Loading...
HomeMy WebLinkAbout2012-01024 - land alteration CITY OF ORONO * 2 0 1 2 - 0 1 0 2 4 2750 KELLEY PARKWAY DATE ISSUED: 02/20/2013 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 REPRINTED ON 2/20/2013 ADDRESS 3035 CASCO POINT RD PIN 20-117-23-34-0001 LEGAL DESC REG. LAND SURVEY NO. 0394 LOT 000 BLOCK 000 PERMIT TYPE ZONING PERMIT PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE LAND ALTERATION (0-500 CU YDS) NOTE: DRIVEWAY, LAND ALTERATION AND RETAINING WALL $2.000 S/B COLLECTED IN ESCROW FEE ACTUAL ESCROW FEE AMOUNT COLLECTED $2,000 HOW DID THEY PAY? CHECK#5476 PAID BY HOMEOWNER ESCROW PERMIT 42013-00120 ESCROW FEE FOR: EROSION CONTROL&ENGINEERING REVIEW COS'T'S OTHER INSPECTION REQUIRED: PVC PIPES-ENGINEER *AS-BUILT SURVEY REQUIRED PRIOR TO RELEASE OF ESCROW.14",A (INITIAL) * CITY ENGINEER COMMENTS AND REDLINED PLANS NOTED. (INITIAL) * AS BUILT SURVEY REQUIRED PRIOR TO RELEASE OF ESCROW. (INITIAL) APPLICANT MINOR LAND ALTERATION 50.00 W LANDSCAPES INC. ENGINEERING REVIEW COSTS P.O. BOX 352 LORETTO, MN 55357- TOTAL 50.00 OWNER HULBERT,JAY 3035 CASCO POINT RD WAYZATA, MN 55391- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in c nfonnance with the StateJ3uilding Code.This permit may be revokedayan time for due . / 2 U / l p App _�nt Permitee Signature Date Issued ignature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. City of Orono Zoning Permit Application Mailing Address: Permit number: O JI PO Box 66 Date received: V Crystal Bay, MN 55323-0066 0 � 0 Escrow#and Street Address: amount: ti 2750 Kelley Parkway Permit Fee: ev p� Orono, MN 55356 t9kE3H�¢� Approved by: Fax: 952-249-4616 Notes: Main: 952-249-4600 www.ci.orono.mn.us This application form must be completed in full and all required information must be submitted. (Please print.) r Job Site Address: �D f'.S �, O �0 /,/L-/ 12 NCO Nme RACTOR/A�P�� AINMFATI L Phone: ? - —c C, Fax: Address: 19� �e -2SZ. City: &)ILS ZIP: - Contact Person: Contact's phone number Email aV *Z I.L} i j l2JC % „ Xpplicant is: Contractor Homeowner (Circle One) C;wagt1c( ,�Lk) taf,zkeapej . ne.f PROPERTY OWNER INFORMATION: Name-. J< �J Cl(- &22 13 e—Fe Phone (day): Mailing Address: j03 l-Aj Ccs ZIP: Email and/or Fax Overall Project Description: Check TYPE OF PERMIT Box COST* Dock, Residential — Permanent dock on any lake or initial seasonal dock not on $50 + engineering review costs Lake Minnetonka (permanent dock requires CUP Dock, Commercial $50+ engineering review costs Escrow for erosion control and engineering review costs $2,000 jc Driveway Permit (New or Replacement) No charge Also re uired is a Minor or Major Land Alteration Permit Land Alteration, Major(grading, filling, or excavating) more 500 cubic yards or $50 more than 10 cubic yards in lakeshore setback (also requires CUP) Escrow for erosion control and engineering review costs As determined by CUP Land Alteration, Minor(grading, filling or excavating) —500 or less cubic yards $50+ engineering review costs j outside of lakeshore setback or less than 10 yards in lakeshore setback Escrow for erosion control and engineering review costs $2,000 Retaining Wall measuring under four feet require a zoning permit. $50+ engineering review costs Retaining walls measuring more than four feet (from bottom of footings to top of wall) require a building permit. (Tiered retaining walls are considered one wall unless the walls are separated by twice the height of the lower wall.) Escrow for erosion control and engineering review costs $2,500 Stairway to Lake (New or Replacement) $50+ engineering review costs Escrow for erosion control and engineering review costs $2,000 Structure Permit for other structures not requiring a building permit but $50+ engineering review costs regulated by the zoning code (including, but not limited to accessory building of less than 120 square feet, detached deck or platform and sport court) Escrow for erosion control and engineering review costs $2,500 Tree Removal or other vegetation removal in 0 to 75 foot zone