Loading...
HomeMy WebLinkAboutPoint of Sale Inspection - Compliancy Expires 6/17/2031Task 54112 City Of Orono Date Called in 06/16/21 Date Scheduled 06/17/21 @ 0:00afn Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form Property Address: 1 752 Boulder Drive PID: 13311823110015 Owner Information Name: Dennis Indahl Mailing Address: (if different from Property) Fail Phone: 952-473-2102 Email: I ebindahl@outlook.com, jon@cbrealty.com Ins ector ormation Name:-� -� Company/ OrganizationdD,�4j Fail i . License number: Roof drains and leaders Roof drains should not be connected to the sanitary Phone: I Email: sewer but should discharge to the ground outside of a building. If the roof Inspection System Standard Pass Fail Roof Drains Roof drains and leaders Roof drains should not be connected to the sanitary I Name: sewer but should discharge to the ground outside of a building. If the roof drains are connected to the sanitary sewer, disconnect them, plug any open (, connections to the sanitary sewer using a non -shrink permanent material, and redirect the roof drains onto the ground outside the building. Foundation Foundation drains are underground pipes that collect storm water from Drains around the base of a building and into a sump basket, where it is then pumped outside of the building. Foundation drains should not be connected to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters basements or crawl spaces and pump it away from the house. The basic sump i system includes drain tile, a sump pit, a sump pump, a float or switch, and a drain line. Sump pumps should not be connected to the sanitary sewer. Sewer Service Sanitary Sewer Inflow & Infiltration (I/I) Compliance Inspection Sanitary Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and specifications. Details on back of this sheet Notes: Toilet Removed . o Yes o For Inspection: City Review Inspectors Signature: Date: Owners Signature: I Date: City Review Compliant 1 ❑ Corrective Action Required Certificate of Compliance Expires: .11-'a0211 Corrective Action Due by: Date: to -11- aoat I Signature: I Name: U -kl"d3 19 adid aarnaaS Jo uoiIipuoD iiUaanp aoinaaS Jo aziS puv a j aoinaaS Jo uldoG ojvwixoad d :suoiIipuoD aauUBaAk sllulaQ uoilaodsul autZ aalnJaS :so oN 0 uoil-ealigui— juiof pau2iiBsTW 01-1 wowost,g jo aauaoo gN ui inouraio «b aoj JjvjS 0 :oldw-exg luowwoo fool •�3uistnaj3j DgjJO Xdoo pji�?tp v apnioui jsnw lao as siu L •313 `sjuiof pou�?iiL'siva `sxobao `loon oaal `uoilvaligui �?uipnioui ouil aoinaas uo uaaouoo jo sluiod `s2uilg `suoiloauuoo HE alou asL'ald -kl"d3 19 adid aarnaaS Jo uoiIipuoD iiUaanp aoinaaS Jo aziS puv a j aoinaaS Jo uldoG ojvwixoad d :suoiIipuoD aauUBaAk sllulaQ uoilaodsul autZ aalnJaS