Loading...
HomeMy WebLinkAbout05/25/2021 Septic Compliance ReportMINNESOTA POLLUTION Compliance inspection report form CONTROL AGENCY 520 Lafayette Road North Existing Subsurface Sewage Treatment System (SSTS) St. Paul, MN 55155-4194 Doc Type: Compliance and Enforcement Instructions: Inspection results based on Minnesota Pollution Control Agency (MPGA) requirements and attached supporting doctirnentation — additional local requirements may also apply. Further information can be found here: htti)s://www. oca. state. m n. us/sites/defaulUfil es/wci-wwists4-31 a. odf. Inspector must submit completed form to Local Governmental Unit (LGU) and system owner within 15 days of final determination of compliance or noncompliance. Property information Local tracking number: Parcel IN or Sec/Twp/Range: Local regulatory authority: City of Orono----- Property o_Property address: 330 Big Island, Orono Owner/representative: Rodney Landers - Owner's phone: 651-366-2032 Brief system description: 1000 gal plastic septic tank with a gravity SB2 trench system System status System status on date (mm/dd/yyyy): 5/25/2021 ® Compliant —Certificate of compliance* (Valid for 3 years from report date unless evidence of an imminent threat to public health or safety requiring removal and abatement under section 145A.04, subdivision 8 is discovered or a shorter time frame exists in Local Ordinance.) *Note: Compliance Indicates conformance with Minn. R. 7080.1500 as of system status date above and does not guarantee future performance. ❑ Noncompliant —Notice of noncompliance An imminent threat to public health and safety (ITPHS) must be upgraded, replaced, or its use discontinued within ten months of receipt of this notice or within a shorter period if required by local ordinance or under section 145A.04 subdivision 8. Systems failing to protect ground water must be upgraded, replaced, or use discontinued within the time required by local ordinance. Reason(s) for noncompliance: (check all applicable) ❑ Impact on public health (Compliance component #1) — Imminent threat to public health and safety ❑ Tank integrity (Compliance component #2) — Failing to protect groundwater ❑ Other Compliance Conditions (Compliance component #3) — Imminent threat to public health and safety ❑ Other Compliance Conditions (Compliance component #3) — Failing to protect groundwater ❑ System not abandoned according to Minn. R. 7080.2500 (Compliance component #3) — Failing to protect groundwater ❑ Soil separation (Compliance component #5) — Failing to protect groundwater ❑ Operating permit/monitoring plan requirements (Compliance component #4) — Noncompliant - local ordinance applies Comments or recommendations Installation inspection records talk about 2 - 1000 gallons tanks. We could only locate 1 - 1000 gallon tank Certification I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of future system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate maintenance, or future water usage. By typing my name below, I certify the above statements to be true and correct, to the best of my knowledge, and that this information can be used for the purpose of processing this form. Business name: Sewer_ Se Certification number: C1659 Inspector signature:_ License number: 2502 (T s docu ant has been electronically signed) Phone: 952-873-3292 Necessary or locally required supporting documentation (must be attached) ® Soil observation logs ❑ Other information (list): https://www.I)ca.state.mn.us wq-wwists4-31b • 1/11/21 ® Locally required forms • 651-296-6300 800-657-3864 ® Tank Integrity Assessment ❑ Operating Permit Use your preferred relay service Available in alternative formats Page 1 of 4 1. Impact on public health •- Compliance component #1 of 5 Compliance criteria: Attached supporting documentation: System discharges sewage to the ❑ Yes ® No ❑ Other: _ ground surface Not applicable System discharges sewage to drain ❑ Yes ® No tile or surface waters. System causes sewage backup into ❑ Yes* ® No dwelling or establishment. Any "yes" answer above indicates the system is an imminent threat to public health and safety. Describe verification methods and results: Searched for surface outlet or ground discharge Checked