To: Ron Olson
From: Mike Gaffron
Date: July 13, 2006
Subject: Revis Stepheneson, 1850 Fox Ridge Road - $5,000 Money Order Security
Inspector Willie Gibbs has made a site inspection and confirmed the plantings as required
are in place and thriving. Therefore, you may return the $5,000 escrow check to the
Stephenson's.
City of Orono
Meffililo
To: Mike Gaffron
From: Willie Gibbs
Date: June 6, 2006
Re: tree planting at 1850 Fox Ridge
Mike, I inspected the property at 1850 Fox Ridge to verify the tree planting schedule as you
had requested. The plan that had been submitted was very specific as to the types and
spacing of the trees. I did verify that over 40 new trees have been planted but not necessarily
as per planned type and spacing. There were more trees planted closer to the house than
indicated on the plan. The sloped area of the yard has very thick vegetation and no signs of
erosion. It appears that the owner met the intention of the plan and all plantings appear to be
healthy.
1
P � .
d
� sass
I � First National Bank of the lakes 78 sy
706 Second Ave.S. MinneapolisO 4 3
,MN 55402 �.
REMITTER 3100 Hennepin Ave. Minneapolis,MN 55408 1
2445 Shadywood Road Navarre MN 55392
REViS Stephenson z�'� 6613 Penn Ave.S. Richfield,MN55432 75-1448/910
DATE Dec 27, 2001
PAY TO THE City of Orono �y
ORDER OF
5,000.00.
DOLLARS E
gh s document has a multi-color background a�miero-print signature Cine,and a frolographic foil title;absence of these features wiffindicate a copy. i
1
BANK MONEY o"R.""ER j i
'R� ,.
11010437a"I 1:09 10 0448 71: 075 4040 Sur
CITY of ORONO
RESOLUTION OF THE CITY COUNCIL
S8�
��� NO, � � � f
`4kE
3. Each of the 14 trees remaining to be planted shall have a minimum trunk caliper of 2
inches as measured 12" above the ground level. The remaining 14 trees to be planted shall
be located such that the average separation between trees is in the range of approximately 15-
20' more-or-less, dependent on species types and the recommendation of City consultants.
4. Applicant shall have the composition of fill soils analyzed and provide soil amendments as
necessary to insure survivability of all trees planted.
5. Because the City is not requiring applicant to
back d1CUP
applicant shall confirm that the 4 inches of topsoil equired under the November 2001
has been placed, and in the event it has not, applicant shall place said topsoil as required.
ht to
ect
for the
rst three years
6. The City of Orono shallreserve
enstue the sugcessful establishhmen oproperty
all vegetatioin and to ensure
following this approval
erosion is not occurring on the hillside.
7. Applicant in accepting and signing this approval resolution agrees to the following terms:
(a) Applicant hereby grants the City right of entry and the right to perform the landscape
work in accordance with the approved plan if applicant fails to perform the work
within 60 days of issuance of the permit;
(b) Applicant agrees to replace any of the 35 trees in the approved plan that does not
survive one year after planting;
(c) Applicant agrees to replace any trees that die within three years of planting if more
than 10% of the trees planted die during that three-year period.
(d) Applicant hereby grants the City right of entry for the purpose of monitoring the
survival of trees,to monitor the establishment of all vegetation and ensure erosion is
not occurring on the hillside; and for the purpose of replacing trees should the
applicant fail to act per the above conditions.
8. Applicant shall provide security in the amount of$5,000 in the form of a letter of credit or E
some other form suitable to the City to guarantee that the conditions of this approval ar
carried out and to provide funding to allow the City to complete the work if the applican
fails to perforni. The security shall remain in effect for 3 years commencing with the dat
this resolution is signed by the applicant. _13 _a M3 3_t 3`�8
Page 6 of 8