Loading...
HomeMy WebLinkAbout11/02/2009- email re: Addition of Storm Drain C Cv-uw Evelyn M. Turner From: Evelyn M. Turner Sent: Monday, November 02, 2009 12:23 PM To: eric@stonewood.com' Cc: Scott Oberaigner Subject: Peters Residence -Addition of Storm Drain Eric: Tom Kellogg, City Engineer, reviewed the plan for the additional catch basin and storm drain pipe that you dropped off Friday. The concept is acceptable but the pipe must not extend to the lake. It must end at least 75 feet from the lake with the outlet designed to control erosion. If this requires grading, the grading must be more than 75 feet from the lake. Whatever is constructed should be shown on the as-built survey that will be required before the CO is issued. Tom also asked me to remind you that if you intend to lower the sewer manhole on the lakeside of the property you should first consult Scott Oberaigner, Utilities Supervisor. He will determine who will do the work. He can be reached at 952-249-4600. Evelyn Turner City Planner City of Orono 952-249-4623 952-249-4616 (fax)