Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
07-20-2019 Septic Design
Joseph Olson D.B.A. Rusty Olson's--Soil and Percolation Testing Joseph J. Olson--MPCA License # 810 11481 Riverview Rd. NE, Hanover, MN 55341 (763) 498-8779 Fax (763) 498-8290 July 20, 2019 Arla Engleman 315 Old Crystal Bay Road N. Orono, Hennepin County This on-site Sewage Treatment System is designed for a Type 1 four-bedroom home in accordance with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. The periodically saturated soils were located at 14-20 inches (mottled soil). Due to the periodically saturated soils, a pressurized mound system with 6 inches of rock will need to be installed to treat the septic effluent. The bottom of the treatment area must be located at least 3' above the saturated soils. This system is designed with 6 inches of rock The existing septic system does not conform to the state code chapter 7080 All neighboring wells are greater than 100' from proposed treatment areas. The existing septic tanks must be abandoned and a 2250 -gallon septic tank needs to be installed or equivalent capacity. The existing supply line from the house to first tank may be cast iron. Remove as much of the cast iron pipe as possible and replace it with plastic pipe. Use 7132 Inch perforations must be used on the laterals. All new tanks need to be insulated if there is less than two feet of cover over the top of the tanks. Clean outs must be installed on the end of the laterals for maintenance. A 1250 -gallon pumping chamber will need to be installed to lift the effluent to the treatment area. The power supply and switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. A warning device must be installed with light and sound devices; this is in case of a pump failure. A flow measurement device must be installed. Including but not limited to a water meter, event counter, running time clocks or electronically controlled dosing. With proper installation and maintenance, this system should have no problem in treating septic effluent effectively. Nothing other than gray water, (laundry, showers, etc.) Human water and toilet tissue should be disposed of into the septic tanks. Iron filters cannot go into the septic sstem. Garbage disposals are not recommended. Additives must not be used they may cause harmful damage to your septic system. It is recommended that you pump the septic tanks every two years. Sincerely, L- / Joseph J. Olson m co 3 m.a .S I f w vMX2 7dn-•m w q -&O olemc ®j 4- w �Zm> f NAM - -o C 20.t w U p' .......... ............ 765.13 EXISTING HOUSE � - .. . 14 n 4- 9 - -o 20.t QED .. ' e 24.0 ....... - 65.2. .. EXISTING HOUSE � - .. . TI 4- 2411 purple code Mound Design www.SepticResource.com (uers 15.21 Property Owner: Arta Engleman Date: 7/20/2019 Site Address: 315 Old Crystal Bay Road N. PID: 3311823310004 Comments: instructions: = = enter data = adjust if desired = computer calculated - DO NOT CHANGE! 1)bedroom Type Residential System 2) 600 GPD design flow 3) Yes Garbage disposal or pumped to septic 50% larger tank with multiple comp/tanks 4) 2250 Gal Septic tank (code minimum) 225D Gal Septic tank (design size / LUG req'd) Tank options: none 5) 1.2 GPD/ftZ mound sand loading rate contour loading rate of =req's a min 50 ft. long rockbed b) 10.0 ft rockbed width 50.0 ft rockbed length 7) 3.0 ft lateral spacing 3.0 ft perforation spacing (maximum of 3 for both) end feed manifold connection 8) laterals 48.0 feet long 17.0 perfs / lateral 51 perfs total (1 /2 a perf means the first perf starts at the middle feed manifold) 9) 7/32 inch perfs at feet residual head gives 0.56 gpm flow rate per perforation for this perf size la spacing, l* pipe size on line 12, max perfs/lateral = 30 tine #8 must be less --> OK 10) 4.4 doses per day ( 4 minimum) )1) 150 gallons per dose (treatment volume) 2.00 5x )2) 2.00 inch diameter laterals must be used to meet "4x pipe volume" requirement 2.00 3x 13) 265 feet of 2.0 inch supply line leads to 45 gallons of drainback volume (Tip: "top feed" manifold to control the drainback) )4) 195 gallons TOTAL pump out volume (treatment * drainback) )s) 11 feet vertical lift from pump to mound laterals, leads to a: 16) 29 IGPM @ 24 feet of head, Pump requirement (note: >50gpm may require an extra 3-6' of head) 17) 500 gal Dose tank (code minimum) 1250 gal Dose tank (design size / LUG req'd) at 25.49 gpi Leads to a inch swing on Demand float, or timed dosing of6.7 min ON (confirm pump rate with drawdown (this delivers Average flow, =70% of Peak design flow}hrs OFF test and adjust as necessary) �) Ifl inchesfrom bottom of tank to "Pump OFF" float n)inches from bottom of tank to "Pump ON" float, orP33 inches to "Timer ON" float if time dosed z)) inches from bottom of tank to "Hi Level" float, or inches to "Hi Level" float if time dosed 25) 664 gallons reserve capacity (after High Level Alarm is activated) 7) 8) 0.45 gpd/ft' Absorption area Soil Loading Rate, which gives a mound ratio of2.7 (minimum) (this must match the soil boring log) desired mound ratio 2.7 percent site slope (0-20% range) V� I(% downslope site slope, if different than upslope) 16 inches, or 1.3 ft. to Redox or other limiting condition (need at least 12" to be a Type 1) Treatment zone contains=inches of 0% soil credit, and =inches of 50% soil credit. Giving a: 20 inch, or 1.7 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) 0.q ft. upslope and sideslope 17.0 ft. Downslope Individual slope ratios give BERM widths (topsoil beyond rockbed) of: 4:1 upslope ratio 12 ft. upslope berm 4:1 sideslope 17 ft. sideslope berms 4:1 downslope 2q ft. downslope berm Overall Dimensions: Upslope berm "i17iting Conal 10.0 ft. wide by 50.0 ft. long Rock bed 42 Zft. wide by 84 ft. long Mound footprint 4" inspection pipe e-- 18" cover on top 12 1 Clean sand lift 1.3 j 13epth to Limitin8 Absorption Width berm L 20 12" cover on sides (6" loamy cap & 6" topsoil) 27.E — — — — i_.— -- .. —— _ - Note: For 0 to 1% slopes, Absorption Width is measured from the Bedequally in both directions. For slopes >1%, Absorptfw7 Width is measured downhill from the upslope edge of the Bed Rock Bed: 10.0 fit. by 50.0 ft. by inches under pipe, plus 20% gives =yd' or *1.4= 24 ton Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) 33.3 up + 70.6 downslope + 14.9 ends + 35.5 under rock =185 yd' or *1.4= 259 ton plus 20% 5) Loamy Cap: 38 ft, by 80 ft. 6" deep, plus 20% gives 68 yd' or *1.4= 95 ton 6) Topsoil: 42 ft. by 84 ft. 6" deep, plus 20% gives FT9 yd' or *1.4= 111 ton I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. 5!�51- Rusty Olson"s Soil rt Perc 810 7/20/2019 igner Signature Company License# Date Installer Summary 2250 gallon Septic tank (minimum) Tank options: none au7a Larger LdnK WIM rnuuipre comer LanKs 1250 gallon Dose tank (minimum) at 25.49 gpi 29 GPM ft. of head, Pump required 7.7 inch swing on Demand float which translates to roughly 49 inches of float tether length if time dosing is required -->6.7 minutes ON time $ ®hours OFF time 20 inches from bottom of tank to "pump ON" float, or 12 inches to "timer ON" float 23 inches from bottom of tank to "Hi Level Alarm" or 33 inches to "Hi level alarm" if time dosed 265 ft. of 2.0 inch supply Eine with end feed manifold connection (Tip: "top feed" manifold to control drainback) 20 inch, or 1.7 ft. Sand Lift Mound 10.0 ft. wide by 50.0 ft. tong Rock bed 3 laterals 2.00 inch diameter 48.0 ft. long F 3.p ft. lateral spacing 7/32 inch perfs 3.0 ft. perforation spacing No Effluent filter if alarm 3 clean out ix valve box assemblies 27.0 ft.Total sand ABSORPTION width (minimum) 0- 07 ft. upslope and sideslope (sand beyond rockbed, minimum) 17.0 ft. Downslope (sand beyond rockbed, minimum) Specific slope ratios give BERM widths (topsoil beyond rockbed) of: 4:1 upslope