Loading...
HomeMy WebLinkAbout2014-00297 - stairway to lake CITY OF ORONO j 2 0 1 4 — 0 0 2 9 7 * 2750 KELLEY PARKWAY DATE ISSUED: 06/13/2014 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 1330 CHERRY PL PIN : 08-117-23-32-0026 LEGAL DESC : SAGA HILL REVISED : LOT 000 BLOCK 011 PERMIT TYPE : ZONING PERMIT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : STAIRWAY TO LAKE NOTE: STAIRWAY TO LAKE WITHIN 75'ZONE PATIO OUTSIDE 75/ZONE MAJOR LAND ALTERATION *NEED TO HAVE FINAL ON GRADING AND STAIRS INITIAL * PRIOR TO RE EASE OF ESCROW FUNDS AN AS-BUILT SURVEY AND HARDCOVER CALCULATIONS,MUST BE SUBMITTED AND APPROVED APPLICANT STAIRWAY TO LAKE 50.00 CLAIRSON DUTRA ENGINEERING REVIEW COSTS 5780 LINCOLN DR TOTAL 50.00 #103 Payment(s) EDINA, MN 55436 CHECK 4097 50.00 (952)220-5902 OWNER SHI&LIN YAN,AMY YONGLI 1330 CHERRY PL MOUND, MN 55372- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. Applicant Permitee Signature DateIssued By h: ature Date co 1 , p- 50 — A o al City of Orono Zoning Permit Application(-- / „,., Mailing Address: ::::: QZ©/ 7Q� el 7O6 /�—7 Q Crystal Bay,MN 55323 0066 Escrow#and / Street Address: amount. �. 2750 Kelley Parkway Permit Fee: 1. L� Orono, MN 55356 lg kE S H DW� Approved by: Fax 952-249-4616 Notes: Main: 952-249-4600 www.ci.orono.mn.us This application form must be completed in full and all required information must be submitted. (Please print.) Job Site Address: 1330 Cherry PI,Orono, MN 55347 CONTRACTOR I APPLICANT INFORMATION: Name: :A ( QSOi QA Phone: c32 Zeo b,104. Fax: Address: (�J Q (0 3 City: MJF (JUi4- ZIP: 5-5 • ?(a Contact Person: 2{ a (J'724 Contact's phone ,-r o _ V •Z ID Email 1n364J1C0L_Q4%)6E,GMkt&Applicant is: Con ractor omeowner (circle one) c.-0M PROPERTY OWNER INFORMATION: Name: Lin Yan and Amy Shi Phone(day): 651-428-0889 Mailing Address: 1330 Cherry PI,Orono,MN 55364 ZIP: 55364 Email and/or Fax Iyan@uswestfinancial.com,952-400-6889 Overall Project Description: AL_ G44 ptn) 6 t- eaxaSc 0 . erv-ra„oc.0 l,J 5,7-0-4-t_ CheckBox TYPE OF PERMIT COST* Dock, Residential—Permanent dock on any lake or initial seasonal dock not on $50+engineering review costs Lake Minnetonka(permanent dock requires CUP) Dock,Commercial $50+engineering review costs Escrow for erosion control and engineering review costs $2,000 Hardcover Permit: Driveway, Patio, Sidewalk, Etc. (New or Replacement) No charge Also required is a Minor or Major Land Alteration Permit Land Alteration, Major(grading, filling, or excavating) more 500 cubic yards or $50 more than 10 cubic yards in lakeshore setback (also requires CUP) 1 Escrow for erosion control and engineering review costs As determined by CUP Land Alteration, Minor(grading, filling or excavating)—500 or less cubic yards $50+engineering review costs outside of lakeshore setback or less than 10 yards in lakeshore setback Escrow for erosion control and engineering review costs $2,000 Retaining Wall measuring under four feet require a zoning permit. $50+engineering review costs Retaining walls measuring more than four feet(from bottom of footings to top of wall) require a building permit. (Tiered retaining walls are considered one wall unless the walls are separated by twice the height of the lower wall.) Escrow for erosion control and engineering review costs $2,500 ___x_. Stairway to Lake(New or Replacement) $50+engineering review costs Escrow for erosion control and engineering review costs $2,000 Structure Permit for other structures not requiring a building permit but $50+engineering review costs regulated by the zoning code (including, but not limited to accessory building of less than 120 square feet, detached deck or platform and sport court) Escrow for erosion control and engineering review costs ; $2,500 Tree Removal or other vegetation removal in 0 to 