Loading...
HomeMy WebLinkAbout2017-00984 - new structureI NW CORNER OF NW 1/4, NW 1/4 SEC. 31-118-23 WEST LINE OF NW 1/47 NW 1/4 SEC 31-118-23 N 88058'09" E 436.79!__, 9 IJ IN THE NW 1/4 OF SEC. 31-118-23 HENNEPIN COUNTY. MINNESOTA LEGAL DESCRIPTION OF PREMISES SURVEYED: That part of the Northwest Quarter of the Northwest Quarterof Section 31, Township 118 North, Range 23 West of the 5th Principal Meridian described as follows: Beginning at the Northeast corner of said Northwest Quarter of the Northwest Quarter; thence West along the North line of said Northwest Quarter of the Northwest Quarter to a point 949 feet East from the Northwest corner of said Northwest Quarter of the Northwest Quarter; thence deflecting left 58 degrees 43 minutes to the centerline of Watertown Road; thence Southeasterly along said centerline to the East line of said Northwest Quarter of the Northwest Quarter; thence3 North along said East line to the point of beginning, except road. This survey shows the boundaries of the above described property, topography and wetland location from a survey by others, and the proposed location of a proposed house and garage. It does not purport to show any other improvements or encroachments. Iron marker found Iron marker set 17-253 CENTERLINE OF H C S A H NO. 6, PLAT 5 PER DOC. NO. PROPOSED HOUSE DETAIL 1 "=30' PROPOSED ELEVATIONS (VERIFY) TOP OF FOUNDATION = 985.3 GARAGE = 985.0 BASEMENT FLOOR = 976.6 SPORT COURT = 971.3 LOOKOUT = 979.8 SE CORNER OF NW 1/41 NW 1/4 SEC. 31-118-23 C) - Z M M M zz Lo LI) 19 Cn -jZ Uj a �aW o J V W J Q ®®�'L �Wo J QinW �- o� z C.7 J Cl) W w ® U) m 0 J � \� Z z . z \� J z o ._� > V v .d. LU o L W o4�`,�mN�U- U)= °� W --- W Irl O O O CL.— W. C 0,J) COZ RyU� i U W ._ U) 01 O ,.• O T N a)E co ; �WM� (D vj zY �W W 1 4wo WakfkwK 0 21J6j QK4--, N W kw----, 1 Is 5 Christine Mattson From: Christine Mattson Sent: Tuesday, October 17, 2017 11:10 AM To: 'James Lura' Cc: Roger Peitso; Monica Fadness; Nola Dickhausen Subject: RE:4660 Watertown Rd foundation as-built/#2017-00984 Good Morning James, We have received and approved the electronic copy of the foundation as-built survey. You may proceed with framing. A copy of this email authorizing you to proceed should be kept on site with the inspection card. Please provide us with a full-size, hardcopy at your earliest convenience. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway ( Orono MN 155356(physical address) PO Box 66 Crystal Bay I MN 155323-0066 (mailing address) St 952.249.4620 I g 952.249.4616 1>-4 cmattson@ci.orono.mn.us www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: November 10,2017 From:James Lura [mailto:jlura@pillarhomes.com] Sent:Tuesday, October 17, 2017 10:57 AM To: Christine Mattson<CMattson@ci.orono.mn.us> Subject: FW:Watertown Rd foundation as-built Christine I left you a voicemail as well. I just want to make sure we are ok to proceed. I can bring hardcopies if you need them later today or tomorrow. Let me know if there is anything else (need to do. Thank you James From: Mark [mailto:markg@gronbergassoc.com] Sent: Tuesday, October 17, 2017 8:17 AM To: James Lura; 'Pillar Homes' Subject: Watertown Rd foundation as-built FOUNDATION AS -BUILT SURVEY FOR PILLAR HOMES � N THE NW 114 OF SEC. 31-118-23 1 r HENNEPIN COUNTY, MINNESOTA / 60 120 SCALE IN FEET , 240 CO lb f =O � � e 05*e \ Z�7 \ 7� 02\� '670 3 CENTERLINE OF H C S A H NO. 6, PLAT 5 PER DOC. NO. (s85.s 778 N PQ CEN ^o 17.8 H +n 77.7 PCR EN (98p p P PO CH 5.5 ROpOSET® '>z (986-6) 1�14660OUSE IV (985.6) i (985.S) 0 7o.s 8.0 22.5 CD (9855) .S'T0OP ts.2 0 �gg561 (985.6) ao 0 EXISTING FOUNDATION zo DETAIL s 1 "-30' s I DESIGNED IREVIS DRAWN (CHECKED 16) ;s (4 / EX BLDG E BLD Q n� N 8905256" W 362.18 1 STOOPON U/V L)A NE CORNER qF NW 1/4 NW 1/4 EC. 1-118-23 41 J4 EAST LINE OF N 1/4,_ NW 1/4 SEC. 31-1181,23 201.1 i s HIGHWXY EASEMENT PER DOC. VO. 6830057 \ 62��77 \\ 468 S6 \\ 4 \\\ LEGAL DESCRIPTION OF PREMISES SURVEYED: 203&6 50 That part of the Northwest Quarter of the Northwest Quarterof Section 31, Township 118 North, Range 23 West of the 5th Principal Meridian described as follows: Beginning at the Northeast corner of said Northwest Quarter of the Northwest Quarter; thence West along the North line of said Northwest Quarter of the Northwest Quarter to a point 949 feet East from the Northwest corner of said Northwest Quarter of the Northwest Quarter; thence deflecting left 58 degrees 43 minutes to the centerline of Watertown Road; thence Southeasterly along said centerline to the East line of said Northwest Quarter of the Northwest Quarter; thence3 North along said East line to the point of beginning, except road. This survey shows the boundaries of the above described property, the location of an existing foundation. It does not purport to show any other improvements or encroachments. • : Iron marker found o : Iron marker set (985.6) Existing foundation elevation DATE DESCRIPTION GRONBERG & ASSOCIATES, INC CONSULTING ENGINEERS, LAND SURVEYOR; SITE PLANNERS 445 N. WILLOW DR. LONG LAKE, MN. 55356 952-473-4141 T :.751 RECEIVED CITY OF ORONO I hereby certify that this plan, specification, or report SCALE was prepared by my or under my direct supervision 11t=60' and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. DATE 10-16-17 JOB NO. rC 10,'Qe{C'ar' AAnl 1 n hARFR 1_77S5' 17-253 iwo Wdt(Jw ad 2-011 - C)(:)qZq_