ratioT]17� ft. upslope berm 4:1 sideslope ft. sideslope berms 4:1 downslope ft. downslope berm berm 1z MA 1.3 1-imititig Condition `- 4" inspection pipe r— 18" cover can top 12"' cover can sides (6" loamy cap & 6" topsoil) Clean sand lift Depth to Limiting ---- Absorption Width—�— ,— - Note: For 0 to 1" slopes, Absorption Width is measured from the Bedequally in both directions. For slopes >1, Absorption Width is measured downhill from the upslope edge of the Bed. Rock Bed: 17.0 yd3 or *1.4= 24 ton Mound Sand: 185 yd3 or *1.4= 259 ton Loamy Cap: 68 yd3 or *1.4m 95 ton Topsoil: 79 yd3 or *1.4= 111 ton inches under pipe calculation based on 3:1 /4:1 slope from top of rockbe, 6" deep 6" deep INSPECTOR CHECKLIST - mound 315 Uld Crystal bay Koad N. WELL setbacks: 20' to pressure tested sewer line (5 psi for 15 min) 50' to everything 100' to dispersal area with shallow well PROPERTY LINES setback: 10' to everything Road setback: platted: 10' prop line. Metes Et bounds: out of road easement, or outer ditch. LAKE/ BLUFF setback: 20' for bluff. Lakes: GD —, RD _, NE protected wetland _ Building, setbacks: 10' for everything, 20' for dispersal area. WATER LINE under pressure sc 10' to bed,tank Et sewer line. (else sewer line > 12" below) FjSewer line ix baffle connection (no 90's, 3' between 45's, slope min 1" in 8', max 2" in 8') (no depth reqs, clean out every 100', Sch 40 pipe) ElSeptic tank and risers (water tight, insulated, proper depth, existing verified by pumping) mfg 2250 gallons none Riser over outlet, riser over inlet or center, and 6"+ inspection pipe over any remaining baffles. No effluent filter & alarm Dose tank risers and piping (water tight, insulated, proper depth, drainback) Mfg 1250 gallons dose pump 29 gpm 24 head VERIFY PUMP CURVE 6.7 min ON 9 hr OFF float setting drop 7.7 inches at 25.5 gpi "DESIGNED" 4.9 inches approx float tether length 195.0 gal dose divided by gpi "INSTALLED" = inches float drop (field corrected LABEL pump requirements and drawdown on riser or panel Cam lock reachable from grade - 30" max. J -hook weep hole. Supply line access (no hard 90's) 2.0 inch supply pipe: Sch40, sloped 1/8"+, supported by 4" sch40 sleeve or compacted, and buried 6"+. splice box / control panel / electrical connections flow measurement: CT, ETM, time dosed, home water meter mound absorption area rough up mound rock dimensions 10.0 X 50.0 Sand lift depth 20 inches. (Jar test : 2" sand leaves < 1 /8" silt after 30 min) Absorption Sand beyond rock 0.0 upslope Bermed topsoil beyond rockbed 12 upslope cover depth of 12-18"+ VERIFY 3 laterals (1-2' from edge of rock) 2.00 inch pipe size (Sch40 pipe ft fittings) 3.0 ft lateral spacing 7/32 inch perforations 3.0 ft perforation spacing 17.0 downslope 17 sideslope 20 downslope Air inlet at end of laterals, and at top feed manifold if necessary. VERIFY clean outs (no hard 90's) 4" inspection pipe to bottom of rock, anchored VERIFY Abandon existing system - if necessary monitoring plan and type well abandonment form - if necessary �Re-use existing tank certification � � 0 � � > W E � E u _ 4-0 � � Ln a « J 2 � E � R � 9 I%', 2 2 8 � Xa 2 2 � \ k f � � ¥ � L I%', 2 2 8 2 c 0- ] ± £ � k � ? § W Xa 2 2 � # � � 2 c 0- ] ± £ � k � ? § Property Owner / project: Property Address / PID: Parent matl's: landscape position: soil survey map units: Soil Observation Log Owner Information Arla Englernan 315 Old Crystal Bay Road N. www.SepticResource.com vers 12.4 Date 7/19/2019 Soil Survey Information ❑ refer to attached soil survey ❑� Till ❑ Outwash ❑ Lacustrine ❑ Alluvium ❑ Organic ❑ Bedrock ❑ Summit ❑ Shoulder ❑� Side slope ❑ Toe slope L25A slope 3-5 % direction- Linear Soil Log #1 Boring ❑ pit Elevation 83.5 Depth to SH'WT 20 inches Depth (in) Texture fragment % matrix color redox color consistence grade shape 0-8 Topsoil <35 10yr3/1 Friable Moderate Blocky 8-14 Clay Loam <35 10yr4/3 Friable Strong Blocky 