No charge. (over) *Permit fee will be collected at the time the permit is issued. Updated: April 23, 2012 Ar'r'LIUAN I/UVVNt:K At.r%NUVVLCUtitIVIr_N 1: • Applicwnt'.Owner agrees to provide all information required or requested by the Planning Department; • Owner agrees to pay the City of Orono for engineering consultant review costs where applicable; • Applicant/Owner certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete, • Applicant acknowledges the attached Escrow Agreement is completed and signed by Owner; • Applicant/Owner understands their project may require an initial and as-built survey per City Code Section 86-68. • Some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information, the application may not be issued. The undersigned certify that the informations pplie is true and correct to the best of their knowledge. Applicant's Signature: Date: Property Owner's Signature: Date: Zz SUB I ION REQUIREMENTS: Except for tree removal permits, I permits TYPE OF PERMIT: re e a completed application form, escrow agreement (signed by the property owner) and escrow check from owner, two copies of all plans, and three copies of all grading plans or surveys/site plans Dock, Residential Seasonal Dock—survey showing proposed dock Permanent Dock- plans as approved by CUP and copy of LMCD permit Dock, Commercial 1. Structural plans for the dock 2. Survey showing the proposed location of the dock 3. Copy of LMCD permit Driveway Permit 1. All Minor or Major Land Alteration Permit requirements 2. Hardcover calculations, existing and proposed 3. Driveway plans Land Alteration, Major 1. Plans as approved by Conditional Use Permit 2. Erosion control plan or copy of MCWD Erosion Control Permit Land Alteration, Minor 1. Grading plan including existing and proposed contours (Less than 10 cu.yds. within 75' of 2. Amount of fill to be imported and/or exported and haul route lake or less than 501 cu.yds 3. Amount of earth to be moved around on site elsewhere.) 4. Erosion control plan or copy of MCWD Erosion Control Permit Retaining Wall 1. Plans for wall(s) 2. Unless repair or exact replacement of existing wall, submit an updated survey with grading plan including existing and proposed contours 3. Hardcover calculation worksheets if in shoreland district 4. Erosion control plan or copy of MCWD Erosion Control Permit Stairway to Lake 1. Construction plans for stairway, including footings 2. Topographical survey of property with proposed stairs shown 3. Erosion control plan or copy of MCWD Erosion Control Permit Structure Permit 1. Plans for structure. 2. Survey of property with proposed structure shown and with setbacks to property lines, other structures on property and the septic system indicated. The general location of any sewer and water services should be shown if applicable. 3. Grading plan if grading is required 4. Hardcover calculation worksheets if in shoreland district 5. Erosion control plan or copy of MCWD Erosion Control Permit Tree Removal Call: 952-249-4600 to schedule a single tree removal inspection. A re-planting plan/ management plan required for clear cutting, buckthorn or other intensive vegetation removal. Updated: April 23. 2012 Plan Review Checklist for Zoning Permit Applications Address: Description of work: Type of permit: Zoning review by: Date Approved: ? Grading review by: Date Approved: / i Other Review, Reviewed by: Date Approved:- Zoning: pproved:Zonin : Zoning File#: Resolution #: Resolution Date: Lot Area: SF/AC Width: Depth: Survey Submitted? Yes 0 No Date of Survey: pec1 - 2-2- 13 Existing Setbacks: Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side Proposed Setbacks: Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side Shoreland District MCWD Permit Received Average Lakeshore Setback Met? Bluff 0 Yes 0 No 0 N/A 0 Yes No Yes 0 No 0 Yes 0 No HiQ/A Permit Number: i Setback: Hardcover Zones Existing Proposed Variance Required CUP Re uired 0-75' 0 Yes o 0 Yes No 75-250' Type(s): Type(s): 250-500' Zoning File#: Zoning File#: 500-1000' Resolution#: Resolution#: Created: March 29,2011 z:\forms\plan review checklist for zoning permit applications.docx Planning Review Checklist for Zoning Permit Applications Page 2 of2 Cubic Yards In Out Total Haul Route? ? 