HomeMy WebLinkAbout03-26-2021 Point of Sale Inspection Applicationi City Of Orono
, oa�% Point of Sale Sanitary Sewer Service Inspection Application
Inflow & Infiltration Com' liance In ction
Before any property is offered for sale/transfer an Inflow and Infiltration (1/1) Inspection must be completed.
The inspection will look for any improper connections or significant defects in the sanitary sewer service pipe.
For properties that pass inspection, the City issues a Certificate of 1/1 Compliance which is valid for 10 years.
Properties that don't pass inspection are issued a correction notice delineating the problems. Repairs should be
completed within 90 days of the first inspection. If repairs cannot be completed prior to the transfer of a
property, proof of an escrow equaling 110% of the estimated cost of repairs shall be provided to the city. If
repairs are not completed a monthly surcharge will be applied to the utility bill until the property is in
compliance. See City website or call (952) 2494600 for more information.
Pro ftfortnation
Property Address: a +� p FVN ea6m. i- R a
PID: Q Q3 a. vo.
Owner Information'
Name:
n c� L Soh �sc
Mailing Address:
(if different from
Property)
�� 14 �t E0.Sav�i- AveYlue- SULA`I
Nt V ecko i k 5 M N 5-5'i/ 9
Phone:
95;� - q 5 (- 535 Email: 1- 01N n S 0 V) C over 60 c a 1
Fees:- Inspection Fee due at time ofapplication
Residential Inspection $250 Commercial Inspection: $750
fa at cLtE hall or Call 952 249-4600 to b hone
Privatejfis 'otion . tion
If you would like to hive a private inspector
instead of allowing a City inspector to
complete the inspection please provide the
following. See private inspection info sheet.
Inspection Company:
Inspectors Name:
phone:
Email:
Signature `
Applicants Name
Applicants Signature
Date
1Rayotai(A E _J_c_16)s oV,
Inspector:
3 ay- a
ry,Ctltvl
°.City; Review
Application Date:
-�a 1 I Fee Paid: Yes 11 No
Inspection Date and Time:
a Z
Inspector:
Compliant:X Yes El No
v'
If not compliant ---
Corrective Action Required:
Corrective Action Due by:
Re -inspection Date & Time:
v
Inspector:
Compliant:0 Yes ❑ No
..Certificate of,5anitary Service Line. Inflow. and Infiltration Compliance
Date:
D3 .q (0) ao
I Certificate of Compliance
Expires: 03 a to 3
Signature:
Name:
ry,Ctltvl