14-20 Clay Loam <35 10yr5/4 Friable Strong Blocky 20-26 Clay Loam <35 10yr5/4 10y4/8,1 -6/10y Firm Strong Blocky <35 loose loose single grain 35-50 friable weak granular blocky >50 firm moderate prismatic platy rigid strong massive Comments: 31J Uld Crystal 13ay lload N. Soil Log #2 ❑� Boring ❑ Pit Elevation 83.5 Depth to SHWT 16 inches Depth (in) 'Texture fragment % matrix color redox color consistence grade shape 0-6 Topsoil <35 10yr3/1 Friable Moderate Blocky 6-12 Clay Loam <35 10yr4/3 Friable Strong Blocky 12-16 Clay Loam <35 10yr5/4 Friable Strong Black% 16-24 Clay Loam <35 10yr5/3 10y4/8,1 -6/10y Firm Strong Blocky 315 Old Crystal Bay Road N. Soil Log #3 2] Boring ❑ Pit Elevation 82.1 Depth to SHWT 14 inches Depth (in) Texture fragment % matrix color redox color consistence grade shape 0-10 Topsoil <35 10yr3/1 Friable Moderate Blocky 10-14 Clay Loam <35 10yr4/3 Friable Strong Blocky 14-24 Clay Loam <35 10yr5/3 10y4/8,1 -6/10y Firm Strong Blocky <35 loose loose single grain 35-50 friable weak granular blocky >50 firm moderate prismatic platy rigid strong massive <35 loose loose single grain 35-50 friable weak granular blocky >50 firm moderate prismatic platy rigid strong massive 1 hereby certify this work was completed in accordance with MN 7080 and any local reqs. Rusty Olson's Soil & Pere. 810 Designer Signature Company License # UNIVERSITY �= OF MINNESOTA Septic System Management Plan for Above Grade Systems The goal of a septic system is to protect human health and the environment by properly treating wastewater before returning it to the environment. Your septic system is designed to kill harmful organisms and remove pollutants before the water is recycled back into our lakes, streams and groundwater. This management plan will identify the operation and maintenance activities necessary to ensure long- term performance of your septic system. Some of these activities must be performed by you, the homeowner. Other tasks must be performed by a licensed septic maintainer or service provider. However, it is YOUR responsibility to make sure all tasks get accomplished in a timely manner. The University of Minnesota's Septic ,System Owner's Guide contains additional tips and recommendations designed to extend the effective life of your system and save you money over time. Proper septic system design, installation, operation and maintenance means safe and clean water! Property Owner Email Property Address 315 Old Crystal Bay Road N PropertyID 331 1 82331 0004 system Designer Joseph J. Olson Contact Info 763-498-8779 System Installer Contact Info Service Provider/Maintainer Contact Info Permitting Authority Contact Info Permit # Date Inspected Keep this Management Plan with your Septic System Owner's Guide. The Septic System Owner's Guide includes a folder to hold maintenance records including pumping, inspection and evaluation reports. Ask your septic professional to also: • Attach permit information, designer drawings and as -built of your system, if they are available. • Keep copies of all pumping records and other maintenance and repair invoices with this document. • Review this document with your maintenance professional at each visit; discuss any changes in product use, activities, or water -use appliances. For a copy of the Septic System Owner's Guide, visit www.bookstores.umn.edu and search for the word "septic" or call 800-322-8642. For more information see http://septic.umn.edu Version: August 2015 UNIVERSITY OF MINNESOTA Septic System Management Plan for Above Grade Systems Your Septic System Sant —� - St1 a t 'IaL�stngtan��iolr Septic System Specifics System Type: I II III (IV* () V* ® System is subject to operating permit` (Based on MN Rules Chapter 7080.2200 — 2400) F]System uses UV disinfection unit* *Additional Management Plan required Type of advanced treatment unit Dwelling Type -- .Cleanout Number of bedrooms: 4 Manhole System capacity/ design flow (gpd): 600 ❑ Cased well Casing depth: 191 Anticipated average daily flow (gpd): 450 ❑ Other (specify): Comments Pump' _ _ Business? : 0 Y e N What type? 4Awal Aaanout. - Cross•sectkm of mount Inspedon pipe- . 