Loading...
HomeMy WebLinkAbout12/01/2020 Comp. Inspect. Form - NON COMPLIANTMinnesota Pollution Compliance Inspection Form Control Agency N 520 Lafayette Road North Existing Subsurface Sewage Treatment Systems St. Paul, MN 55155-4194 (SSTS) Doc Type: Compliance and Enforcement Instructions: Inspection results based on Minnesota Pollution Control Agency (MPCA) [For local tracking purposes: requirements and attached forms — additional local requirements may also apply. Submit completed form to Local Unit of Government (LUG) and system owner within 15 days System Status System status on date (mmiddlyyyy): 12/1/2020 ❑ Compliant Certificate of Compliance (Valid for 3 years from report date, unless shorter time frame outlined in Local Ordinance.) Reason(s) for noncompliance (check all applicable) ® Noncompliant — Notice of Noncompliance (See Upgrade Requirements on page 3) ❑ Impact on Public Health (Compliance Component #1) — Imminent threat to public health and safety ❑ Other Compliance Conditions (Compliance Component #3) — Imminent threat to public health and safety ❑ Tank Integrity (Compliance Component #2) — Failing to protect groundwater ❑ Other Compliance Conditions (Compliance Component #3) — Failing to protect groundwater ® Soil Separation (Compliance Component #4) — Failing to protect groundwater ❑ Operating permit/monitoring plan requirements (Compliance Component #5) — Noncompliant Property Information Parcel ID# or Sec/Twp/Range: 3611823310012 Property address: 250 Wakefield Road, Orono, MN Reason for inspection: Property Transfer _ Property owner: Virginia Craven or Owner's phone: Owner's representative: Jon Arne Representative phone: 952-270-8390 _ Local regulatory authority: City of Orono Regulatory authority phone: 952-249-4600 Brief system description: _ Approximately 2-10p0 gallon septic tanks and 750 square feet of trench system. Per City records. Comments or recommendations: TBM: Top of the door threshold. ELV-100.0 assumed Certification I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of future system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate maintenance, or future water usage. Inspector name: Joseph J Olson Business name: _Rusty Olson's Soil & Pere. Testing Inspector signatur Necessary or Locally Required Attachments 2 Soil boring logs M System/As-built drawing ❑ Other information (list): www.pca.state.mn.us • 651-296-6300 800.657-3864 wq-wwists4.39 • 1124192 Certification number: 1255 License number: 810 Phone number: 763-498-8779 ❑ Forms per local ordinance • TTY 651-282-5332 or 800-657-3864 • Available in alternative formats Page Iof3 Property address: 250 Wakefield Road, Orono, MN 1. Impact on Public Health — Compliance component #1 of 5 Compliance criteria: System discharge sewage to the ❑ Yes ® No System discharge sewage to drain the I ❑ Yes ❑ No or surface waters. System cause sewage backup into ❑ Yes ® No dwelling or establishment. Any "yes" answer above indicates the system is an imminent Threat to Public Health and Safety. Comments/Explanation: 2. Tank Integrity —Compliance component #2 of 5 Compliance criteria: System consists of a seepage pit, cesspool, drywell, or leaching pit. Seepage pits meeting 7080.2550 may be compliant if allowed in local ordinance. ❑ Yes ❑ No Sewage tank(s) leak below their []Yes ❑ No designed operating depth. If yes, which sewage tank(s) leaks: Any "yes" answer above indicates the system is Failing to Protect Groundwater. Comments/Explanation: Owner did not want to pump the tanks. Inspector initials/hate: J. O. 12/0112020 Verification method(s): ❑ Searched for surface outlet. ® Searched for seeping in yard/backup in home ❑ Excessive ponding in soil system/D-boxes ❑ Homeowner testimony (See Comments/Explanation) ❑ "Black soil" above soil dispersal system ❑ System requires "emergency" pumping ❑ Performed dye test ❑ Unable to verify (See Comments/Explanation) ❑ Other methods not listed (See Comments/Explanation) Verification method(s): ❑ Probed tank(s) bottom ❑ Examined construction records ❑ Examined Tank Integrity Form (Attach) ❑ Observed liquid level below operating depth ❑ Examined empty (pumped) tanks(s) ❑ Probed outside tank(s) for "black soil" ❑ Unable to verify (See CommentalExplanation) ❑ Other methods not listed (See Comments/Explanation) 3. Other Compliance Conditions — Compliance component #3 of 5 a. Maintenance hole covers are damaged, cracked, unsecured, or appear to structurally unsound. ❑ Yes* ®No ❑ unknown L Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety. ❑ Yes* ®No []Unknown *System is an imminent threat to public health and safety Explain: c. System is non -protective of ground water for other conditions as determined by inspector ❑ Yes* ® No "System is failing to protect groundwater Explain: www.pca.state.mn.us wq-wwists4-31 • 1124112' 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Avaitabie in alternative formats Page 2 of 3 Property address: 250 Wakefield Road, Orono, MN 4. Soil Separation —Compliance component #4 of 5 Date of installation: 11/03/1983 ❑ Unknown ShorelandANel[head protection/Food Beverage ❑ Yes ® No Lodging? Compliance criteria: For systems built prior to April 1, 1996, and ❑ Yes ® No not located in Shoreland or Wellhead Protection Area or not serving a food, beverage or lodging establishment: Drainfield has at least a two -foot vertical separation distance from periodically saturated soil or bedrock. Non-performance systems built April 1, 1 ❑ Yes ❑ No 1996, or later or for non-performance systems located in Shoreland or Wellhead Protection Areas or serving a food, beverage, or lodging establishment: Drainfield has a three-foot vertical separation distance from periodically saturated soil or bedrock.* "Experimental", "Other, or 'Performance" systems built under pre -2008 Rules; Type /V or V systems built under 2008 Rules (7080. 2350 or 7080.2400 (Advanced Inspector License required) Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock. ❑ Yes [--]No Any "no" answer above indicates the system is Failin to Protect Groundwater. Inspector initials/Date: J. O. 12/0112020 Verification method(s): Soil observation does not expire. Previous soil observations by two independent parties are sufficient, unless site conditions have been altered or local requirements differ. ® Conducted soil observation(s) (Attach boring logs) ❑ Two previous verifications (Attach boring logs) ❑ Not applicable (Holding tank(s), no drainfieid) [❑ Unable to verify (See CommentslExplanation) ❑ Other (See CommentslExplanation) CommentslExplanation: Indicate deaths of elevations A. Bottom of distribution media 95.9 B. Periodically saturated soil/bedrock 96.0 C. System separation 0.0 D. Reauired compliance separation* 2.0 *May be reduced up to 15 percent if allowed by Local Ordinance. S. Operating Permit and Nitrogen BMP* — Compliance component #5 of 5 Z Not applicable Is the system operated under an Operating Permit? ❑ Yes ❑ No Is the system required to employ a Nitrogen BMP? ❑ Yes ❑ No BMP=Best Management Practice(s) specified in the system design If "yes", A below is required If "yes", B below is required If the answer to both questions is "no", this section does not need to be completed. Compliance criteria a. Operating Permit number: Have the Operating Permit requirements been met? ❑ Yes ❑ No b. Is the required nitrogen BMP in place and properly functioning? ❑Yes ❑ No Any "no" answer indicates Noncompliance. Upgrade Requirements (Minn. Stat. § 115.55) An imminent threat to public health and safety (ITPHS) must be upgraded, replaced, or its use discontinued within ten months of receipt of this notice or within a shorter period if required by local ordinance. If the system is failing to protect ground water, the system must be upgraded, replaced, or its use discontinued within the time required by local ordinance. If an existing system is not failing as defined in law, and has at least two feet of design soil separation, then the system need not be upgraded, repaired, replaced, or its use discontinued, notwithstanding any local ordinance that is more strict. This provision does not apply to systems in shoreland areas, Wellhead Protection Areas, or those used in connection with food, beverage, and lodging establishments as defined in law. www.pca.state.mn.us 651-246-6300 800-657-3864 TTY 651.282-5332 or 800-657-3864 . Available in alternative formats wq-wwists4-31 • 1124112 Page 3 of 3 Sail Observation Log www.SentieResource.com vert Owner Information Property Owner / project: Virginia Craven Property Address / PID: 250 Wakefield Load Date 12/1/2020 Soil Survey Information ❑ refer to attached soil survey Parent matl's: D Till Ll Outwash ❑ i-acustrine ❑ Alluvium ❑ organic ❑ Bedrock landscape position: ❑ summit ❑ Shoulder 0 Side slope ❑ Toe slope soil survey map units: L70C2 slope % direction - Soil Log #1 D Boring ❑ pit Elevation 99.5 Depth to SHWT 40 Inches Depth (in) Texture fragment % matrix color redox color consistence grade shape 0-10 Topsoil <35 10yr3/1 Friable Moderate Blocky 10-14 Clay Loam <35 1 Oyr4/3 Friable Strong Blocky 14-24 Clay Loam <35 l Oyr5/4 Friable Strong Blocky 24-40 Sandy clay Loam <35 10yr5/4 Friable Moderate Blocky 40-48 Sandy Loam <35 10yr5/4 I Oy4/8,1-6/1 Oy Friable Moderate Granular Comments: 250 Wakefield Road Boring ❑ Pit Elevation Depth to SHWT inches Depth (in) Texture fragment % matrix color redox color consistence grade shape 48-62 Loamy Sand <35 10yr6/2 IOy4/8,1-611Oy Loose Weak Granular 62-72 Loamy Sand <35 10yr611 IOy4/8,1-6/10y Loose Weak Granular <35 loose loose single grain 35-50 friable weak granular blocky >50 firm moderate prismatic platy rigid strong massive <35 loose loose single grain 35-50 friable weak granular blocky >50 firm moderate Prismatic platy rigid strong massive <35 loose loose single grain 35-50 friable weak granular blocky >50 firm moderate Prismatic platy rigid Istrong massive 250 Wakefield Road Soil Log #2 ❑ Boring ❑ Pit Elevation 105.9 Depth to SHWT 72 Inches Depth (in) Texture fragment % matrix color redox color consistence grade shape 0-6 Topsoil <35 10yr3/1 Friable Moderate Granular 6-16 Sandy Loam 5 l Oyr5l4 Friable Moderate t3locky 16-30 Loamy fine Sand <35 10yr5/3 Loose Moderate Granular 30-38 Sandy Loam <35 10yr4/4 Friable Moderate Blocky 38-48 Loamy fine Sand <35 10yr5/3 Loose Moderate Granular I hereby certify this work was completed in accordance with AN 7080 and any local reqs. Rusty +Olson's Soil & Ferc. 810 4f9signer Signature Company License # ;zs3 A)� �4,eld 9�, `t` .s, sk � 3k TSN a 144 j t S E !4t-7 5Ei T �-0 Go oru AT -r to a- C.LV- &-Mom or V6N(A a GJv- g� I 040,04) a° Toja &Dm Ivl e V\J �S�- s a i d �'�►5 se tic, p sl-ern v\ou-1 =n u d ct- loro vt I - Com C o,-‘r\ c ep U 6 n set,-EJ oU,cep . A+ fhts -f-j m /) sysIcry) is no--- oLiri mni nen-- heco,1-4\—1-krte- or hazard 1-I--- i's cu (kio ho -Foy i CurVen+- 1} P o n �" Sc�,I 0 '/-11-e/ homey , if needs