My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8-5-20 Septic Design
Orono
>
Property Files
>
Street Address
>
W
>
Wear Circle
>
2850 Wear Circle - 33-118-23-34-0008
>
Septic
>
8-5-20 Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:50:36 PM
Creation date
10/5/2021 3:54:54 PM
Metadata
Fields
Template:
x Address Old
House Number
2850
Street Name
Wear
Street Type
Circle
Address
2850 Wear Circle
Document Type
Septic
PIN
3311823340008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24910 Territorial Road, Rogers, Minnesota 55374 - 763-428-4489 <br />info@endeseptic.com • www.endeseptic.com <br />Project: 2850 Wear Circle Orono, MN <br />A septic compliance inspection was completed, and the system is compliant <br />according to MPCA codes for Chapter 7o8o and local codes for the City of <br />Orono in Hennepin County. During a tank inspection in the spring it was <br />found that the tank risers leak excessively as well as the tank lid during the <br />springtime and times of heavy rains. Though the tanks are compliant it has <br />been decided to replace the septic tanks. <br />The existing tanks will be pumped, crushed, and abandoned. The new tanks <br />will be placed slightly north in a new area of the yard. The mainline will be <br />dug back to the home and a new 30 feet of mainline will be installed. The <br />new mainline will lead to the new 2000 -gallon Brown Precast septic tank. <br />(Model #2000 -ST) From the septic tank effluent will gravity feed a l000 - <br />gallon Brown Precast pump tank. (Model #i000PT) A new Gould WE0511H <br />pump will be installed, new piping and a new demand dose electrical panel. <br />The new pump tank will then be connected to the existing mound supply <br />line. Upon completion of the installation of the new tanks all the manhole <br />covers will be brought to grade. All work must be completed according to the <br />MPCA codes for Chapter 7o80. <br />Tristan Ende <br />Ende Septic Service <br />LIC#C92o6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.