75 foot zone No charge. Temporary Construction Office/Trailer(associated with building permit) $30 (over) *Permit fee will be collected when the permit is issued. Updated. November 30,2012 • APPLICANT/OWNER ACKNOWLEDGEMENT: • Applicant/Owner agrees to provide all information required or requested by the Planning Department; • Owner agrees to pay the City of Orono for engineering consultant review costs where applicable; • Applicant/Owner certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so,the staff has no alternative but to reject it until it is complete; • Applicant acknowledges the attached Escrow Agreement is completed and signed by Owner; • Applicant/Owner understands their project may require an initial and as-built survey per City Code Section 86-68. • Some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. The undersigned certify that the information supplied is true and correct to the best of their knowledge. Applicant's Signature: Date: 04 /ol /2a/4 Property Owner's Signature: Date. 'T /I/Zc/L TYPE OF PERMIT: SUBMISSION REQUIREMENTS: Except for tree removal permits, all permits require a completed application form, escrow agreement(signed by the property owner) and escrow check from owner, two copies of all plans, and three copies of all grading plans or surveys/site plans Dock, Residential Seasonal Dock—survey showing proposed dock Permanent Dock—plans as approved by CUP and copy of LMCD permit(if applicable) Dock,Commercial 1. Structural plans for the dock 2. Survey showing the proposed location of the dock 3. Copy of LMCD permit Hardcover Permit 1. All Minor or Major Land Alteration Permit requirements apply as appropriate 2. Hardcover calculations, existing and proposed 3. Plans Land Alteration,Major 1. Plans as approved by Conditional Use Permit 2. Erosion control plan or copy of MCWD Erosion Control Permit Land Alteration,Minor 1. Survey/grading plan including existing and proposed contours (Less than 10 cu.yds.within 75'of 2. Amount of fill to be imported and/or exported and haul route lake or less than 501 cu.yds 3. Amount of earth to be moved around on site elsewhere.) 4. Erosion control plan or copy of MCWD Erosion Control Permit Retaining Wall 1. Plans for wall(s) 2. Unless repair or exact replacement of existing wall, submit an updated survey with grading plan including existing and proposed contours 3. Hardcover calculation worksheets if in shoreland district _ 4. Erosion control plan or copy of MCWD Erosion Control Permit Stairway to Lake 1. Construction plans for stairway, including footings 2. Topographical survey of property with proposed stairs shown 3. Erosion control plan or copy of MCWD Erosion Control Permit Structure Permit 1. Construction plans. 2. Survey of property with proposed structure shown and with setbacks to property lines, other structures on property and the septic system indicated.The general location of any sewer and water services should be shown if applicable. 3. Grading plan if grading is proposed. 4. Hardcover calculation worksheets 5. Erosion control plan or copy of MCWD Erosion Control Permit Tree Removal Call: 952-249-4600 to schedule a single tree removal inspection. A re-planting plan/ management plan required for clear cutting, buckthom or other intensive vegetation removal. Updated: November 30,2012 PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS Address/Permit Number: / 330 C/=1 ER 2 AA C,c% i rNQl fv I.G.I& 631i n 15' Zone. Description of work: GIZV\401 N (--• ?alit. 6u}-sick. •15' Z•6ne. Septic review by: `� Pr- ' / Date Approved: Zoning review by: ii l r,!' _ hi Date Approved: 5. L7't f Building review by: ``,,, Date Approved: t5 /2- / Grading review by: Pei Date Approved: ? X/ Zoning District:_ Zoning File#: I"5 -5w23 Reso#: Reso Date: Zoning: Lot Area: SF/AC Width: Lot Coverage: SF _% Survey Submitted: 5Yfes D No Date of Survey: 10 ri -1 3 Revised date(?): Proposed Setbacks: �� - O � I V r - Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) Perimeter(linear feet) = 50% = #of Stories Ok? D YES FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: The distance between the lowest FOR A BUILDING ON A SLAB FOUNDATION: START WITH proposed floor(of the basement or crawl space)and the highest point of the roof. START WITH The distance between the top of slab and If you have a... the highest point of the roof. If you have a... • GABLE OR HIPPED ROOF(no • GABLE OR HIPPED ROOF(no windows): Subtract half the windows): Subtrac he distance distance between t ighest point between the h' st point of the roof of the roof to ow point of the to the low int of the corresponding SUBTRACTION correspo ng gable or hipped roof SUBTRACTION gabl hipped roof (BASED ON ROOFG -CE OR HIPPED ROOF(with (BASED ON • G LE OR HIPPED ROOF(with TYPE) endows): Subtract half the ROOF TYPE) /!windows): Subtract half the distance distance between the top of the / between the top of the highest highest window and the highest window and the highest point of the point of the roof /// roof • ALL OTHER ROOF TYPES(flat, mansard,etc):No subtraction. • ALL OTHER ROOF TYPES(flat, mansard,etc):No subtraction. Al 1JlTION Add the distance between the top of slab SUET CTION Subtract the distance between the BASED ON and the highest existing grade adjacent to (B ED ON EXISTING basement/crawl space floor and the EXISTING the foundation. RADES) highest existing grade adjacent to the GRADES) foundation OR 10 feet(whichever is less). EQUALS Defined building height EQUALS Defined building height Shoreland District 1 MCWD Permit Received Average Lakeshore Setback Met? Bluff 0 Yes 0 No 0 N/A 0 Yes A:r-No AK'es 0 No / D Yes 0 No ,RIVN/A Permit Number:Awl i Setback: Stormwater Quality Existing Proposed Variance Required CUP Required Overlay District Tier Hardcover Hardcover /415711p ig(�P�c Yes 0 No ,Er-Yes 0 No 44215-�. CJ?�� �T Type(s): Type(s). Updated: January 2013 v:\forms\plan review checklist 2013.docx REMARKS (in-house): Fees to be Charged YES NO Permit Plan Review State Surcharge Investigation Fee SAC—Number of SAC Units Other(specify) Square Footage $per Square Footage Basement X = $ 1St Floor X = $ 2nd Floor X = $ Garage X = $ Estimated Construction Value: $ Orono Inspections Required Work Requiring Separate Permits Required State Permits ❑ Site ❑ Plumbing ❑ Grading/ Filling ❑ Well ❑ Hardcover Removal 0 Mechanical 0 Fire 0 Electrical ❑ Footing 0 Septic 0 Water Connection O Poured Wall 0 Fireplace 0 Sewer Connection ❑ Foundation Survey 0 Masonry 0 Lawn Irrigation O Radon Rock Bed 0 Mfg. ❑ Framing 0 Other(specify) O Insulation As-Built Survey i"�, Final 9 r e ci-stair i t O Wetland Buff ❑ Other(specify) REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access: Existing: 0 YES 0 NO New: 0 YES 0 NO OFFICIAL REMARKS -TO JBE NOTED O PERMIT AND INITIALLED & I(;Ur it ytku of csua�/ ands col a -bw f t Swim 4- Kale CialUAltk h(A& V t&U l0 - a Orh iHCd Witt OWJV'cd• Updated: January 2013 v:\forms\plan review checklist 2013.docx • City of Orono izLoyv0„ Hardcover Calculation WorkshOlI0NO COPY i\ f Property Address: 1330 Cherru Place, Mound, MN • Prepared by: bavid Crook Date: 10/7/ 2013 Stormwater Quality Overlay District Tier: (Circle one) CP Tier 2 Tier 3 Tier 4 Tier 5 Step 2: PROPOSED HARDCOVER In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Key to Hardcover Item(Describe) Length x Width Total Survey (Square Feet) (Example) (Garage) (24'x 3(Y) (720 S.F.) A Nouse Irregular 1,972,14 S.F. B Garage 34.20' x 2330' 796.86 S.F. C . rivsvwai(To be removed) 44+061R4*- 1,061.2 S.F. D Portico Irregular 85.32 S.F. E Corc c 'walk-(To be removed) 19.66 S.F. F Clap vvay Iakr-(To be removed) 6 c�lay 19.20 S.F. G 5tAAyeftl Iahc (To be removed ) II-rot-03r 16.80 S.F. H itan vv.M4o be removed) Irroqular 16.80 S.F. I `.tai;,vaH L lake (To be removed) Irroqular 7.29 S.F. J (To be removed) 1,00' x 36.00' ?'6.00 S.F. K Concrete natio(floor) 932' x 11.40' 106.25 S.F. L Screen porch 12,00' x 11.40' 136.80 S.F. M Peck stairs 4.5'x 6.8' + 5.5'x13,8' 106.50 S.F. N Plastic air conditioner pad 2,83' x 2.83' 8,01 S.F. Q Plastic air conditioner pad 2.83' x 2.83' 8.01 S.F. P Pock Irrecplar 12.25 S.F. Q Concrete sidewalk 830' x .00' 24.90 S.F. R Detaining wall within 75' of lake 1.00' x 9.00' 9,00 S.F. S Concrete slab(deck) 4,50' x 4,50' 20,25 S.F. T New Privewaq (To be added) Irregular 1,709.73 S.F. U New Detaining wall not within 75' of lake (To be added) 1.00' x 96.00' 56.00 S.F. ✓ New Concrete floor (To be added) Irregular 8190 S.F. W New Paver sidewalk (To be added) 4.00' K10,00' 40,00 S.F. X New Paver Patio (To be added ) Irregular 471,90 S.F. Y New 5taiwa l to lake (To be added) Irregular 200.22 S.F. Z S.F. (1) Total Proposed Hardcover J 5,846,04 S.F. Excludable Hardcover(See City Code Sec 78-1684): J .. • - . ;,; To be removed) I.00' x 36,00' 47,00 S.F. U New Detaining wall not within 75' of'lake (To be added) 1.00' x 56.00' 56.00 S.F. S.F. S.F. S.F. (2) Total Excludable Hardcover 56.00 S.F. (3) Net Proposed Hardcover [Subtract line (2)from line (1)] 5,790.04 S.F. (4) Total Lot Area 30,378.00 S.F. Proposed Hardcover Percentage [(3)+(4)] 19.06 % RECE LV D January 8,2013 MAY 2 0 2014 CITY OF ORONO . . , V 1 if*iff ?t 1 *.4 4 * - c...?• , ,,..',,, City of Orono oo� Hardcover Calculation Worksheet Property Address: 1330 Chem{ place, Mound, MN ki,Uo % Prepared by: bavid Crook Date: 10/7/ 2013 Stormwater Quality Overlay District Tier: (Circle one) co Tier 2 Tier 3 Tier 4 Tier 5 Step 1: EXISTING HARDCOVER In the following table identify all items of existing hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Key to Hardcover Item (Describe) Length x Width Total Survey (Square Feet) (Example) (Garage) (24'x 30') (720 S.F.) A House Irrecgalar 1.972,14 S.F. B Garage 34.20' x 23,30' 796.86 S.F. C Privewag Irrecfular 1,061,25 S.F. D Portico Irregular 8532 S.F. E Concrete walk Irregular 19,66 S.F. F 5tairwaq to lake Irregular 19,20 S.F. G 5tairwaq to lake Irregular 16,80 S.F. H 5tairwaq to lake Irregular 16.80 S.F. Stairwaq to lake Irregular 7.29 S.F. Detaining wall not within 75' of lake 1.00' x 36.00' 36.00 S.F. K Concrete patio(floor) 932' x 11.40' 106,25 S.F. L Screen porch 12,00' x 11.40' 136.80 S.F. M fleck stairs 4,5'x 6.8' + 5.5'x 13.8' 106.50 S.F. N Plastic air conditioner pad 2.83' x 2,83' 8.01 S.F. O Plastic air conditioner pad 2.83' K 2,83' 8,01 S.F. p Pock Irregular 12.25 S.F. Q Concrete sidewalk 830' x 3.00 24.90 S.F. R Detaining wall within 75' of lake 1.00' x 9.00' 9.00 S.F. S Concrete slab(deck) 4,50' x 4.50' 20.25 S.F. T S.F. U S.F. ✓ S.F. W S.F. X S.F. Y S.F. Z S.F. (1) Total Existing Hardcover 4,46329 S.F. Excludable Hardcover(See City Code Sec 78-1684): J Detaining wall not within 75' of lake 1.00' x 36.00' 36.00 S.F. S.F. S.F. S.F. S.F. (2) Total Excludable Hardcover 36,00 S.F. (3) Net Existing Hardcover [Subtract line (2)from line (1)] 4,427.29 S.F. (4) Total Lot Area 30, 78.00 S.F. Existing Hardcover Percentage [(3)_(4)) 14,57 % (PropOSed EUxt page) January 8,2013 MAY 2 U 2014 CITY OF ORONO • • • Christine Mattson From: Christine Mattson Sent: Tuesday, May 20, 2014 2:33 PM To: 'ingauge.eng@gmail.com'; 'clairsondutra@gmail.com' Cc: Melanie Curtis; 'lyan@uswestfinancial.com' Subject: RE: 1330 Cherry Place/#214-00297 Clairson, Lin Yan contacted me today asking for status of his permit application. I see we have received the signed escrow agreement, but have not received copies of approved sheets 2 and 3 or the MCWD permit. Please refer to my original email below. Don't hesitate to contact me if you have any questions or concerns. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway 1 Orono MN 55356(physical address) PO Box 66 I Crystal Bay MN 55323-0066 (mailing address) it 952.249.4620 8 952.249.4616 ® cmattson@ci.orono.mn.us ; � www.ci.orono.mn.us Summer Office Hours: (Monday, May 19 through Friday,August 29,2014) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, May 26, 2014 From: Christine Mattson Sent: Friday, May 09, 2014 4:29 PM To: 'ingauge.eng@gmail.com'; 'clairsondutra@gmail.com'; 'Iyan@uswestfinancial.com' Cc: Melanie Curtis Subject: 1330 Cherry Place/ #214-00297 Clairson, While reviewing the plans submitted for the zoning permit#2014-00297 we noted sheets 2 and 3 are dated 10/7/2013. The approved copies of sheets 2 and 3 with the resolution for the Conditional Use Permit are dated 10/11/2013. Please submit two copies of sheets 2 and 3 with the correct date and proposed and existing hardcover calculations. Also, attached is an updated escrow agreement. No additional escrow money is needed at this time. Please have the property owner sign and return. Finally, your project may trigger the Minnehaha Creek Watershed District's (MCWD) permitting requirements; please contact the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will not issue a building permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. The above information is required in order for the plan review to continue. Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the above requirements. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono MN !, 55356(physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing address) 'iii' 952.249.4620 8 952.249.4616 Ilcmattson@ci.orono.mn.us ' www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm PLEASE NOTE: Summer Office Hours start Monday, May 19,2014 Monday-Thursday: 7:30 am to 5 pm/Friday 7:30 to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, May 26, 2014 (Memorial Day) 2 Christine Mattson From: Christine Mattson Sent: Friday, May 09, 2014 4:29 PM To: 'ingauge.eng@gmail.com'; 'clairsondutra@gmail.com'; 'lyan@uswestfinancial.com' Cc: Melanie Curtis Subject: 1330 Cherry Place/#214-00297 Attachments: Escrow Agreement-Zoning Permit w Erosion Control 2014-00297 2013-00809 13-3623.pdf Clairson, While reviewing the plans submitted for the zoning permit#2014-00297 we noted sheets 2 and 3 are dated 10/7/2013. The approved copies of sheets 2 and 3 with the resolution for the Conditional Use Permit are dated 10/11/2013. Please submit two copies of sheets 2 and 3 with the correct date and proposed and existing hardcover calculations. Also, attached is an updated escrow agreement. No additional escrow money is needed at this time. Please have the property owner sign and return. Finally, your project may trigger the Minnehaha Creek Watershed District's (MCWD) permitting requirements; please contact the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will not issue a building permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not trigger any of their permitting requirements. The above information is required in order for the plan review to continue. Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the above requirements. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono MN 55356 (physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing address) lit 952.249.4620 g 952.249.4616 ® cmattson@ci.orono.mn.us www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm PLEASE NOTE: Summer Office Hours start Monday, May 19,2014 Monday-Thursday: 7:30 am to 5 pm/Friday 7:30 to 11:30 am OUR OFFICE WILL BE CLOSED: Monday, May 26, 2014 (Memorial Day) 1