0 Yes 0 No Explain haul route in detail: Fees to be Charged Amount Orono Inspections Required Permit Amount 0 Site Escrow Amount 0 Hardcover Removal 0 Footing Signed escrow received? Poured Wall A -Built Survey 0 Yes 0 No 0 Planting Plan 0 Wetland Escrow amount received? 0 Final " 0 Yes 0 No Other(specify) J C Engineering review needed? 0 Yes 0 No REMARKS (in-house): Other Review: Reviewed by: Date Approved: MARKS(TO BE NOTED ON PERMIT AND INITIALLED BY PERSON PULLING PERMIT) MAI C) Created: March 29,2011 z:\forms\plan review checklist for zoning permit applications.docx Christine Mattson From: Christine Mattson Sent: Wednesday, January 23, 2013 3:59 PM To: jhulbert@twincitiesautomotive.com Cc: 'Chris Wagner'; Melanie Curtis Subject: 3035 Casco Point Road / Permit#2012-01204 Attachments: Escrow Agreement-Zoning Permit w Erosion Control 2012-01024.pdf Jay, The zoning permit application for a minor land alteration is almost ready to be issued. One item is outstanding: an escrow and signed agreement. Please sign the attached escrow agreement and return it with a check for $2,000. Once this is received we can issue the permit. Please don't hesitate to contact me if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356 (physical address) PO Box 66 Crystal Bay MN 55323-0066 (moiling address) 2 952.249.4620 8 952.249.4616 E cmattson@ci.orono.mn.us -t www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Monday,January 21,2013 1 �°moo CITY OF ORONO Street Address: Mailing Address: I Telephone(952)249-4600 y G~ 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616 ESH0� Fj F, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us '9K October 30, 2012 Chris Wagner W Landscapes, Inc. PO Box 357 Loretto, MN 55357-0352 RE: Zoning Permit Application #2012-01024 3035 Casco Point Road We received a zoning permit application for a minor land alteration and driveway relocation at the above referenced address. This application is incomplete. Please submit 2 copies of a revised certificate of survey meeting the enclosed survey standards which should also include your proposed grading plan in order for our review to continue. The existing and proposed hardcover and the amount of cut/fill should be calculated by the surveyor as well. We were recently contacted by the property owner at 3025 Casco Point Road, Scott Standa, regarding potential modifications to his driveway. In light of the work proposed on or near the common lot line and relating to the common driveway staff feels it would be more efficient and appropriate to coordinate the review of both of the applications. However, the Standas have not submitted an application and I do not know if an application is forthcoming. Once the revised survey, earthwork calculations and hardcover calculations are submitted we will proceed with our zoning and engineering department review of the application. If you have any questions, please don't hesitate to contact me at 952.249.4620 or cmattson@ci.orono.mn.us. Sincerely, CITY OF ORONO aUiV1VLniP- Christine Mattson Planning Assistant c Jay Hulbert; 3035 Casco Point Road; Wayzata, MN 55391 Chris Wagner via email at cwagner(a wiandscapes.net Enclosure Christine Mattson From: Christine Mattson Sent: Tuesday, October 30, 2012 2:44 PM To: 'cwagner@wlandscapes.net' Subject: 3035 Casco Point Road /Zoning Permit#2012-01024 Attachments: admin@ci.orono.mn.us_20121030_143700.pdf; Survey Requirements.pdf Chris, Attached is a copy of a letter being mailed today. Please let me know if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356 (physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing address) 9 952.249.4620 �� 952.249.4616 cmattson@ci.orono.mn.us -T-� www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Monday, November 12, 2012 1 Jesse Struve From: Jesse Struve Sent: Wednesday, November 28, 2012 9:05 AM To: Melanie Curtis Cc: Christine Mattson Subject: 20121128 3035 Casco Pt Rd -2012-01024 Melanie, I have reviewed the submitted survey for the removal of existing bituminous and the installation of a berm and have the following comments: • The proposed berm will impact the natural drainage of the land but the application does show a 4" pipe to allow for water to drain through. I have concerns a 4" pipe may not be sufficient to handle the required flow of a 100 yr event or when this pipe is frozen in the spring, if there was enough thought given to where the water will go. The installation of a berm cannot adversely impact the neighboring property. • A registered engineer needs to evaluate whether a 4" pipe can sufficiently handle the resulting runoff from a 100yr event and determine if by installing a berm and the pipe is frozen, whether there will be any impact to the neighboring property. • What are the top and bottom elevations for the proposed retaining wall? Without a registered engineer reviewing and signing off that the proposed berm will not result in impacts to the neighboring property, I will not approve it. It would be my recommendation to grade this area to allow for the water to pass through it did prior to the removal of the existing bituminous. This area can still be planted as long as the plantings do not raise the grade which results in the blockage of the existing drainage pattern. Jesse Struve, PE Director of Public Works/City Engineer City of Orono (952) 249-4661 - Direct (952) 249-4616 - Fax www.ci.orono.mn.us i vicLcry engineering & Consulting, LLC 44-1 1 V1111.i,e��ooc.s Drive,r--d""f'ranie•MN 55 3'i'-1-i,- 052-1 o5-8272 p.,?52_1o5-3272 2-42e-1?71 ivic�:rnl �eiche n�c;nE�.c ont December 4, 2012 RECEIVED Project VEC 12-101 DEC 21 2012 Mr. Chris Wagner CITY OF ORONO ORONO COPY W Landscapes PO Box 352 Loretto,MN 5535 Dear Mr. Wagner: Re: Drainage Evaluation &Recommendations, Hulbert Residence, Orono, MN As you requested, Vickery Engineering&Consulting, LLC (VEC) has performed an evaluation of the proposed drainage through the proposed berm being constructed at 3035 Casco Point Road in Orono, Minnesota. You indicated the City of Orono had requested the proposed berm and modified drainage paths be evaluated to determine if it is viable or will cause drainage issues with the neighboring property. Background Information A proposed berm is to be constructed between the driveways of 3025 and 3035 Casco Point Road in Orono,Minnesota. A boulder wall is also going to be constructed on the 3035 side of the berm Drainage through the berm is proposed by placing a 4-inch solid PVC pipe from the "upstream" side to the "downstream" side of the berm. You provided two surveys of the properties that showed the existing conditions on one and the proposed conditions (new wall and berm) on the other one. The elevation difference between the two sides of the berm is approximately 1 foot in 9 lineal feet, or 11 percent,based on the contours shown. Conclusions and Recommendations Based on the contributing area of the driveway adjacent to the berm area, the size of the proposed pipes, and the proposed elevation difference from one side of the berm to another, it is recommended that a minimum of three of the 4-inch PVC pipes be placed in the berm to allow drainage. Approximate suggested locations are shown on the attached sketch. It is recommended that draintile covers be placed over the ends of the pipes to reduce the potential for animals creating nests in the pipes or other items clogging the pipes. In addition, the ends of the pipe should be periodically maintained to ensure they are cleared of leaves and other debris. This maintenance should be performed on an as-needed basis. ,CnSineering,jolutions Foran(Instable world Jesse Struve From: Jesse Struve Sent: Wednesday, January 02, 2013 3:53 PMS:, ,, To: Melanie Curtis; Christine Mattson Subject: 20130102 3035 Casco Pt Rd -2012-01024 Melanie, I have reviewed the application for the driveway alteration and planting and will approve the permit. The applicant should be aware that while the pipes are designed to handle the amount of water from a 100 yr event, they also need to be maintained to ensure the pipes free of debris, snow, and ice to allow the pipes to maintain the drainage. Jesse Struve, PE Director of Public Works/City Engineer City of Orono (952) 249-4661 - Direct (952) 249-4616 - Fax www.ci.orono.mn.us ........... D A3 -92 SQ rt. ly ilk Q fl-rl '54 A tz Z*N V I I DE CITY OF ORONO Planning & Zoning Department Memo To: Finance Department From: Christine Mattson, Planning Assistant CC: Street File Date: July 2, 2013 G/L: 101-22205 fir/ Re: Zoning Permit Escrow Refund Zoning Permit #2012-01024 pertaining to 3035 Casco Point Road is complete. The Applicant, Jay Hulbert, has requested a refund of his$2,000 escrow. The project was inspected in-house by Jesse Struve. The following is attached: • Escrow Refund Request • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received Mail to: Jay Hulbert 3035 Casco Point Road Wayzata, MN 55391 wAstreet files\casco pt rd\3035\escrow refund memo 2012-012024.doc Christine Mattson From: Christine Mattson Sent: Wednesday, June 26, 2013 4:26 PM To: 'Jay Hulbert' Cc: Melanie Curtis Subject: RE: inspection 3035 Casco Pt- Hulbert Jay, City Engineer,Jesse Struve,visited your property and approved the as-built survey submitted. Regarding you escrow refund request... all expenditures, including escrow refunds, require City Council approval. I will have your request ready for the next council meeting,which is Monday,July 8th. Checks will be mailed out that week. If you have any additional questions, please don't hesitate to contact us. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN ': 55356 (physical address) PO Box 66 Crystal Bay MN ?, 55323-0066 (mailing address) 9 952.249.4620 8 952.249.4616 cmattson@ci.orono.mn.us ' -[� www.ci.orono.mn.us Summer Office Hours: (Monday, May 20 through Friday,August 30,2013) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Thursday,July 4,2013 From: Jay Hulbert [ma iIto:]Hulbert@twincitiesautomotive.com] Sent: Monday, June 24, 2013 10:00 AM To: Christine Mattson Cc: Melanie Curtis Subject: RE: inspection 3035 Casco Pt- Hulbert Christine, My wife dropped off the as- built drawings Friday,from our Landscaping project at 3035 Casco Pt. As we have now completed the project, can you please advise what the next steps are to close the project out and return the associated escrow funds. In the event a site inspection is required would you please forward the date and time as I would like to have the GC and Landscaping company available to review and answer any outstanding issues. Thank you, 1 Jay r Y,afu.0 Jay Hulbert TWIN CITIES President/C00 -- ® ,AUTOMOTIVE SERVICE I INTEGRITY I COMMUNITY 15802 Wayzata Boulevard Minnetonka, MN 55391 Direct: 952-303-7547 Fax: 952-303-7430 jhulbert(a)twincitiesautomotive.com From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Thursday, May 16, 2013 2:52 PM To: Jay Hulbert Cc: 'cwagner@superiordesignlandscapes.com'; Jesse Struve; Christine Mattson Subject: RE: inspection 3035 Casco Pt- Hulbert Jay Thanks for the update. It is noted on your permit that you must submit an as-built survey showing conformance with the approved permit plans for final approval. Upon receipt of the as-built survey our engineer will perform a site inspection. If the City is satisfied the approved plan was followed and all erosion control concerns (if any) are addressed we will begin to process your escrow for refund. Thanks Melanie Melanie Curtis 9 952.249.4627 E mcurtis(@ci.orono.mn.us From: Jay Hulbert [mailto:JHulbert(atwincitiesautomotive.com] Sent: Wednesday, May 15, 2013 5:17 PM To: Melanie Curtis Cc: 'cwagner@superiordesigniandscapes.com' Subject: inspection 3035 Casco Pt- Hulbert Melanie, We have completed the landscaping project at my house and am requesting an inspection. I'm assuming