Loading...
HomeMy WebLinkAbout03-23-1993 - Scope of Project 2 C' S6 x ira9 • S � "f" Steven & Randi Carlson Date: 3/23/93 1185 Arbor Street Rev : Orono, Minnesota 55391 Job# 660 [] SCOPE OF PROJECT: Remodel existing upper and lower bathrooms. UPPER LEVEL BATHROOM [] Remove exisitng cabinet and haul away. [] Remove existing tub and lavitory and haul away. [] Remove existing flooring, and repair subfloor as required, to allow for new ceramic tile. (NOTE: Only subfloor replacement included, no joists, etc...) [] Remove existing wall finish to framing and install new 1/2" sheetrock (tape & sand). [] Install new 1/2" shettrock over existing ceiling finish (tape & sand). 1. Existing windows and doors to remain, protect as required. Install new oak ranch casing, bath side only, stained by OWNER. 2. Lavitory: * Manufacturer: CRANE. * Model: Erica pedistal. * Color: White. * Faucet: DELTA #522—CP, chrome. 3. Stool: * Manufacturer: AMERICAN STANDARD. * Model: New cadet. * Color: White. 4. Whirlpool tub: * Manufacturer: OASIS. * Model: #S-210, with removable skirt. * Color: White. * Surround: Ceramic tile: . ($3 sq.ft. allowance) * Shower door: Bypass with chrome trim and obscure glass. * Faucet: DELTA#1548 monitor tub & shower, chrome. Page 2 of 3 [] Ceramic tile: * Floor: . ($4 sq.ft. allowance) * Base: . ($2.50 If. allowance) * Wainscoat: . ($3 sq.ft. allowance) * Threshold: . ($15 allowance) * Accessories, towel bars, holders, etc... ($40 allowance). LOWER LEVEL BATHROOM [] Remove existing tub and haul away, all other plumbing fixtures to remain. 5. Remove existing window(throw) and fill in opening. 6. Tub: * Manufacturer: ROYALINE. * Model: 3—peice fiberglass bath bay. * Color: White. * Shower door: By OWNER. * Faucet: DELTA #1548 monitor tub & shower, chrome. [] Existing flooring to remain. GENERAL NOTES 7. Windows and doors to remain, protect as required. [] All painting, staining and decorating by OWNER. [] Floor covering by OWNER. (unless noted otherwise) [] 1 clean up of building debris at job completion by SAWHORSE. [] Plumbing per contract. [] Electric per contract: * ALL FIXTURES furnished by owner and installed by Sawhorse,if on job at electrical finish. (unless noted otherwise) * Switch and outlets to be "IVORY' color. * CABLE TV and/or PHONE rough—ins are by owner. Sawhorse will advise owner when to call for installation. * Any SECURITY SYSTEM repairs or additions by OWNER. * No smoke detector is included in this contract, but may have to be added depending on the condition of your existing detector. * Note you have been charged in this contract for: UPPER BATHROOM 1 — ground fault interrupter "GFI" receptacle 1 — standard light openings (no fixtures included) 1 — install fan/light (no fixture included) 3 — standard switches LOWER BATH No electrical alterations. Page 3 of 3 Any changes to the above quantities will be charged or credited accordingly. * Indicate any special receptacles needed for computers, entertainment centers, etc. and any special heights wanted. [] Customer HOT LINE 533-0343 ext. 55. [] CAUTION: DO NOT remove, tear down, or dig up anything before building permit is on job site. [] OWNER to protect or move all personal property from, in, or around construction area, both interior and exterior. Please review area before construction start—up and remove neccesary items.