HomeMy WebLinkAbout05-28-2020 Septic Compliance Cert.Mailing Address Street Address Certificate of Compliance
P.O. Box 66 2750 Kelly Parkway
Crystal Bay, MN 55323 Orono, MN 55356 Inspection Form
y� N Phone: 952-249-4600 Fax: 952-249-4616
���csno�ti website: www.ci.orono.mn.us New Subsurface Sewage
Treatment Systems (SSTS)
Inspection results based on Minnesota Pollution Control Agency (MPCA) requirements
and attached forms System status on date 05/28/2020
Compliant —Certificate of Compliance
Valid for 5 years from report date
Reason(s) for noncompliance (check all applicable)
❑ Noncompliant — Notice of Noncompliance
(See Upgrade Requirements on page 3.)
❑ Impact on Public Health (Compliance Component #1) — Imminent threat to public health and safety
❑ Other Compliance Conditions (Compliance Component #3) — Imminent threat to public health and safety
❑ Tank Integrity (Compliance Component #2) — Failing to protect groundwater
❑ Other Compliance Conditions (Compliance Component #3) — Failing to protect groundwater
❑ Soil Separation (Compliance Component #4) — Failing to protect groundwater
❑ Operating permit/monitoring plan requirements (Compliance Component #5) — Noncompliant
Property Information
Parcel ID# or Sec/Twp/Range:
Property address: 545 Lakeview Parkway Reason for inspection: New instalation
Property owner:
Owner's phone:
or
Owner's representative: Brad Hayes Representative phone: 763-479-1762
Local regulatory authority: City of Orono Regulatory authority phone: 952-249-4600
Brief system description: Comments orrecommendations:
Certification
I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No
determination of future system performance has been nor can be made due to unknown conditions during system construction,
possible abuse of the system, inadequate maintenance, or future water usage.
Inspector name:
Business name:
Inspector signature:
Roger Peitso
Necessary or Locally Required Attachments
® Soil boring logs ® System/As-built drawing
Certification number:
License number:
Phone number:
C6683
952-249-4625
Page 1 of 3
Property address:
545 Lakeview Parkway
1. Impact on Public Health — Compliance component #1 of 5
Inspector initials/Date: RLP 05/28/2020
(mm/dd/yyyy)
Compliance criteria:
Verification method(s):
System discharges sewage to the
❑ Yes ® No
❑ Searched for surface outlet
round surface.
❑ Searched for seeping in yard/backup in home
System discharges sewage to drain
❑ Yes ® No
❑ Excessive ponding in soil system/D-boxes
tile or surface waters.
❑ Homeowner testimony (See Comments/Explanation)
System causes sewage backup into
❑ Yes ® No
❑ "Black soil" above soil dispersal system
dwelling or establishment.
❑ System requires "emergency" pumping
Any "yes" answer above indicates the
❑ Performed dye test
system is an imminent threat to public
❑ Unable to verify (See Comments/Explanation)
health and safety.
❑ Other methods not listed (See Comments/Explanation)
Comments/Explanation:
Installation of new Type I Mound system
2. Tank Integrity — Compliance component #2 of 5
Compliance criteria: Verification method(s):
System consists of a seepage pit, ❑ Yes ® No
cesspool, drywell, or leaching pit.
Seepage pits meeting 7080.2550 may be
compliant if allowed in local ordinance.
Sewage tank(s) leak below their ❑ Yes No
designed operating depth.
If yes, which sewage tank(s) leaks:
Any "yes" answer above indicates the
system is failing to protect groundwater.
Comments/Explanation: Inspected installation of new tanks
❑ Probed tank(s) bottom
❑ Examined construction records
❑ Examined Tank Integrity Form (Attach)
❑ Observed liquid level below operating depth
❑ Examined empty (pumped) tanks(s)
❑ Probed outside tank(s) for "black soil"
❑ Unable to verify (See Comments/Explanation)
❑ Other methods not listed (See Comments/Explanation)
3. Other Compliance Conditions —Compliance component #3 of 5
a. Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound. ❑ Yes* ® No ❑ Unknown
b. Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety. ❑ Yes* ® No ❑ Unknown
*System is an imminent threat to public health and safety.
Explain:
c. System is non -protective of ground water for other conditions as determined by inspector. ❑ Yes* IN No
*System is failing to protect groundwater.
Explain:
Page2of3
Property address: 545 Lakeview Parkway Inspector initials/Date: RLP
4. Soil Separation — Compliance component #4 of 5
Date of installation: 05/28/2020 ❑ Unknown
(mm/ddlyyyy)
Shoreland/Wellhead protection/Food beverage ❑ Yes ❑ No
lodging?
