Loading...
HomeMy WebLinkAbout03-26-2021 Point of Sale Inspection Applicationi City Of Orono , oa�% Point of Sale Sanitary Sewer Service Inspection Application Inflow & Infiltration Com' liance In ction Before any property is offered for sale/transfer an Inflow and Infiltration (1/1) Inspection must be completed. The inspection will look for any improper connections or significant defects in the sanitary sewer service pipe. For properties that pass inspection, the City issues a Certificate of 1/1 Compliance which is valid for 10 years. Properties that don't pass inspection are issued a correction notice delineating the problems. Repairs should be completed within 90 days of the first inspection. If repairs cannot be completed prior to the transfer of a property, proof of an escrow equaling 110% of the estimated cost of repairs shall be provided to the city. If repairs are not completed a monthly surcharge will be applied to the utility bill until the property is in compliance. See City website or call (952) 2494600 for more information. Pro ftfortnation Property Address: a +� p FVN ea6m. i- R a PID: Q Q3 a. vo. Owner Information' Name: n c� L Soh �sc Mailing Address: (if different from Property) �� 14 �t E0.Sav�i- AveYlue- SULA`I Nt V ecko i k 5 M N 5-5'i/ 9 Phone: 95;� - q 5 (- 535 Email: 1- 01N n S 0 V) C over 60 c a 1 Fees:- Inspection Fee due at time ofapplication Residential Inspection $250 Commercial Inspection: $750 fa at cLtE hall or Call 952 249-4600 to b hone Privatejfis 'otion . tion If you would like to hive a private inspector instead of allowing a City inspector to complete the inspection please provide the following. See private inspection info sheet. Inspection Company: Inspectors Name: phone: Email: Signature ` Applicants Name Applicants Signature Date 1Rayotai(A E _J_c_16)s oV, Inspector: 3 ay- a ry,Ctltvl °.City; Review Application Date: -�a 1 I Fee Paid: Yes 11 No Inspection Date and Time: a Z Inspector: Compliant:X Yes El No v' If not compliant --- Corrective Action Required: Corrective Action Due by: Re -inspection Date & Time: v Inspector: Compliant:0 Yes ❑ No ..Certificate of,5anitary Service Line. Inflow. and Infiltration Compliance Date: D3 .q (0) ao I Certificate of Compliance Expires: 03 a to 3 Signature: Name: ry,Ctltvl