for back-up 2. Tank integrity — Compliance component #2 of 5 Compliance criteria: System consists of a seepage pit, ❑ Yes ®No cesspool, drywell, leaching pit, or other pit? Sewage tank(s) leak below their j❑ Yes ® No designed operating depth? If yes, which sewage tank(s) leaks: Any "yes" answer above indicates the system is failing to protect groundwater. Describe verification methods and results: Pumped & Inspected Attached supporting documentation: ❑ Pumped at time of inspection Name of maintenance business: Sewer Services License number of maintenance business: 2502 Date of maintenance: 5/25/2021 ❑ Existing tank integrity assessment (Attach) Date of maintenance (mmldd/yyyy): (must be within three years) (See form instructions to ensure assessment complies with Minn. R. 7082.0700 subp. 4 8 (1)) ❑ Tank is Noncompliant (pumping not necessary - explain below) ❑ Other: littl)s://www.l)ca.state,mn.us • 651-296-6300 • 800-657-3864 Use your preferred relay service Available in alternative formats wq-wwists4-31b • 1/11/21 Poge 2 of 4 3. Other compliance conditions — Compliance component #3 of 5 3a. Maintenance hole covers appear to be structurally unsound (damaged, cracked, etc.), or unsecured? ❑ Yes, ® No ❑ Unknown 3b. Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety? ❑ Yes' ® No ❑ Unknown 'Yes to 3a or 3b - System is an imminent threat to public health and safety. 3c. System is non -protective of ground water for other conditions as determined by inspector? ❑ Yes- ® No 3d. System not abandoned in accordance with Minn. R. 7080.2500? ❑ Yes- ® No Yes to 3c or 3d - System is failing to protect groundwater. Describe verification methods and results: Inspected Attached supporting documentation: ® Not applicable ❑ 4. Operating permit and nitrogen BMP* — Compliance component #4 of 5 ® Not applicable Is the system operated under an Operating Permit? ❑ Yes ❑ No If "yes", A below is required Is the system required to employ a Nitrogen BMP specified in the system design? ❑ Yes ❑ No If "yes", B below Is required BMP = Best Management Practice(s) specified in the system design If the answer to both questions is "no", this section does not need to be completed. Compliance criteria: a. Have the operating permit requirements been met? ❑ Yes ❑ No b. Is the required nitrogen BMP in place and properly functioning? ❑ Yes ❑ No Any "no" answer indicates noncompliance, Describe verification methods and results: Attached supporting documentation: ❑ Operating permit (Attach) ❑ littps://www.l)ca.state.mn.us 651-296.6300 800-657-3864 Use your preferred relay service Available in alternative formats wq-wwists4-316 • 1/11/21 Page 3 of 4 5. Soil separation — Compliance component #5 of 5 Date of installation 3/1/1999 ❑ Unknown (mmldd/yyyy) ShorelandMelIhead protection/Food beverage lodging? Compliance criteria (select one): 5a. For systems built prior to April 1, 1996, and not located in Shoreland or Wellhead Protection Area or not serving a food, beverage or lodging establishment: Drainfield has at least a two -foot vertical separation distance from periodically saturated soil or bedrock. 5b. Non-performance systems built April 1, 1996, or later or for non-perforrnance systems located in Shoreland or Wellhead Protection Areas or serving a food, beverage, or lodging establishment: Drainfield has a three-foot vertical separation distance from periodically saturated soil or bedrock.* 5c. "Experimental', "Other", or "Performance" systems built under pre -2008 Rules: Type IV or V systems built under 2008 Rules 7080. 2350 or 7080.2400 (Advanced Inspector License required) Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock. ® Yes ❑ No Attached supporting documentation: ® Soil observation logs completed for the report (Attach) ❑ Two previous verifications of required vertical El Yes 171 No, separation (Attach) ❑ Not applicable (No soil treatment area) 171 ® Yes ❑ No' Indicate depths or elevations A. Bottom of distribution media 14" B. Periodically saturated soil/bedrock 52"+ C. System separation 38"+ D. Required compliance separation* 36" *May be reduced up to 15 percent if allowed by Local Ordinance. ❑ Yes ❑ No` *Any "no" answer above indicates the system is failing to protect groundwater. Describe verification methods and results: Boring 1-12" 10yr 2/2 sandy loam 13-48" 10yr 4/4 clay loam 49-52" 10yr 4/4 sand No Redox Upgrade requirements: (Minn. Stat. § 115.55) An imminent threat to public health and safety (ITPNS) must be upgraded, replaced, or its use discontinued within ten months of receipt of this notice or within a shorter period if required bylocal ordinance. If the system is failing to protect ground water, the system must be upgraded, replaced, or its use discontinued within the time required by local ordinance. If an existing system is not failing as defined in law, and has at least two feet of design soil separation, then the system need not be upgraded, repaired, replaced, or its use discontinued, notwithstanding any local ordinance that is more strict. This provision does not apply to systems in shoreland areas, Wellhead Protection Areas, or those used in connection with food, beverage, and lodging establishments as defined in law. iittps://www.pca.state.inn.us • 651-296-6300 • 800.657-3864 • Use your preferred relay service Available in alternative formats wry-LvMsts4-31b • 1/11/21 Page 4 of 4 C2 h / 0 w� m 0 V 1 r U y } G ra -A 2 q. ,I Ero � C Ll H . 0 i 0� a 11 l ? r H F+ W •� H �+ — �7 N � - g o s D.14 c ., v a a ii alp ® 2 I.Z X0.1 C2 h / 0 w� m 0 V 1 r LOGS OF SOIL BORINGS License #810 Location or Project LOT 70 and part of Lot 71 BIG ISLAND Borings made by: Rusty Olson's Soil and Pere. Testing Date: 7/30/96 Classification System: AASHO ; USDA -SCS _X�; Unified Other Auger used (check two): Hand—X—, or Power _, Flight , or Bucket—X_ Depth in feet Boring number 1 Surface elevation 100.9 Depdt in feet Boring number 2 Surface elevation 100.5 0- 0-14" Dark brown Loam 0- 0-12" Dark Brown Loam IOyR 3.2 10yR 3.2 I_ I_ ----------- ------ — ---- —---- -------- _._.—__-..,__________________ 12-32" Brown Loam I OyR 4.4 2- 14-30" Brown Loam 2- lOyR 5.4 ---_-_._M______ 32-48" Brown Sandy Loam 3- 3042" Brown Sandy Loam 3- 10yR 6.4 10yR 6.6 4- 42-60" Rusty Brown Sandy Loam 4_ R-5yR 5.8 IOyR 5.4 48-58" Rusty Brown Loamy Sand G-10yR 6.1 R-5yR 5.8 10yR 7.4 5- — ------- 5- G-10yR 6.1 60-72" Rusty Brown Loamy Sand --------- —._.—___ R-5yR 5.8 10 yR 2.3 58-72" Rusty Brown Sandy Loam 6- G-10yR 6.1 6- R-5yR 5.8 10yR 5.4 G-10 yR 6.1 8- 8 - End of boring at —6— feet. Standing water table: present at _ feet of depth, 24-, hours after boring. Not present in hole `X— Mottled soil: Observed at _3.5_ feet of depth. Not present in hole Comments: End of boring at _6_ feet. Standing water table: present at ^ feet of depth, 24_ hours after boring. Not present in hole _X_. Mottled soil: Observed at _4_ feet of depth. Not present in hole Comments: LOGS OF SOIL BORINGS License #810 Location or Project LOT 70 and part of Lot 71 BIG ISLAND Borings made by: Rusty Olson's Soil and Pere. Testing Date: 7/30/96 Classification System: AASHO ; USDA -SCS _X—; Unified Other Auger used (check two): Hand—X—, or Power —, Flight_, or Bucket—X— Depth in feet Boring number _T3 Surface elevation 106. 9 Depth in feet Boring number 4 Surface elevation 105.9 0- 0-12" Dark Brown Sandy Loam 0- 0-12" Dark Brown Loam IOyR 3.2 10yR 3.2 I- ---------------------••------------------- 1 _ ............................................. 12-24" Brown Sandy Loam 12-24" Brown Sandy Loam IOyR 5.3 IOyR 5.3 2- ---------------------•------- 2- ------...........................------..... 24-32" Brown Loam 24-48" Brown Loam 10yR 4.4 IOyR 5.6 3- --------------------•-------------------- 3- 32-54" Brown Loamy Sand 10yR 5.6 4- 4- ------------------------------------------ 48-60" Brown Loamy Sand ----------------------•------------------- 10yR 6.4 5- 56-72" Rusty Brown Loamy Sand 5- ........................................ R-SyR 5.8 10yR 6.4 60-72" Rusty Brown Loamy Sand G-IOyR 6.1 R-5yR 5.8 IOyR 6.4 6- ----------------------------------------- - 6- G-10 yR 6.1 --------------------------------------------- 7- 7- 8- 8 - End of boring at _6_ feet. Standing water table: present at _ feet of depth, 24_ hours after boring. Not present in hole _X—. Mottled soil: Observed at _4_ feet of depth. Not present in hole Comments: End of boring at _6_ feet. Standing water table: present at _ feet of depth, _24_ hours after boring. Not present in hole _X-. Mottled soil: Observed at 4.5 feet of depth. Not present in hole Comments: FLOW A. Estimated 30n ® gpd measured L_x 1.5- __ gpd SEMCTANK,VOLUME D. 75'6* - gallons SOILS (Site evaluation data) C, Depth to restricting layer ­;W,'2LC =--jS_" feet D. Maximum depth of system C - 3 R _tX!=_22_ feet E. Texture..-55�kmaytPercolation rate • • —I MI'l F. SSFAIX-2 sq ft/gpd G. Slope _19—!/6 TRENCH BOTTOM AREA H. For trenches with 6 inches of rock below the pipe. A x P = — x _._:I — sq ft of bottom area I. For trenches with 12 inches of rock below the pipe: AxFx0.8 =—x—,xO.8 =—sqftof bottom area J. For trenches with 18 inches of rock below the pipe: A x F x 0.66 = — x —_ x 0.66 = — sq ft of bottom area K. For trenches with 24 inches of rock below the pipe: - Ax FxO.6 = _x__x0.6 =—sqftof bottom area BED BOTTOM AREA L. For seepage beds with 6 or 12 inches of rock below the pipe; 1.5xAx F= 1.5x—x—=—sqftof bottom area M. Rock depth below distribution pipe plus 0.5 foot times bottom area; M =Rock depth + 6 Inches x Area (KIJLK) + 0.5 fl) k cu ft ROCK VOLUME IN CU YDS N, Volume in cu ft divided by 27 M + 27 = cu yds — + 27 n cu yds ROCK WEIGHT O. Cubic yards times 1.4 = tons N 1.4 = tons—x 1.4 =—tons SYSTEM LENGTH P. Select trench width = —_ ft Q Divide bottom area by trench width: (H, 1, J, or K) t P lineal feet ® + __ = ® lineal feet Q1. GraveUess Design A x F + (3 for 10" pipe, 2 for 8" pipe, width of the Chamber) 3&6 xjX-+ = J)a feet LAWN AREA R. Select trench spacing, center to center - — feet S. Multiply trench sparing by lineal feet R x Q = sq ft of lawn area —x—=—sqft LAYOUT (we other side) 1. Select an appropriate scale; one square = feet. 2. Show pertinent property boundaries, right-of-way, easements. 3. Show location of house, garage, driveway, and all other improvements, existing or proposed 4. Show location and layout of sewage treatment system. 5. Show location of water supply well. 6. Dimension all set backs and separation distances. M �- i "'" I , 1, 1 , I 19 300225 180 6M MW 30D315 225618 ddo , 6 1500 "1 1 750 450 294 In 900 525 332 1.67 1050 6W 370 w N N M WIN stptic TMk capecitus ((a PH—) Number of I hfinimum Uquidi UquW c4*1y with 2 or Im P" 750 1125 3 or 4 1000 1500 5 or 1500 2250 7,8 or 9 2000 3000 80 C"racUrktits and Requimd Am" 1 WIA01h I WIT""* Palut dm 0.10 CI 0.1 t05 SAW 0.83 0,1(05 Fine Suld 10 1.67 6101S Sudy LOAM - 127 16 to 30 1.67 31 to 45 S= 2W 46 to 60 My" 2" S1"wdm604** MAY • tares Uso PI for rsI pmu" mAh. Soll kavLaj W% at woo d Rao uad ribill ::eon = bo Ivi Puftatuo C(CIAY for lnuIlidw tnaat.a1.yawL 18-36" Vfidth Geotextile Fabric t 2' Rock Cover 0�� ramp-81F&A .j� CITY Or ORONO r; + PTIC SYSTEM APPROVAL '•1 \':;`l�, qty • iA � �` � �� � � �i{{ 55 F1 ��� of ORONO htunklpal onices Post otn« Box 66 r, Crystal Day, hilim ota 55323-0066 Off" LOCATION: 330 Big Island OWNER: John Eiden GENERAL CONTRACTOR: SEPTIC CONTRACTOR: SITE EVALUATOR: Rusty Is Perc. TestingREPORT DATE: July 30, 1996 The City of Orono has Approved your on-site system design as of August 15,. 1996 (approved -disapproved) (date) with the following comments:_ A variance is approved for the septic tank location 10' from the house and the drainfield location 10' to the property line due to a limited lot size. The septic system meets all other State and City Codes. THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is enclosed. NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the Inspector (473-7357). Call for inspections 24 hours in advance. ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain in place until final site grading. Approval to pour footings will not be granted until the Inspections Department has verified that primary and alternate sites are adequately protected. NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' of tested drainfield sites either before or after system construction. Compaction of these areas could render them unusable prohibiting the timely completion and or limiting the long term use of the property. A site copy will be available at the City Offices for the septic contractor. CITY O R O By Stepl'ien eckman, On-site Systems Manager TELEPI [ONE - 473-7357 • FAX - 47MS 10