Compliance criteria:
For systems built prior to April 1, 1996, and ❑ Yes M No
not located in Shoreland or Wellhead
Protection Area or not serving a food,
beverage or lodging establishment:
Drainfield has at least a two -foot vertical
separation distance from periodically
saturated soil or bedrock.
Non-performance systems built April 1, ❑ Yes ❑ No
1996, or later or for non-performance
systems located in Shoreland or Wellhead
Protection Areas or serving a food,
beverage, or lodging establishment:
Drainfield has a three-foot vertical
separation distance from periodically
saturated soil or bedrock.*
"Experimental, "Other", or `Performance" ® Yes ❑ No
systems built under pre -2008 Rules, Type IV
or V systems built under 2008 Rules (7080.
2350 or 7080.2400 (Advanced Inspector
License required)
Drainfield meets the designed vertical
separation distance from periodically
saturated soil or bedrock.
Any "no" answer above indicates the system is
failing to protect groundwater.
Verification method(s):
05/28/2020
(mm/ddlyyyy)
Soil observation does not expire. Previous soil
observations by two independent parties are sufficient
unless site conditions have been altered or local
requirements differ.
❑ Conducted soil observation(s) (Attach boring logs)
M Two previous verifications (Attach boring logs)
❑ Not applicable (Holding tank(s), no drainfield)
❑ Unable to verify (See Comments/Explanation)
❑ Other (See Comments/Explanation)
Comments/Explanation:
Benchmark: Survey
Indicate depths or elevations
A. Bottom of distribution media
994.1
B. Periodically saturated soil/bedrock
991.1
C. System separation
31
D. Required compliance separation*
31
5. Operating Permit and Nitrogen BMP* — Compliance component #5 of 5 ❑ Not applicable
Is the system operated under an Operating Permit? ❑ Yes ® No If "yes", A below is required
Is the system required to employ a Nitrogen BMP? ❑ Yes ® No If "yes", B below is required
BMP = Best Management Practice(s) specified in the system design
If the answer to both questions is "no". this section does not need to be completed.
Compliance criteria
a. Operating Permit number:
❑ Yes ❑ No
Have the Ooeratino Permit requirements been met?
b Is the required nitrogen BMP in place and properly functioning? I L Yes LI No
Any "no" answer indicates Noncompliance.
Upgrade Requirements (Minn. Stat. § 115.55) An imminent threat to public health and safety (ITPHS) must be upgraded, replaced, orits use
discontinued within ten months of receipt of this notice. If the system is failing to protect ground water, the system must be upgraded, replaced,
or its use discontinued within three years of receipt of this notice. If an existing system is not failing as defined in law, and has at least two feet
of design soil separation, then the system need not be upgraded, repaired, replaced, or its use discontinued. This provision does not apply to
systems in shoreland areas, Wellhead Protection Areas, or those used in connection with food, beverage, and lodging establishments as
defined in law.
Page 3 of 3
City of Orono Septic Asbuilt Form
yV
��k£sttoak
Address: 545 Lakeview Parkway Building Use: SFD
Installer: Hayes and Sons Excavating License # L640 Date: 12/5/2019
Septic Tanks: 1-2250 Pump Tank: 1-1250 Date Finaled: 05/28/2020 Bedrooms # 5
System Type: ❑X I E] II F-� III ❑X Mound E] Trenches Pressure Bed ❑ Other
Draw detailed diagram with measurements indicating distances to tank Risers. Use two(2) points from a permanent
structure. Show locations of drop Boxes and length of trenches
SEP SITE
Y
i�
1
2
3
4
5
6
7
8
9
10
11
12
Property Owner / project:
Property Address / PID:
Soil Observation Log
Gonya Homes
545 Lakeview Parkway
www.SepticResource.eom vers 12.4
Date 9/10/2019
6/1/2014
Parent matl's: R✓ Till ❑ Outwash ❑ Lacustrine ❑ Alluvium ❑ Organic ❑ Bedrock
landscape position: ❑ Summit E] Shoulder n Side slope ❑ Toe slope
soil survey map units: L40B slope 3-11 % direction- Linear
Soil Log #1
Q Boring ❑ Pit Elevation 992.1 Depth to SHWT 12 inches
Depth (in) Texture fragment % matrix color redox color consistence grade shape
0-6
Topsoil
<35
10yr4/2
Friable
Moderate
Blocky
6-12
Clay Loam
<35
10yr5/4
Friable
Strong
Blocky
12-24
Clay Loam
<35
10yr5/4
IOy4/8,1-6/10y
Firm
Strong
Blocky
<35
loose
loose
single grain
friable
weak
granular blocky
35-50
firm
moderate
prismatic platy
>50
rigid
strong
massive
loose
loose
single grain
<35
friable
weak
granular blocky
35-50
firm
moderate
prismatic platy
>50
rigid
strong
massive
Comments:
545 Lakeview Parkway Soil Log #2
Q Boring ❑ Pit Elevation 992.1 Depth to SHWT 16 inches
Depth (in) Texture fragment % matrix color redox color consistence grade shape
0-8
Topsoil
<35
1Oyr3/2
Friable
Moderate
Blocky
8-16
Clay Loam
<35
1 Oyr4/4
Friable
Strong
Blocky
16-24
Clay Loam
<35
1Oyr5/4
I Oy4/8,1-6/1 Oy
Firm
Strong
Blocky
<35
loose
loose
single grain
friable
weak
granular blocky
35-50
firn
moderate
prismatic platy
>50
rigid
strong
massive
<35
loose
loose
single grain
friable
weak
granular blocky
35-50
firm
moderate
prismatic platy
>50
rigid
strong
massive
545 Lakeview Parkway SoilLog #3
0 Boring ❑ Pit Elevation 992.1 Depth to SHWT 12 inches
Depth (in) Texture fragment % matrix color redox color consistence grade shape
0-6
Topsoil
<35
1Oyr3/1
Friable
Moderate
Blocky
6-12
Clay Loam
<35
1Oyr4/3
Friable
Strong
Blocky
12-24
Clay Loam
<35
1 Oyr5/3
10y4/8,1 -6/10y
Firm
Strong
Blocky
<35
loose
loose
single grain
friable
weak
granular blocky
35-50
firm
moderate
prismatic platy
>50
rigid
Strong
massive
loose
loose
single grain
<35
friable
weak
granular blocky
35-50
firm
moderate
prismatic platy
>50
rigid
strong
massive.
I heZcertithis work was completed ire accordance with MN 7080 and any local reqs.
Rusty Olson's Soil & Perc 810
signer Signature Company License #
545 Lakeview Parkway Soil Log #4
F], Boring ❑ Pit Elevation 989.8 Depth to SHWT 12 inches
Depth (in) Texture fragment % matrix color redox color consistence grade shape
0-8
Topsoil
<35
1Oyr3/1
Friable
Moderate
Blocky
8-12
Clay Loam
<35
1Oyr4/2
Friable
Strong
Blocky
12-20
Clay Loam
<35
1 Oyr5/3
10y4/8,1-6/10y
Firm
Strong
Blocky
<35
loose
loose
single grain
35-50
friable
weak
granular blocky
firm
moderate
prismatic platy
>50
rigid
strong
massive
<35
loose
loose
single grain
35-50
friable
weak
granular blocky
firm
moderate
prismatic platy
>50
rigid
I strong
massive
545 iLakeview
Parkway Soil Log #5
P Boring ❑ Pit Elevation 989.8 Depth to SHWT 12 inches
Depth (in) Texture fragment % matrix color redox color consistence grade shape
0-8
Topsoil
<35
10yr3/1
Friable
Moderate
Blocky
8-12
Clay Loam
<35
1Oyr4/3
Friable
Strong
Blocky
12-18
Clay Loam
<35
1Oyr5/4
IOy4/8,1-6/10y
Firm
Strong
Blocky
<35
loose
loose
single grain
friable
weak
granular blocky
35-50
firm
moderate
prismatic platy
>50
rigid
strong
massive
<35
loose
loose
single grain
'blocky
friable
weak
granular
35-50
firm
moderate
prismatic platy
>50
rigid
strong
massive
1 hereby ce ify this work was completed in accordance with MN 7080 and ally local reqs.
Rusty Olson's Soil & Pere 810
esigner Signature Company License #
Soil Observation Log
www.SepticResotirce.com vers 12.4
Owner Information
Property Owner /project: Gonya Homes Date 9/10/2019
Property Address / PID: 545 Lakeview Parkway 6/1/2014
Soil Survey Information ❑ refer to attached soli survey
Parent matl's: Till ❑ Outwash ❑ Lacustrine ❑ Alluvium ❑ Organic ❑ Bedrock
landscape position: ❑ summit ❑ Shoulder 0 Side slope ❑ Toe slope
soil survey map units: L40B slope 3-11 % direction- Linear
Soil Log #6
Boring ❑ Pit Elevation 989.8 Depth to SHWT 12 inches
Depth (in) Texture fragment % matrix color redox color consistence grade shape
0-8
Topsoil
<35
10yr3/l
Friable
Moderate
Blocky
8-12
Clay Loam
<35
1Oyr4/3
Friable
Strong
Blocky
12-18
Clay Loam
<35
1Oyr5/4
I Oy4/8,1-6/1 Oy
Finn
Strong
Blocky
<35
loose
loose
single grain
friable
weak
granular blocky
35-50
firm
moderate
prismatic platy
>50
rigid
strong
massive
<35
loose
loose
single grain
friable
weak
granular blocky
35-50
firm
moderate
prismatic platy
>50
rigid
strong
massive
Comments: