Loading...
HomeMy WebLinkAboutGrade Final DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED PERMIT NO. COMPLETED ' = .7 t / ADDRESS Z OWNER L TELEPHONE NO. CONTRACTOR __ ' cvcwc:c.4,(_0 j DESCRIPTION sl1A r�i t✓ t' ti A i✓ Uj ❑ FOOTING ❑ PLUMBING FINAL ElEXCAV/GRADING/FILLING Q El POURED WALL ❑ MECHANICAL RI ElLAKESHORE/WETLANDS � ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL O Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ El DEMO-FINAL ❑ SEPTIC INSTALL El HARD COVER REMOVAL J ElPLUMBING RI ElSEPTIC FINAL ElFOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES NO COMMENTS: O O r V/'.- y zcc .✓ ' cam ( O LLJ CC Z W z W j O W I 1 WORK SATISFACTORY:PROCEED Ci PROJECT COMPLETE ccW CORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY O CORRECT WORK,CALL FOR REINSPECTION TEMPORARY U BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. J PHOTO TAKEN INSPECTOR WILL RETURN 7 CITATION ISSUED Fl STOP ORDER POSTED.CALL INSPECTOR INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor n7--_ Inspector. White Copy/Inspector's File Canary Copy/Site Notice SCHIMNOWSKI ENGINEERS CRITERIUM-SCHIMNOWSKI ENGINEERS 161 DUNBAR WAY MAHTOMEDI,MN 55115 TEL 651779-7700 FAX 651779-7114 www.criterium-schimnowski.com November 4, 2013 Lincoln Danforth Yardscapes, Inc. 8609 Harriet Ave. So. Bloomington, MN 55420 RE: Limestone Block Retaining Wall Evaluation 3205 Graham Hill Road Orono, Minnesota Project No. 13-1067 Dear Mr. Danforth: This letter is being sent per your request regarding the recently constructed limestone block retaining walls at 3205 Graham Hill Road in Orono, Minnesota. This evaluation is based on observations I made during a site visit on November 4, 2013, construction progress photos provided by you on October 29, 2013, and verbal statements made to me by you regarding construction means and methods. The construction of the retaining walls, including the tiered walls, appears to be structurally stable and in general conformance with boulder/stone retaining wall and construction industry standards. The walls were constructed with boulders of sufficient size and setback. Other typical construction details such as use of drainage elements and filter fabric also appeared to be followed correctly. As is normal for boulder retaining walls of this type, some wall movement and soil settlement should be expected. I recommend that gutters and downspouts be installed on the house in order to direct the roof runoff away from the retaining walls. Surface water should also be directed away from the walls. This evaluation was performed using the design guidelines presented in the third edition of the"Design Manual for Segmental Retaining Walls" (DMSRW)published by NCMA in 2009. If soil conditions, proposed layouts, or other design parameters vary from that assumed a revised analysis might be needed. Please call me if you have any questions or need more information. Thank you. Sincerely, Paul Schimnowski, PE LICENSED PROFESSIONAL ENGINEERS HOME&BUILDING INSPECTIONS STRUCTURAL EVALUATIONS ASSOCIATION RESERVE/TRANSITION STUDIES RESIDENTIAL/COMMERCIAL RETAINING WALL DESIGN&EVALUATIONS