7opsod___------- Sant —� - St1 a t 'IaL�stngtan��iolr Septic System Specifics System Type: I II III (IV* () V* ® System is subject to operating permit` (Based on MN Rules Chapter 7080.2200 — 2400) F]System uses UV disinfection unit* *Additional Management Plan required Type of advanced treatment unit Dwelling Type Well Construction Number of bedrooms: 4 Well depth (ft): 196 System capacity/ design flow (gpd): 600 ❑ Cased well Casing depth: 191 Anticipated average daily flow (gpd): 450 ❑ Other (specify): Comments Distance from septic (ft): 114 Is the well on the design drawing? (F)Y 0 N Business? : 0 Y e N What type? Septic Tank ❑ First tank Tank volume: 2250 gallons ❑ Pump Tank 1250 gallons Does tank have two compartments? (F)Y 0 N ❑ Effluent Pump make/model: ❑ Second tank Tank volume: gallons Pump capacity GPM ❑ Tank is constructed of Concrete TDH Feet of head ❑ Effluent screen:() Y (F) N Alarm ()Y !FJ N ❑ Alarm location Soil Treatment Area (STA) Mound/At-Grade area (width x length): 42 ft x 84 ft El Rock bed size (width x length): 10 ft x 50 ft Inspection ports Cleanouts Location of additional STA: NIA Surface water diversions Type of distribution media: Rock Additional STA not available -2- UNIVERSITY Septic System Management Flan t�k for Above Grade Systems OF MINNESOTA Homeowner Management Tasks These operation and maintenance activities are your responsibility. Chart on page 6 can help track your activities. Your toilet is not a garbage can. Do not flush anything besides human waste and toilet paper. No wet wipes, cigarette butts, disposal diapers, used medicine, feminine products or other trash! The system and septic tanks needs to be checked every 24 months Your service provider or pumper/maintainer should evaluate if your tank needs to be pumped more or less often. Seasonally or several times per year • Leaks. Check (listen, look) for leaks in toilets and dripping faucets. Repair leaks promptly. • Soil treatment area. Regularly check for wet or spongy soil around your soil treatment area. if surfaced sewage or strong odors are not corrected by pumping the tank or fixing broken caps and leaks, call your service professional. Untreated sewage may make humans and animals sick Keep bikes, snowmobiles and other traffic off and control borrowing animals. • Alarms. Alarms signal when there is a problem; contact your service professional any time the alarm signals. • Lint falter. If you have a lint filter, check for lint buildup and clean when necessary. If you do not have one, consider adding one after washing machine. • Effluent screen. If you do not have one, consider having one installed the next time the tank is cleaned along with an alann. Annually • Water usage rate. A water meter or another device can be used to monitor your average daily water use. Compare your water usage rate to the design flow of your system (listed on the next page). Contact your septic professional if your average daily flow over the course of a month exceeds 70% of the design flow for your system. • Caps. Make sure that all caps and lids are intact and in place. Inspect for damaged caps at least every fall. Fix or replace damaged caps before winter to help prevent freezing issues. • Water conditioning devices. See Page 5 for a list of devices. When possible, program the recharge frequency based on water demand (gallons) rather than time (days). Recharging too frequently may negatively impact your septic system. Consider updating to demand operation if your system currently uses time, • Reviewyour water usage rate. Review the Water Use Appliance chart on Page 5. Discuss any major changes with your service provider or pumper/maintainer. During each visit by a service provider or pumper/maintainer Make sure that your service professional services the tank through the manhole. (NOT though a 4" or 6" diameter inspection port.) Ask how full your tank was with sludge and scum to determine if your service interval is appropriate. • Ask your pumper/maintainer to accomplish the tasks listed on the Professional Tasks on Page 4. -3- UNIVERSITY Septic System Management Plan OF MINNESOTA for Above Grade Systems Professional Management Tasks These are the operation and maintenance activities that apumper/maintainerperforms to Help ensure long- term performance of your system. At each visit a written report/record must be provided to homeowner. Plumbing/Source of Wastewater Review the Water Use Appliance Chart on Page 5 with homeowner. Discuss any changes in water use and the impact those changes may have on the septic system. Review water usage rates (if available) with homeowner. Septic Tank/Pump Tanks • Manhole lid. A riser is recommended if the lid is not accessible from the ground surface. Insulate the riser cover for frost protection. • Liquid level. Check to make sure the tank is not leaking. The liquid level should be level with the bottom of the outlet pipe. (If the water level is below the bottom of the outlet pipe, the tank may not be watertight. If the water level is higher than the bottom of the outlet pipe of the tank, the effluent screen may need cleaning, or there may be ponding in the soil treatment area.) • Inspection pipes. Replace damaged or missing pipes and caps. • Baffles. Check to make sure they are in place and attached, and that inlet/outlet baffles are clear of buildup or obstructions. • Effluent screen. Check to make sure it is in place; clean per manufacturer recommendation. Recommend retrofitted installation if one is not present. • Alarm. Verify that the alarm works. • Scum and sludge. Measure scum and sludge in each compartment of each septic and pump tank, pump if needed. Pump • Pump and controls.. Check to make sure the pump and controls are operating correctly. • Pump vault. Check to make sure it is in place; clean per manufacturer recommendations. • Alarm. Verify that the alarm works. • Drainback. Check to make sure it is draining properly. Event counter or elapsed time meter. Check to see if there is an event counter or elapsed time meter for the pump. If there is one or both, calculate the water usage rate and compare to the anticipated use listed on Design and Page 2. Dose Volume: gallons: Pump run time: Minutes Soil Treatment Area • Inspection pipes. Check to make sure they are properly capped. Replace caps and pipes that are damaged. • Surfacing of effluent. Check for surfacing effluent or other signs of problems. • Lateral flushing. Check lateral distribution; if cleanouts exist, flush and clean at recommended frequency. • Vegetation - Check to see that a good growth of vegetation is covering the system. All other components — evaluate as listed here: -4- UNIVERSITY Septic System Management Plan OF MINNESOTA for Above Grade Systems Water -Use Appliances and Equipment in the Home Appliance Impacts on System Management Tips • Uses additional water. • Use of a garbage disposal is not recommended. • Adds solids to the tank. . Minimize garbage disposal use. Compost instead. Garbage disposal Finely -ground solids may not settle. y To prevent solids from exiting the tank, have your Unsettled solids can exit the tank tank pumped more frequently. and enter the soil treatment area. - Add an effluent screen to your tank. - Washing several loads on one day - Choose a front -loader or water -saving top -loader, uses a lot of water and may overload these units use less water than older models. your system. - Limit the addition of extra solids to your tank by • Overloading your system may using liquid or easily biodegradable detergents. Washing