HomeMy WebLinkAboutGrade Final DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. COMPLETED ' = .7 t /
ADDRESS Z
OWNER L TELEPHONE NO.
CONTRACTOR __ ' cvcwc:c.4,(_0
j
DESCRIPTION sl1A r�i t✓ t' ti A i✓
Uj ❑ FOOTING ❑ PLUMBING FINAL ElEXCAV/GRADING/FILLING
Q El POURED WALL ❑ MECHANICAL RI ElLAKESHORE/WETLANDS
� ❑ FRAMING ❑ MECHANICAL FINAL
❑ TREE REMOVAL
O
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ El DEMO-FINAL ❑ SEPTIC INSTALL El HARD COVER REMOVAL
J ElPLUMBING RI ElSEPTIC FINAL ElFOUNDATION/REMOVAL
OWNER/CONTRACTOR TO MEET YOU:_YES NO
COMMENTS:
O
O
r V/'.- y zcc
.✓ ' cam (
O
LLJ
CC
Z
W
z
W
j
O
W I 1 WORK SATISFACTORY:PROCEED Ci PROJECT COMPLETE
ccW
CORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY
O CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
U BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. J PHOTO TAKEN
INSPECTOR WILL RETURN
7 CITATION ISSUED
Fl STOP ORDER POSTED.CALL INSPECTOR
INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor n7--_
Inspector.
White Copy/Inspector's File Canary Copy/Site Notice
SCHIMNOWSKI ENGINEERS
CRITERIUM-SCHIMNOWSKI ENGINEERS
161 DUNBAR WAY
MAHTOMEDI,MN 55115
TEL 651779-7700
FAX 651779-7114
www.criterium-schimnowski.com
November 4, 2013
Lincoln Danforth
Yardscapes, Inc.
8609 Harriet Ave. So.
Bloomington, MN 55420
RE: Limestone Block Retaining Wall Evaluation
3205 Graham Hill Road
Orono, Minnesota
Project No. 13-1067
Dear Mr. Danforth:
This letter is being sent per your request regarding the recently constructed limestone block retaining
walls at 3205 Graham Hill Road in Orono, Minnesota. This evaluation is based on observations I made
during a site visit on November 4, 2013, construction progress photos provided by you on October 29,
2013, and verbal statements made to me by you regarding construction means and methods.
The construction of the retaining walls, including the tiered walls, appears to be structurally stable and in
general conformance with boulder/stone retaining wall and construction industry standards. The walls
were constructed with boulders of sufficient size and setback. Other typical construction details such as
use of drainage elements and filter fabric also appeared to be followed correctly. As is normal for boulder
retaining walls of this type, some wall movement and soil settlement should be expected.
I recommend that gutters and downspouts be installed on the house in order to direct the roof runoff away
from the retaining walls. Surface water should also be directed away from the walls.
This evaluation was performed using the design guidelines presented in the third edition of the"Design
Manual for Segmental Retaining Walls" (DMSRW)published by NCMA in 2009. If soil conditions,
proposed layouts, or other design parameters vary from that assumed a revised analysis might be needed.
Please call me if you have any questions or need more information. Thank you.
Sincerely,
Paul Schimnowski, PE