the process is an inspection prior to closing out the permit and remittance of the deposit. Can you let me know who to call and what the timeline or process is. Thanks again Jay 2 JayHulbert AUTO CITIES President/COO AUTOMOTIVE SERVICE ( INTEGRITV I COMMUNITY 15802 Wayzata Boulevard Minnetonka, MN 55391 Direct: 952-303-7547 Fax: 952-303-7430 jhulbert(�twincitiesautomotive.com 3 ZONING PERMIT ESCROW AGREEMENT Permit#2012-01024 AGREEMENT made this cW day of PC bV'LCR.r , 20j_�), by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") and Jay Hulbert("Ow ers"). Recitals 1. A zoning permit application has been filed for the property located at 3035 Casco Point Road the ("Subject Property"), legally described as all of Tract A, Registered Land Survey No. 394, Hennepin County Minnesota, except that part lying Northerly of the following described line: Beginning at the Southeasterly corner of Tract B in said Registered Land Survey; thence Southwesterly along a line drawn through a point on the Base line shown on said Registered Land Survey 80 feet Northwesterly from its intersection with the Southeasterly line of said Tract A to the shore of Lake Minnetonka and there terminating. 2. Owner requests the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit$2,000 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a zoning permit application. The escrow will also guarantee reimbursement to the City for all out-of- pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with permit#2012-01024 if compliance with the approved zoning permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject. y pursuant to Minn. Stat. §§415.01 and 366.012. CITY: CITY"9t9AqN0 OW R: r— ? f By: Its: tarp is s fW.j ' CITY OF ORONO * 2013 - 00120 * 2750 KELLEY PARKWAY DATE ISSUED: 02/20/2013 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 3035 CASCO POINT RD PIN : 20-117-23-34-0001 LEGAL DESC REG. LAND SURVEY NO. 0394 LOT 000 BLOCK 000 PERMIT TYPE : ESCROW FEE-APPLICANT PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ESCROW FEE-APPLICANT NOTE: THIS$2,000 ESCROW IS TIED TO ZONING PERMIT 2012-01024 APPLICANT ESCROW FEE-APPLICANT 2,000.00 HULBERT,JAY ESCROW FEE- DEVELOPER 0.00 3035 CASCO POINT RD WAYZATA,MN 55391- TOTAL 2,000.00 OWNER HULBERT,JAY 3035 CASCO POINT RD WAYZATA,MN 55391- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. Applicant Permitee Signature Date Issued By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. !k Perrnifflw s .. Fife Transaction Maintain Reports Geobae Property Recordo 17 permit PH IN dr y f� Permit#: 2012-01024 Permit Address: 13035 Case Paint Rd F_Er.iir,s nal Ph1 ACICIres General Fees Inspections.(21 Mes Applicant Detail CO Detail f Seq Inspection Type Inspector Date Status H Fee Rec 2 Other t I I �y; j I 4t I A II 4 Add New Delete q..,r'. 1 DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED PERMIT NO. 2-01 Z-O IO�nZ , COMPLETED -110-13 ADDRESS 305 WCO T� Pd OWNER TELEPHONE NO. CONTRACTOR DESCRIPTION ❑ FOOTING ❑ PLUMBING FINAL 11 ❑ EXC V/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP T ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES NO o COMMENTS: cc W cc Z) O a cc UL O � I W vV CC Q Z W z W j d W ❑WORK SATISFACTORY:PROCEED I PROJECTCOMPLETE 41 W El WORK&PROCEED F ISSUE CERTIFICATE OF OCCUPANCY O ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ; PHOTO TAKEN INSPECTOR WILL RETURN Ll STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (J52) 249-4600 Owner/Contractor on site: Inspector. White Copy/Inspector's File Canary Copy/Site Notice C IOZ/9Z/90 7,19 -� - r.."- t`" '1 Y ( �.. a :.i•. _ ��� ,,._ "'�`� • M I&A _ If -74 �y yr9�.�� ,y• �£�. .,,-" � .rte '- � cIOZ/9Z/90 ( 77 FM 2� xv i a- • ,.�,Y• �. adz• ��} sV y saw.. ���- • �.,b�. /i�,fT •+C.Y ' �ri 14 x-'S. ,T.. t :Jt r Fa E-LbnnZ/qQ r ; Xyll Al If IM- 14 1'r`_ 1 r ♦Y _ � e V , s : 4 + w IAN a i r4 N IL y `` �• y�i l , je n _ N CO • � l v ,w �� � �f�' fir.*� ��&• r ` � 1 t N > h 1 4 ±c .5d few-.`,r •!� .y'� Yy;i�:# ��1.�. °'`yF�a,�,��"rv}, �"..,.:. e