machine prevent solids from settling out in Limit use of bleach -based detergents and fabric the tank. Unsettled solids can exit softeners. the tank and enter the soil treatment - Install a lint filter after the washer and an effluent area. screen to your tank • Wash only full loads and think even — spread your laundry loads throughout the week. - Powdered and/or high -phosphorus - Use gel detergents. Powdered detergents may add detergents can negatively impact the solids to the tank. Dishwasher performance of your tank and soil - Use detergents that are low or no -phosphorus. treatment area. - Wash only full loads. • New models promote "no scraping". They have a garbage disposal inside. . Scrape your dishes anyways to keep undigested solids out of your septic system. - Finely -ground solids may not settle. - Expand septic tank capacity by a factor of 1.5. Grinder pump (in home) Unsettled solids can exit the tank - Include pump monitoring in your maintenance and enter the soil treatment area. schedule to ensure that it is working properly. • Add an effluent screen. - Large volume of water may - Avoid using other water -use appliances at the same Large bathtub overload your system. time. For example, don't wash clothes and take a (whirlpool) • Heavy use of bath oils and soaps can bath at the same time, impact biological activity in your - Use oils, soaps, and cleaners in the bath or shower tank and soil treatment area. sparingly. Clean Water Uses Impacts on System Management Tips High -efficiency - Drip may result in frozen pipes - Re-route water directly out of the house. Do not furnace during cold weather. route furnace discharge to your septic system. Water softener • Salt in recharge water may affect - These sources produce water that is not sewage and Iron filter system performance. should not go into your septic system. Reverse osmosis - Recharge water may hydraulically - Reroute water from these sources to another outlet, overload the system. such as a dry well, draintile or old drainfield. • When replacing, consider using a demand -based - Water from these sources will Surface drainage overload the system and is recharge vs. a time -based recharge. Footing drains prohibited from entering septic . Check valves to ensure proper operation; have unit system. serviced per manufacturer directions -5- UNIVERSITY Septic System Management Plan OF MINNESOTA for Above Grade Systems 4 *'_'Mhke� 01!!Homeowner Maintenance Log `tip Track maintenance activities here for easy reference. See list of management tasks on pages 3 and 4. Activity Date accomplished Check frequently: Leaks: check for plumbing leaks* Soil treatment area check for surfacing** Lint filter: check, clean if needed` Effluent screen (if owner -maintained)*** Alarm** Fj_ Check annually: Water usage rate (maximum gpd ) Caps: inspect, replace if needed Water use appliances — review use Other: *Monthly **Quarterly * * * Bi -Annually Notes: "As the owner of this SSTS, I understand it is my responsibility to properly operate and maintain the sewage treatment system on this property, utilizing the Management Plan. if requirements in this Management Plan are not met, I will promptly notify the permitting authority and take necessary corrective actions. If I have a new system, I agree to adequately protect the reserve area for future use as a soil treatment system." Pro2erty Owner Signature: Date Management Plan Prepared By: Joseph J. Olson Certification # C1255 Permitting Authority: ©2015 regents of the University of Minnesota. All rights reserved. The University of Minnesota is an equal opportunity educator and employer. This material is available in alternative formats upon request. Contact the Water Resources Center, 612-624-9282, The Onsite Sewage Treatment Program is delivered by the University of Minnesota Extension Service and the University of Minnesota Water Resources Center.