HomeMy WebLinkAbout2012-00463 - escrow fee3 . CITY OF ORONO * 2 0 1 2 — 0 0 4 6 � *
2750 KELL�Y PARKWAY ppT�issuE�: OS/29/2012
ORONO, MN 55356-
952 249-4600 FAX: 952 249-4616
ADDRESS : 3205 GRAHAM HILL RD
PIN : OS-l17-23-14-0065
LEGAL DESC : GRAHAM HILL PRESERVE
: LOT 1 BLOCK 1
PERMIT TYPE : ESCROW FEE-APPL[CANT
PROPERTY TYPG : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-APPL[CANT
NOT E: "I'I-[IS$700.00 ESCROW IS TIED TO ZONING PGRM[T APPL[CATION#12-3�60
APPLICANT
ESCROW FEE-APPLICANT 700.00
KISSNER, MATT&NEENA
505 S l OTH STREET TOTAL 700.00
MINNEAPOLIS, MN 55404-
OWNER
KISSNER, MATT&NEENA
505 S l OTH STREET
MINNEAPOLIS,MN 55404-
AGREEMENT AND SWORN STATEMGNT
The work for���hich this permit is issued shall be performed according to
the�pproved plans and specifications,applicable City approvals,and the
State[3uilding Code. This pennit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governin�this type of�vork
shall be compied with�vhether or not specified herein.This permi[will
expire and become null and void if construction audiorized is not
commenced��ithin 180 days of the date of issuance,or if construc[ion is
suspended for a period of 180 days at any time after work has commenced.
The applicnnt is responsible for assuring all required inspections are
requested in conformance with the State E3uilding Code.This pennit may be
revoked at an��time for due cause.
/ / / /
f\pplicant Permitco Signalw�a Date Issued}3v Sienalure Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
�'"' Permit , _ , ,. , . . . . I��' � UJ
PIN OPEN I51
� 1� � ► ►I ❑ +ir C� ; � �Y-«
...D
Permit#: 2012-00384 - -
Pennit Address: 320� Graham Hilf Rd r" fQ�S..�r� :-
�' -.
�eneral ) Fees Inspections(g} � Notes � Applieant Detail � CO Detail �
Seq Inspection Type Inspector Date Status H Fee Rec
� 1 Radon Preuention Inspection 'LOPti9A 1014f2012 P '0
__ _ __ _ __ _ , ___
�2 Footing VVGIB 8110f2012 ;P ;Y ;0
�3 Foundation Survey B14 Framing �Gl49AT 12f10120i2�P � 10
-- _ __
�4 Poured Wall `V�IGIB ' ,P Y�a __4
8,20f20t2 �
� 5 'Framin - _. V�lG18 10125l2012�P , 0
_ 9 ____
____.. --- � -_ __. _ ;
�6 'Insulation jWGIB 't115,r2Q12 �P 'Y 0
► �0� • _ - , � . � � �
� S Final WGIB 3I21I2013 P Y 0
_ --- ------------- ----__
____
�9 Erosion Control WGIB ;3f2Zf2013 ; ,Y ,0 ;
_._..____ � _.__.._ ._:_ __ _ •-- ---- ------- -_,
►� X
Adc� New Delete