Loading...
HomeMy WebLinkAboutCompliance Inspection - Expires 3/17/2023Date Called in 4D`VO�� Date Scheduled It ) City Of Orono Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form SFS IPj Property Address: 14156 HIGHWOOD RD PID: 07-117-23-44-0019 Owner Information Name: MUSGJERD, SCOTT & MELISSA Mailing Address: (if different from Property) 4156 HIGHWOOD RD Phone: I Email: Inspector Information Name: SCOTT 0. Company/ Organization CITY OF ORONO License number: Roof drains and leaders Roof drains should not be comiected to the sanitary Phone: Email: sewer but should discharge to the ground outside of a building. If the roof Inspection System Standard Pass Fail Roof Drains Roof drains and leaders Roof drains should not be comiected to the sanitary 1 Name: C sewer but should discharge to the ground outside of a building. If the roof drains are connected to the sanitary sewer, disconnect them, plug any open connections to the sanitary sewer using a non -shrink permanent material, and redirect the roof drains onto the ground outside the building. Foundation Foundation drains are underground pipes that collect storm water from Drains around the base of a building and into a sump basket, where it is then pumped outside of the building. Foundation drains should not be connected to the sanitary sewer. Sump Pumps Sump pumps are designed to capture surface or ground water that enters basements or crawl spaces and pump it away from the house. The basic sump system includes drain tile, a sump pit, a sump pump, a float or switch, and a drain line. Sump pumps should not be connected to the sanitary sewer. Sewer Service Sanitary Sewer Inflow & Infiltration (UI) Compliance Inspection Sanitary Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the main line, shall be in a safe and functional condition and shall be free from all leaks, failures including but not limited to partially collapsed sections or tree root intrusion. The sanitary sewer lines shall meet the City Code standards and specifications. (Details on back of this sheet Notes: Home was connected to sewer on 3/7/2013 and inspected at that time. Property is compliant through 3/17/2023. Inspectors Signature: Date: Owners signature: Date: CityReview Dc Compliant 1 ❑ Corrective Action Required Certificate of Compliance Expires: 03/17/2023 1 Corrective Action Due by: Date: 02/16/2021 Signature: 1 Name: C N Service Line Inspection Details Weather Conditions: Approximate Depth of Service Type and Size of Service Overall Condition of Service Pipe Please note all connections, fittings, points of concern on service line including infiltration, tree root, cracks, misaligned joints, etc. This report must include a digital copy of the televising. Feet Comment Example: 0 Start for 4" cleanout in NE corner of Basement 1-10 Misaligned joint —Infiltration 0 Notes: