm catch basin w/casting EA 7 1,200.00 8,400 Storm catch basin MH w/casting EA 7 1,500.00 10,500 6" PVC sanitary sewer LF 180 15.00 2,700 8" PVC sanitary sewer LF 550 23.00 12,650 Improve pipe foundation LF 550 1.00 550 8"x6" wye EA 1 50.00 50 Sanitary MH w/casting EA 3 1,800.00 5,400 Construct MH over existing line EA 1 3,000.00 3,000 Connect to existing sanitary sewer EA 2 1,000.00 2,000 Remove existing sanitary sewer LF 380 5.00 1,900 Estimated Construction Cost $251,805 +50% Security Deposit 125,903 Total Security Deposit Required $377,708 Sheet 4 of 4 .,., A ('- i !I FF u )/-0v) g O ow 0Yeo��. \� C {' 17-- - 1 '3-- 0l 6. ' O0 G0)1- _ ,;, . , i\A a\pe COw\10oony 0/1o\ne IAmOQh Ma-t\- Ate( rrc,:. C:}-y o ro r\t) c;1S� - aLf 9- Li 60 O ;, c ., 6 cocAs 45., 3,h3 - Kui- r�i. , /1/4/it/A i ��r 6 E S 95-z - 465 - 29'/ C ,p4r1 3a.)K tr7 (oa- %5'-'78,X0 ---- ,/` F# eta? loses d We 11. Gee a 0\(, 0 gs2 - 2� 9 ( “Z) 11 c,,1 - -�,,ber r- Ocono 95 .2 - 2_(-0--L/600r il ie,L 0 AiS6.4) quo C y-j--- Ai dtemo/u0 `7 "-2 - 0 it -516_00 i � L 1/ C.:s 0444i7\) a FGO `< ti f: � Le- 1- 7/0 �z, v ,, lig`: 7-/'- r. _ 2, G- 9Z/ a r 1 il i t ... t PRECONSTRUCTION MEETING CITY OF ORONO Orono Senior Housing BRA File No.: 139-01-000 Plat#2641 December 13, 2001, 9:00 am Orono City Hall 1. INTRODUCTIONS, SIGN IN SHEET 2. PROJECT INFORMATION Project Manager: BRA Inspector: Tom Kellogg, (651) 604-4863, Harlan Olson, (612) 961-5466 Orono Contact: Plan Sheets:Dated 11-30-01 and any supplemental City comments Standard Construction Details: City Standard Details, January 2000 3. SCHEDULE: _ j a. Start date: l � b. Estimated Completion Date/J� / . 4. INTERIM COMPLETION DATE(S): a. Grading f CRl d 1D LAS •""'" Gfr/AT-- 10/451 b. Utilities "Y ,t-0P e ^ sf �� ,CO ) t,,c1/ c. Building 0* Z 5. PERMITS/EASEMENTS/FNANCIAL GUARANTEES: a. Health Department, MPCA, MnDOT b. MPCA General Storm Water c. Developer Financial Guarantee d. Fox Ridge Road Financial Guarantee • 6. PROJECT COORDINATION: a. Fox Ridge Road b. City utilities(water, sewer) 7. PRIVATE UTILITIES: a. Xcel Energy b. Reliant Energy c. Qwest Communications d. Mediacom e. Others 8. CONTRACTORS CONTACT PEOPLE&PHONE NUMBERS: need to submit 114,1 / L4)/(/ 9. HOURS OF OPERATION: eV � a. Monday-Friday: 7:00 AM to 8:00 PM b. Saturdays, Sundays and Holidays: 8:00 AM to 8:00 PM emoolaikollesikiligiaranialaW 10. SUPPLIERS: need to submit Orono Ambar Senior Housing Preconstruction Meeting December 13, 2001 9:00 a.m. Introductions and Attendance List Utility Companies Final Construction Plans Status of Plan Review Letter of Credit, LOC Reductions. Permits MCWD City MNDOT Personnel City Engineer, Tom Kellogg City Building, Inspector Marc Davis City Building Official Lyle Oman City Site Inspector Matt Bolterman Contractor Personnel 24 Hour Contact Construction Limits City Testing Required, Tom Kellogg Project Schedule Noise Control I 9C-2- — ?3.5---,g65?) X41 ?tz•qr-III DB2 dig