HomeMy WebLinkAbout09-13-2019 Septic DesignJoseph Olson D.B.A.
Rusty Olson's--Soil and Percolation Testing
Joseph J. Olson--MPCA License # 810
11481 Riverview Rd, NE, Hanover, MN 55341
(763) 498-8779 Fax (763) 498-8290
July 21, 2018
Gordon James
225 Old Crystal Bay Load S.
Orono, Hennepin County
This on-site Sewage Treatment System is designed for a Type 1 five -bedroom home in accordance with the
Minnesota Pollution Control Agency Chapter 7080 and local ordinances.
The periodically saturated soils were located at I8-22 inches (mottled soil). The existing mound system is
going to be used.
The existing septic system does conform to the state code chapter 7080
All neighboring wells are greater than 100' from proposed treatment areas.
The soils at a depth of 12" have a percolation rate averaging 3 MPI.
The existing septic tanks must be abandoned. New septic tanks need to be installed that meets 2250 -gallon
septic tank capacity.
All new tanks need to be insulated if there is less than two feet of cover over the top of the tanks. Clean
outs must be installed on the end of the laterals for maintenance.
A 1300 gallon pumping chamber will need to be installed to lift the effluent to the treatment area. The
power supply and switches must be located outside the manhole and pumping chamber in a weatherproof
enclosure. A warning device must be installed with light and sound devices; this is in case of a pump
failure. A flow measurement device must be installed. Including but not limited to a water meter, event
counter, running time clocks or electronically controlled dosing.
With proper installation and maintenance, this system should have no problem in treating septic effluent
effectively. Nothing other than gray water. (laundry, showers, etc.) Human water and toilet tissue should be
disposed of into the septic tanks. Iron filters cannot go into the septic system Garbage disposals are not
recommended. Additives must not be used they may cause harmful damage to your septic system. It is
recommended that you pump the septic tanks every two years.
Sincerely,
Joseph J. Olson
_ y Sao C, aeall S89"04'55" E 261.9
I �
� � (xa• c., 9af. `c9r.
/ x''722• � � ✓ i.•'99a.3 � CG�9e,. + r
9s. e w rBz� z v
/x cosr
r
\ --._--EDGE CF WE'-AN:',
SSL= �� 1
WOORS-
�µ S3 35' WETLAIND
\ \ a \ \ SETBACK ti !1 / 1 '! I. �'1 :0
� I I
-%94;4 I \ Trr �\ / \ J •� 1 �\ r4' i
-- 0 EP1VG -
zr 99ia i
9914 A b 99 I {� F 11
WOODS \ = r
Jho `i— _ _ _
3"
J _41
-
548
vL4s7
r 1E � / 990a 90, a995�� �P=. �{�` f �•
�y, T9-'sax " .'yj(` m •a 5a�
' 1 i 130 % 1` %t9°6 �gss�9.�,e �x •. I9� , ..,7{48; ,..
3S 9 ej
cl
!p z- UVYC a y o
d YV ll0 ul
999 - •9�+ - - li
'P 25' '•� � � " � I �
934'4a I SCK 275 i7(p Op,E a + � x'_1.2
I _ 1\�3• ; _ _ N cRrs
'~/993.3 I W xSEPryC w.wr \ �^
� V5.11 � _ 9996 " • '� v../
Q
\ E J4[K 7g0
also
WOODS
•'�`'�3x 1 WOODS
993.4��r�ssg6
WOODS \ . CONC i
99Ea \ 'i 12.11 --Sieve
C-�93.yy�/
-9964 @ N89°25'161'W 25�2.5f-� �`'�_ •'`�s _�%seas;=-,2,.
p
z
"CGO7
n
ro
h
I
V�
rF
LP
c
�
-fi
CL
12
'"'
we
Li(ppo
NJ
3
'o
ID
j
ro
,�
A"
14
•�,
_L
I
IC
CL
as
,�
to
2011 purple code Mound Design
Wwmr .^tiPn4irR acne ima r I-- I c ->>
Property Owner: Gordon James Date: 7/21/2018
Site Address: 225 Old Crystal Bay Road S. PID: 0411723240002
Comments: Connect to the existing system r,mA, f
instructions: = = enter data �� = adjust if desired computer calculated - DO NOT CHANGE!
I bedroom Type Residential System
1� 750 GPD design flow
) Yes Garbage disposal or pumped to septic 50% larger tank with multiple comp/tanks
a 2250 Gal Septic tank (code minimum) 2250 Gal Septic tank (design size / LUG req'd)
Tank options: none
1.2 GPD/ft2 mound sand loading rate contour loading rate of 12 req's a min 62.5 ft. long rockbed
61 10.0 ft rockbed width =ft rockbed length
7 3.0 ft lateral spacing 3.0 ft perforation spacing (maximum of 3 for both)
Lend feed manifold connection
8; laterals 60.5 feet long 21.0 perfs / lateral 63 perfs total
(1 /2 a perf means the first perf starts at the middle feed manifold)
Q =inch inch perfs at feet residual head gives 0.74 gpm flow rate per perforation
for this perf size & spacing, €t pipe size on line 12, max perfs/lateral = 25 line #8 must be less OK
doses per day (4 minimum)
e i 188 gallons per dose (treatment volume)
2.00 5x
12, 2.00 inch diameter laterals must be used to meet "4x pipe volume" requirement
2-00 3x
i;; 85 feet of 2.0 inch supply tine leads to 14 gallons of drainback volume
(Tip: "top feed" manifold to control the drainback)
1-E) 202 gallons TOTAL pump out volume (treatment + drainback)
s 9 feet vertical lift from pump to mound laterals, leads to a:
ic„ 47 GPM @ 20 feet of head, Pump requirement (nate: >50gpm may require an extra 3-6' of head)
i ri 750 gal Dose tank (code minimum) 7250 gal Dose tank (design size / LUG req'd) at 25.49 gpi
leads to a
is 7.9 inch swing on Demand float, or timed dosing of4.3 min ON (confirm pump rate with drawdown
(this delivers Average flow, =70% of Peak design flow)Mhrs OFF test and adjust as necessary)
inches from bottom of tank to "Pump OFF' float
20 inches from bottom of tank to "Pump ON" float, orM33
inches to "Timer ON" float if time dosed
s 23 inches from bottom of tank to "Hi Level" float, or inches to "Hi Level" float if time dosed
-, 664 gallons reserve capacity (after High Level Alarm is activated)
2011 purple code Mound Design
www.SepticResource.com (vers 15.2)
Property Owner: Gordon James Date: 7/21/2018
Site Address: 225 Old Crystal Bay Road S. PID: 0411723240002
Comments: Future Site
instructions: 0 = enter data = adjust if desired = computer calculated - DO NOT CHANGE!
bedroom Type Residential System
750 GPD design flow
Yes Garbage disposal or pumped to septic 50% larger tank with multiple comp/tanks
4 2250 Gal Septic tank (code minimum) 2250 Gal Septic tank (design size / LUG req'd)
Tank options: none
,, 1.2 GPD/ftz mound sand loading rate contour loading rate of =req's a min 62.5 ft. long rockbed
c 10.0 ft rockbed width 62.5 ft rockbed length
7t 3.D ft lateral spacing 3.0 ft perforation spacing (maximum of 3 for both)
end feed manifold connection
laterals bD.S feet long 21.0 perfs / lateral 63 perfs total
(1 /2 a perf means the first perf starts at the middle feed manifold)
Q1 7132 inch perfs at feet residual head gives 0.56 gpm flow rate per perforation
for this perf size Et spacing, Et pipe size on line 12, max perfs/lateral = 30 line #8 must be less > OK
i 4.0 doses per day (4 minimum)
i 188 gallons per dose (treatment volume)
2.00 5x
2.OD inch diameter laterals must be used to meet "4x pipe volume" requirement
2.00 3x
r ; feet of 2.0 inch supply line leads to =gallons of drainback volume
(Tip: "tap feed" manifold to control the drainback)
i r) 188 gallons TOTAL pump out volume (treatment +drainback)
i;) 0 feet vertical lift from pump to mound laterals, leads to a:
s0, 36 GPM @ I�Jfeet of head, Pump requirement (note: >50gpm may require an extra 3-6' of head)
i7 750 gal Dose tank (code minimum) 1250 gal Dose tank (design size / LUG req'd) at 25.49 gpi
leads to a
is 7.4 inch swing on Demand float, or timed dosing of5.2 min ON (confirm pump rate with drawdown
(this delivers Average flow, =70% of Peak design flow)hrs OFF test and adjust as necessary)
12 inches from bottom of tank to "Pump OFF" float
} 19 inches from bottom of tank to "Pump ON" float, or12 inches to "Timer ON" float if time dosed
,i 2Z inches from bottom of tank to "Hi Level" float, or F32 inches to "Hi Level" float if time dosed
689 gallons reserve capacity (after High Level Alarm is activated)
23) O.b0 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2 (minimum)
(this must match the soil boring log) desired mound ratio 2.0
14) percent site slope (0-20% range) �(% downslope site slope, if different than upslope)
25j 18 inches, or 1.5 ft. to Redox or other limiting condition (need at least 12" to be a Type l)
Treatment zone contains inches of 0% soil credit, and F 70inches of 50% soil credit. Giving a:
26) 18 inch, or 1,5 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONSN!
rn 20.0 ft.Totat ABSORPTION width (with sand beyond rockbed as follows:)
'R) OA ft. upslope and sideslope
10.0 ft. Downslope
Individual slope ratios give BERM widths (topsoil beyond rockbed) of:
upslope ratio 9 ft. upslope berm
soy 3:1 sideslope 12 ft. sideslope berms
downslope 18 ft. downslope berm
3'-) Overall Dimensions:
Upslope berm
10.0 ft. wide by 62.5 ft. long Rock bed
37 ft. wide by 1 87 ft. long Mound footprint
4" inspection pipe
r- 18" cover on top
Downslope berm
12" cover on sides
(6" loamy cap &. 6" topsoil,,
1.5 Clean sand lift
1.5 Depth to Limiting
Limiting Condition - — — _ — — --
Absor tion Width 20.0
Note:
For 0 to 1% slopes, Absorption Width is measurecl from the Bedequally in bath directions.
For slopes >1%, Absorption Wdtfiis measured downhill from the upslope edge of the fled.
Rock Bed:.
10.0 ft. by 62.5 ft. by inches under pipe, plus 20% gives =yd' or "1.4= 2g ton
4l Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired)
23.7 up + 52.4 downslope + 10.7 ends + 41.7 under rock =154 yd' or "1.4= 216 ton
plus 20%
Loamy Cap:
33 ft. by 83 ft. 6" deep, plus 20% gives =yd' or "1.4= J 85 ton
„ Topsoil:
37 ft. by 87 ft. 6" deep, plus 20% gives =yd' or "1.4= 101 ton
I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws.
Signature
Rusty Olson"s Soil €t pert 810
Company
L"-Uf I]Ctf
7/21/2018
Date
Property Owner / project:
Property Address / PID:
Soil Observation Log
Owner Information
Gordon James
225 Old Crystal Bay Road S
NN,,N w.SepticResource.conj %ers 12.4
Date 1/6/2016
Soil Survey Information ❑ refer to attached soil survey
Parent rnatl's: E] Till ❑ Outwash ❑ Lacustrine ❑ Alluvium ❑ Organic ❑ Bedrock
landscape position: ❑ summit ❑ Shoulder [f Side slope ❑ Toe slope
soil survey map units: 1023D slope 6 % direction- Linear. Convex
Soil Log #I
Depth (in)
E Boring
'Texture
❑ pit
fragment %
Elevation
matrix color
986.7 Depth
redox color
to SHWT
consistence
l 8"
shape
grade
0-14
Topsoil
<35
10yr3/2
Loose
Loose
Single grain
14-18
Loath
<35
1Oyr4/3
Friable
Strong
Wockx
18-30
Clay Loam
<35
2.5y 5/3
I Oy4/8,1-6/1 Oy
Firm
Strong
Prismatic
<35
loose
loose
single wain
35-50
friable
weak
granular blt)ckN
>54
firm
moderate
pris vatic plat,
rigid
strong
tTtt955ni'
<35
loose
loose
sin"le grain
35-50
friable
weak
granular bkla.�
>50
firnn
moderate
prismatic plat}
rigid
strong
11111SX15e
Comments:
########
Soil Log #2
[Q Boring ❑ Pit
Elevation 986.7 Depth to SHWT
26"
Depth (in)
Texture
fragment %
matrix color
redox color
consistence
ti=rade
shape
0-14
Topsoil
<35
IOyr3/2
Loose
Loose
SinalQLraill
14-18
Lown
<35
10yr4/3
Friable
Strong
BlockN
18-26
Clay Loam
<35
10yr5/4
Finn
Strong
Block.
26-30
Clay Loam
2.5y5/3
10} 418,1-6/IOy
Finn
Strong
I'rismmie
225 Old Crystal Bay Road S
Soil Log 43
Q Boring
❑ Pit
Elevation
985.4 Depth to SHWT
24"
Depth (in)
Texture
fragment %
matrix color
redox color
consistence
grade
shape
0-8
rill
<35
Loose
Loose
Single rrirr
8-24
Topsoil
<35
1Oyr3/2
Friable
Strong
Block
24-30
Clay Loam
<35
10yr4/3
1Oy4/8,1-6/IOy
Firm
Strong
Prismatic
<35
loose
loose
single grain
35-50
friable
weak
_ranular blo,k.
>50
finn
moderate
prisms,sic pi ah
rigid
stronu
5
masshe
<35
loose
loose
sinelc crc'in
35-50
friable
weak
aramdar block
>50
firm
moderate
prismatic liar
rigid
strong
11aY11%
I hereby cert this hark was completed in accordance with MN 7080 and any local reqs.
Designer Signature
Rusty Olson's Soil & Perc.
Company
810
License
225 Old Crystal Bay Road S
Soil Log #7
PBoring ❑ Pit
Elevation 9$6.7
Depth to SHWT 220"
Depth (in) Texture fragment %
matrix color redox color
consistence
grade
shape
0-10 Topsoil <35
10yr3/2
Loose
Loose
Single grain
10-16 Loam <35
10yr4/3
Friable
Strong
Blocky
16-22 Clay Loam <35
10yr5/4
Firm
Strong
Blocky
22-30 Clay Loam <35
2.5y5/3 10y4/8,1 -6/10y
Firm
Strong
Prismatic
225 Old Crystal Bay Road S
Soil Log
❑ Boring ❑ Pit
Elevation
Depth to SHWT
Depth (in) Texture fragment %
matrix color redox color
consistence
grade
shape
<35
loose
loose
single grain
35-50
friable
weak
granular blocky
>50
firm
moderate
prismatic platy
rigid
strong
massive
<35
loose
loose
single grain
35-50
Friable
weak
granular blocky
>50
firm
moderate
prismatic platy
rigid
I strong
massive
<35
loose
fi iabl
loose
single grain
35-50
e
weak
granular blocky
>50
firm
moderate
prismatic platy
strong
massive
<35
loose
loose
single grain
35-50
friable
weak
granular blocky
>50
firrrt
moderate
prismatic platy
rigid
strong
massive
<35
loose
loose
single grain
35-50
friable
weak
granular blocky
>50
firm
moderate
prismatic platy
rigid
strong
massive
1 hereby certify this work was completed in accordance with MN 7080 and any local reqs.
Rusty OIson`s Soil & Perc.
810
signer Signature
Company
License
Percolation Test Data Sheet
Lic.#810
Percolating test readings made by: Rusty Olson's Perc. starting at 10:50 A.M. On 1106116
Location: 225 Old Crystal Bay Road S.
Hole number: 1
Date hole was prepared: 1105/16
Depth of hole bottom _12", inches, Diameter of hole 6" inches.
Soil data from test hole:
Depth, inches Soil texture
0-12 Dark Brown Loam 10yr3/2
Method of scratching side wall: Knife
Depth of gravel in bottom of hole 2 inches:
Date of initial water filling 1/05116 depth of initial water filling 12 inches above the hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic Siphon
Maximum water depth above hole bottom during tests 6 inches
Time
Time
Depth
Drop in H2O
Perc Rate
11:01
11:16
6"
4.2
3.6
11:19
11:34
6"
4.1
3.7
11:35
11:50
6"
4.1
3.7
AVERAGE FERC. RATE 3.7 MPI
Percolation Test Data Sheet
Lic.#810
Percolating test readings made by: Rusty Olson's Perc. starting at 10:50 A.M. On 1/06/16
Location: 225 Old Crystal Bay Road S.
Hole number: 2
Date hole was prepared: 1/05/16
Depth of hole bottom _12"_ inches, Diameter of hole 6" inches.
Soil data from test hole:
Depth, inches Soil texture
0-12 Dark Brown Loam 10yr3/2
Method of scratching side wall: Knife
Depth of gravel in bottom of hole 2 inches:
Date of initial water filling 1/05/16 depth of initial water filling 12 inches above the hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic Siphon
Maximum water depth above hole bottom during tests 6 inches
11:02
11:17
6"
5.5
2.7
11:18
11:33
6"
5.5
2.7
11:36
11:51
6"
5.5
2,7
AVERAGE PERC. RATE 2.7 MPI
Minnesota Pollution
Control Agency Compliance Inspection Form
520 Lafayette Road North Existing Subsurface Sewage Treatment Systems
St. Paul, NIN 55155-4194 (SSTS)
Doc Type: Compliance and Enfot ., men1
Instructions: Inspection results based on Minnesota Pollution Control Agency (MPGA) For local tracking purposes:
requirements and attached forms - additional local requirements may also apply.
Submit completed form to Local Unit of Government (LUG) and system owner
within 15 days
System Status
System status on date (mmlddlyyyy): 712012018
Compliant - Certificate of Compliance ❑ Noncompliant - Notice of Noncompliance
(Valid for 3 years from report date, unless shorter time (See Upgrade Requirements on page 3)
frame outlined in Local Ordinance.)
Reason(s) for noncompliance (check all applicable)
❑ Impact on Public Health (Compliance Component #1) - Imminent threat to public health and safety
❑ Other Compliance Conditions (Compliance Component #3) - Imminent threat to public health and safety
❑ Tank Integrity (Compliance Component #2) - Failing to protect groundwater
❑ Other Compliance Conditions (Compliance Component #3) - Failing to protect groundwater
❑ Soil Separation (Compliance Component #4) -Failing to protect groundwater
❑ Operating permit/monitoring plan requirements (Compliance Component #5) - Noncompliant
Property Information Parcel ID# or SeclTwplRange: 0411723240002
Property address: 225 Old Crystal Bay Road S., Orono, MN Reason for inspection: New Construction
Property owner: Jason Pitts _ - - _ - — - Owner's phone:
or
Owner's representative: - Gordon James _ _ Representative phone: 763-479-3117
Local regulatory authority: _ City of_O_rono _ _ - Regulatory authority phone: 952-249-4600
Approximately 1-1000, 1-1000 gallon septic tanks,1-1000 gallon lift station and 625 square feet of
Brief system description: mound rockbed.
Comments or recommendations:
TBM: Top of S.W. Corner iron EL -996.4. The existing system has 1.3 feet of sand. The existing tanks are to be abandoned.
Certification
I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No
determination of future system performance has been nor can be made due to unknown conditions during system construction,
possible abuse of the system, inadequate maintenance, or future water usage.
Inspector name: Josue J Olson Certification number: 1255
Business name: Rust Ol on's Soil &_Per_c. Testis - _ - — License number: $10
Inspector signature: Phone number: 763-498-8779
Necessary or Locally Required Attachments
❑ Soil boring logs ® System/As-built drawing ❑ Forms per local ordinance
❑ Other information (list):
www.pca.state,mn.us 651-296-6300 800-657-3864 TTY 651.282-5332 or 800-657-3864 Available in alternative formats
wq-wwists4-31 • 1124112
Page1of3
Property address: 225 Old Crystal Bay Road S., Orono, MN
1. Impact on Public Health - Compliance component #1 of 5
Compliance criteria:
System discharge sewage to the ❑ Yes ® No
ground surface.
System discharge sewage to drain tile ❑ Yes ® No
or surface waters- - — -- — -- — - —
System cause sewage backup into ❑ Yes ® No
dwelling or establishment.
Any "yes" answer above indicates the system is
an Imminent Threat to Public Health and Safety.
Comments/Explanation:
2. Tank Integrity —Compliance component #2 of 5
_Compliance criteria:
System consists of a seepage pit, ❑ Yes [K No
cesspool, drywell, or leaching pit.
Seepage pits meeting 7080.2550 may be
compliant_if allowed in local ordinance.
Sewage tank(s) leak below their ❑ Yes ® No
designed operating doth. _
If yes, which sewage tank(s) leaks:
Any "yes" answer above indicates the - -
system is Failing to Protect Groundwater.
Comments/Explanation:
The tanks are to be abandoned.
Inspector initials/Date: J. O. 7120115
Verification method(s):
Searched for surface outlet
® Searched for seeping in yard/backup in home
❑ Excessive ponding in soil systemlD-boxes
❑ Homeowner testimony (See CommentslExplanation)
❑ "Black soil" above soil dispersal system
❑ System requires "emergency" pumping
❑ Performed dye test
❑ Unable to verify (See CommentslExplanation)
❑ Other methods not listed (See CommentslExplanation)
Verification method(s):
® Probed tank(s) bottom
Examined construction records
❑ Examined Tank Integrity Form (Attach)
❑ Observed liquid level below operating depth
❑ Examined empty (pumped) tanks(s)
❑ Probed outside tank(s) for "black soil'
❑ Unable to verify (See Comments/Explanation)
❑ Other methods not listed (See CommentslExplanation)
3. Other Compliance Conditions -Compliance component #3 of 5
a. Maintenance hole covers are damaged, cracked, unsecured, or appear to structurally unsound. []Yes* ®No ❑ Unknown
b. Other issues (electricalhazards, etc.) to immediately and adversely impact public health or safety. ❑ Yes* E No ❑ Unknown
*System is an imminent threat to public health and safety
Explain:
C. System is non -protective of ground water for other conditions as determined by inspector ❑ Yes' ® No
*System is failing to protect, groundwater
Explain:
www.pca.state.mn.us 651-2.96-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Availabte in alternative formats
wq-wwists4-31 • 1124112
Pa?e2of3
Property address: 225 Old Crystal Bair Road S., Orono, MN Inspector initials/Date: J. O. 7120I18
4. Soil Separation —Compliance component #4 of 5
Date of installation: _ _ Z Unknown
ShorelandNVellhead protection/Food Beverage ❑yes No
Lodging?
Compliance criteria:
For systems built prior to April 1, 1996, and ❑ Yes ❑ No
not located in Shoreland or Wellhead
Protection Area or not serving a food,
beverage or lodging establishment:
Drainfield has at least a two -foot vertical
separation distance from periodically
saturated soil or bedrock.
Non-performance systems built April 1, Yes ❑ No
1996, or later or for non-performance
systems located in Shoreland or Wellhead
Protection Areas or serving a food,
beverage, or lodging establishment:
Drainfield has a three-foot vertical
separation distance from periodically
saturated soil or bedrock.*
"Experimental", "Other', or "Performance" ❑ Yes ❑ No
systems built under pre -2008 Rules,- Type IV
or V systems built under 2008 Rules (7080.
2350 or 7080.2400 (Advanced Inspector
License required)
Drainfield meets the designed vertical
separation distance from periodically
saturated soil or bedrock.
Any "no" answer above indicates the system is
Failing to Protect Groundwater.
Verification method(s):
Soil observation does not expire. Previous soil
observations by two independent parties are sufficient.
unless site conditions have been altered or local
requirements differ.
❑ Conducted soil observation(s) (Attach boring logs)
❑ Two previous verifications (Attach boring logs)
❑ Not applicable (Holding tank(s), no drainfield)
❑ Unable to verify (See Comments/Explanation)
❑ Other (See Comments/Explanation)
Comments/Explanation:
Indicate depths of elevations
A._ Bottom of distribution media 991.5
B. _Periodically saturated soilibedrock 988.4
C._ System separation 3.1
D. Required compliance separation" 2.6
"May be reduced up to 15 percent if allowed by Local
Ordinance.
5. Operating Permit and Nitrogen BMP* —Compliance component #5 of 5 ® Not applicable
Is the system operated under an Operating Permit? ❑ Yes ❑ No It "yes", A below is required
Is the system required to employ a Nitrogen BMP? ❑ Yes ❑ No If "yes", B below is required
BMP=Best Management Practice(s) specified in the system design
if the answer to both questions is "no". this section does not need to be completed.
Compliance criteria _
a. Operating Permit number: _
_Nave the Operating Permit requirements been met?
b. Is the required nitrojen BMP in place and -Properly functioning?
Any "no" answer indicates Noncompliance.
❑ Yes ❑ No
❑ Yes ❑ No
Upgrade Requirements (Minn. Stat: § 115.55) An imminent threat to public health and safety (1TPHS) must be upgraded. replaced, or its use
discontinued within ken months ofreceipt of this notice or within a shorter period if required by local ordinance, If the system is failing to protect
ground water, the system must be upgraded, replaced. or its use discontinued within the time required by local ordinance. if an existing system
is not failing as defined in law, and has at least two feet of design soil separation, then the system need not be upgraded, repaired, replaced, or
its use discontinued, notwithstanding any local ordinance that is more strict, This provision does not apply to systems in shoreland areas.
Wellhead Protection Areas, or those used in connection with food, beverage, and lodging establishments as defined in law.
www.pcastate.mn.us 651-296-6300 840-657-3864 TTY 651.282-5332 or 800-657.3864 Availabte in alternative formats
wq-wwists4-31 • 1124112
Page 3of3
Soil Observation Log
,tiun.SepticResourcc.c�arn %La•s E2.4
Owner Information
Property Owner / project: Gordon James Date 7/20/2018
Property Address / PID: 225 Old Crystal Bay Road S.
Soil Survey Information ❑ refer to attached soil survey
Parent matl's: 0 Till ❑ Outwash ❑ Lacustrine ❑ Alluvium ❑ Organic ❑ Bedrock
landscape position: ❑ Summit ❑ Shoulder E Side slope ❑ Toe slope
soil survey map units: L3713 slope Bio direction- Lineal
Soil Log 0 A
[] Boring ❑ Pit Elevation 992.5 Depth to SHWT 58 inches
!pth (in) Texture fragment °% matrix color redox color consistence grade sh
0-28 Fill. .:.;
_F I
28-48
Topsoil
<35
10yr3/1
Friable
Moderate
Block%
48-58
Loarn
<35
10yr4/3
Friable
Strong
431ock}
58-66
Clay Loam
<35
14yr5/4
10y4/8,1-6/l0y
Firm
Strom
; oL:k�
<35
loose
loose
;inane Brain
35-50
friable
weak
er.,nulur bli cka
>50
finn
moderate
priaywatic pian
rigid
strong
nasi, c
Comments:
225 Old Crystal Bay Road S.
Soil Log #2 A
2 Boring pit
Elevation 990.5
Depth to SHWT 22
inches
Depth (in) Texture fragment %
matrix color redox color
consistence
grade
shape
0-14 Topsoil <35
10yr3/l
Friable
Moderate
l3lockN
14-22 Loarn <35
10yr4/3
Friable
Strong
Blocky
22-30 Clay Loarn <35
10yr5/4 10y4/8,1-6/10y
Friable
Strong
BlockN
<35
loose
loose
,ingle gain
35 -50
friable
weak
ranular hl ck�
>50
finn
moderate
prismatic: play
rigid
strong
a
massive
<35
loose
loose
single grain
35 - 50
fi-iable
weak
ormnul- hlork�.
>50
firm
moderate
larisntarie plan
rigid
strong
massive
225 Old Crystal Bay Road S.
Soil Log #3
Boring ❑ Pit
Elevation
Depth to SHWT
Depth (in) Texture fragment %
matrix color redox color
consistence
grade
shape
<35
l
loose
loose
single grain
35-50
friable
weak
eranular hlo&%
>50
firm
moderate
prismatic plan
rigid
strong
massiNC
<35
loose
loose
su,alc grain
35-50
fi•iable
weak
cranutar blocky
>50
firrn
moderate
prismatic plaly
rigid
strong
massive
<35
loose
loose
single gain
35 - 50
friable
weak
Granular blocky
>50
finn
moderate
prismatic plat.
rigid
strong
Iuas icc
<35
loose
loose
single grain
35-50
friable
weak
ganukir black%
>50
firm
moderate
prismatic plat%
rigid
strong
massi�r
<35
loose
loose
,in^Ic urnin
35-50
friable
weak
:rzin ;tr hlocke
>50
firm
moderate
prismatic plat\
rigid I
strong
I massive
I hereby certify this work was completed lir accordance
with MN 7080 and arry local reqs.
Rusty Olson's Soil & Perk
810
esigner Signature
Company
license 4