HomeMy WebLinkAbout2009 Temp. & Perm. Erosions ControlSTORM WATER POLLUTION PREVENTION PLAN NOTES: 1. GRADING CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL UNDERGROUND UTILITIES WITH THE RESPECTIVE UTILITY COMPANIES PRIOR TO CONSTRUCTION. 2. ALL EROSION CONTROL MEASURES CALLED FOR ON THESE PLANS AND SPECIFICATIONS, WHICH MAY INCLUDE SILT FENCE, SEDIMENTATION BASINS OR TEMPORARY SEDIMENT TRAPS, SHALL BE CONSTRUCTED AND SERVICEABLE IN THE FOLLOWING ORDER: A. ROCK CONSTRUCTION ENTRANCES A MINIMUM OF 50 FEET. B. SILT FENCE. C. TEMPORARY CULVERTS. D. TEMPORARY SEDIMENTATION BASINS AND OUTFALL FACILITIES. E. STORM WATER POND CONSTRUCTION, F. COMMON EXCAVATION AND EMBANKMENT (GRADING ) G. SEED AND MULCH OR SOD. H.BIO-ROLL BARRIERS IN FINISHED GRADED AREAS. I. INLET AND OUTLET FACILITIES SUBSEQUENT TO STORM SEWER WORK. 3. GRADING CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY AND NPDES PHASE II PERMITTING REQUIREMENTS AS WELL AS EROSION CONTROL MEASURES AS MAY BE SHOWN ON THESE PLANS OR SPECIFICATIONS. GRADING CONTRACTOR SHALL IMPLEMENT ANY ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED TO PROTECT ADJACENT PROPERTY. 4. ALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED BY THE CONTRACTOR DURING GRADING OPERATIONS. ANY TEMPORARY FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE PLANS AND SPECIFICATIONS SHALL BE REMOVED BY THE GRADING CONTRACTOR WHEN DIRECTED BY THE ENGINEER. THE GRADING CONTRACTOR SHALL THEN RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. 5. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER SO THAT CERTIFICATION OF ALL CONTROLLED FILLS WILL BE FURNISHED TO THE OWNER DURING AND UPON COMPLETION OF THE PROJECT. 6. ALL DISTURBED AREAS, EXCEPT AREAS TO BE PAVED AND/OR SPECIFICALLY DESIGNED BY A LANDSCAPE PLAN, SHALL BE COVERED WITH A MINIMUM 4" OF TOP SOL. ALL DISTURBED AREAS SHALL BE SEEDED & MULCHED AT THE PRESCRIBED RATES WITHIN 72 HOURS OF FINAL GRADING UNLESS OTHERWISE NOTED. SEED MIX: MNDOT NO. 50B 50#/ACRE MULCH TYPE 1 2 TONS/ACRE (DISK ANCHORED) FERTILIZER: 150#/ACRE RATE OF APPLICATION 20-10-10 ALL EXPOSED SOIL AREAS WITH A CONTINUOUS POSITIVE SLOPE WITHIN 200 LINEAL FEET OF ANY SURFACE WATER, MUST HAVE TEMPORARY EROSION PROTECTION OR PERMANENT COVER FOR THE EXPOSED SOIL AREAS YEAR ROUND, ACCORDING TO THE FOLLOWING TABLE OF SLOPES AND TIME FRAMES. TYPE OF SLOPE TIME (Maximum time an area can remain open when the area is not actively being worked) STEEPER THAN 3:1 7 DAYS 10:1 TO 3:1 14 DAYS FLATTER THAN 10:1 21 DAYS 7. THE EXISTING TOPOGRAPHY AND CONTOUR ELEVATIONS SHOWN ON THE PLAN WERE TAKEN FROM A PLAN FURNISHED BY OWNER. 8. CONTRACTORS GRADING AND EROSION CONTROL OPERATIONS SHALL TAKE PLACE WITHIN THE CONSTRUCTION LIMITS. 9. IT IS REQUIRED THAT SOILS TRACKED FROM THE SITE BY MOTOR VEHICLES BE CLEANED DAILY FROM PAVED ROADWAY SURFACES THROUGHOUT THE DURATION OF CONSTRUCTION. 10. PROVIDE TEMPORARY SEDIMENTATION BASINS AS DIRECTED BY THE ENGINEER. 11. ALL REQUIREMENTS OF THE LOCAL WATERSHED DISTRICT SHALL BE SATISFIED PER THE APPROVED PERMIT. 12. ALL EROSION & SEDIMENT CONTROL MEASURES SHOWN ON THIS PLAN AND IMPLEMENTED IN THE FIELD AS DIRECTED BY THE ENGINEER SHALL CONFORM TO THE MPCA'S "PROTECTING WATER QUALITY IN URBAN AREAS: BEST MANAGEMENT PRACTICES FOR MINNESOTA". 13. DEWATERING AND/OR BASIN DRAINING DISCHARGE SHALL BE DIRECTED TO SEDIMENTATION BASINS WHEREVER POSSIBLE. ALL DISCHARGE POINTS SHALL BE ADEQUATELY PROTECTED FORM EROSION & SCOUR THROUGH USE OF APPROVED ENERGY DISSIPATION DEVICES. 14. ALL SOLID WASTE/ CONSTRUCTION DEBRIS SHALL BE DISPOSED OF IN ACCORDANCE WITH MPCA REQUIREMENTS. HAZARDOUS MATERIALS SHALL BE STORED/ DISPOSED OF IN COMPLIANCE WITH MPCA REGULATIONS 15. CONTRACTOR SHALL USE RAPID STABILIZATON METHODS PER MnDOT 2573 AS NEEDED DURING THE COURSE OF THE WORK TO MAINTAIN CONFORMANCE WITH THE CITY AND NPDES 11 PERMIT REQUIREMENTS. THIS WORK SHALL CONSIST OF OPERATIONS NECESSARY TO RAPIDLY STABILIZE SMALL CRITICAL AREAS, TO PREVENT OFF SITE SEDIMENTATION AND/OR TO COMPLY WITH PERMIT REQUIREMENTS. THE WORK MAY BE PREFORMED AT ANY TIME DURING THE CONTRACT AND DURING NORMAL WORKING HOURS. THIS WORK WILL BE CONDUCTED ON SMALL AREAS THAT MAY OR MAY NOT BE ACCESSIBLE WITH NORMAL EQUIPMENT. THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE APPLICABLE MnDOT STANDARD SPECIFICATIONS, THE DETAILS SHOWN IN THE PLANS, AND THE FOLLOWING: THERE ARE FIVE STABILIZATION METHODS APPROVED FOR THESE OPERATIONS. THESE METHODS MAY BE CONDUCTED INDEPENDENTLY OR IN COMBINATION. METHOD #1: APPLY TYPE 1 MULCH AND DISC ANCHOR METHOD #2: APPLY TYPE 1 MULCH AND TACK WITH TYPE 5 HYDRAULIC SOIL STABILIZER METHOD #3: HYDROSPREAD SEED,FERTILIZER AND TYPE 6 HYDRAULIC SOIL STABILIZER METHOD #4: HAND INSTALL SEED, FERTILIZER AND EROSION CONTROL BLANKET CATEGORY 3 METHOD #5: PLACE GEOTEXTILE AND RIP RAP CLASS II IN VARIOUS CONFIGURATIONS THESE EFFORTS WILL BE INCIDENTAL TO THE EROSION CONTROL BID ITEM. 16. CHANGE OF COVERAGE: FOR STORM WATER DISCHARGES FROM CONSTRUCTION PROJECTS WHERE THE OWNER OR OPERATOR CHANGES, (E.G.,AN ORIGINAL DEVELOPER SELLS PORTIONS OF THE PROPERTY TO VARIOUS BUILDERS) THE NEW OWNER OR OPERATOR MUST SUBMIT A SUBDIVISION REGISTRATION WITHIN 7 DAYS OF ASSUMING OPERATIONAL CONTROL OF THE SITE, COMMENCING WORK ON THEIR PORTION OF THE SITE , OR OF THE LEGAL TRANSFER, SALE OR CLOSING ON THE PROPERTY. 17. INDIVIDUAL SITE BUILDERS SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL NECESSARY EROSION CONTROL MEASURES AS MAY BE REQUIRED. REQUIRED ECM'S SHALL CONSIST OF BUT NOT BE LIMITED TO THE FOLLOWING: A. STAKED FIBER LOG ROLLS AT BACK OF ALL CURB EXCEPT AT CONSTRUCTION/DRIVEWAY ENTRANCE. B. SILT FENCE ON ALL DOWN GRADIENT SLOPES FROM CONSTRUCTION AREA. SILT FENCE SHALL HAVE THE BOTTOM DUG IN WITH SOIL FIRMLY COMPACTED. C. ROCK CONSTRUCTION ENTRANCE HAVING 1" TO 2" CLEAR ROCK OVER GEOTEXTILE FABRIC. D. STREET CLEANING AS MAY BE REQUIRED SHOULD VEHICLE TRACKING OCCUR. INDIVIDUAL SITE BUILDERS ARE REQUIRED TO MAINTAIN ECM'S UNTIL SUCH TIME AS INDIVIDUAL YARDS/VEGETATION ARE ESTABLISHED. 18. CONTRACTOR SHALL PROVIDE A TEMPORARY SEDIMENTATION BASIN ON SITE FOR CONSTRUCTION WASH OUT USE. TEMPORARY BASIN SHALL BE LOCATED AS TO PROVIDE EASY ACCESS FOR CONSTRUCTION VEHICLES AND CONCRETE TRUCKS AS NECESSARY. 19. INLET SEDIMENTATION CONTROL IS TO BE PROVIDED TO ALL STORM SEWER CATCH BASINS THROUGHOUT CONSTRUCTION. MEASURES APPLIED SHALL COMPLY WITH BEST MANAGEMENT PRACTICES FOR MINNESOTA AND APPLICATIONS OF NPDES PHASE 11 AS APPROPRIATE FOR PHASE OF CONSTRUCTION, EROSION -F CONSTRUCTION SEQUENCING 1. CONSTRUCTION WILL CONSIST OF RAIN GARDEN EXCAVATION CONSTRUCTION, GRAVEL STRIPPING, GRAVEL INSTALLATION, PAVING INSTALLATION, FENCING AND BERM CONSTRUCTION. 2. RESPONSIBLE PARTY FOR EROSION INSPECTION AND MAINTENANCE IS: NATE WENDT, ROCHON CORP. (763) 559-9393. 3. PHASING PER SHEET 1 PHASE NOTES. 4. PROJECT SCHEDULE: 3-6 WEEKS OVER ALL LENGTH. WEATHER DEPENDENT. 5. INSTALLATION OF EROSION: AT START OF PROJECT. WIRE MESH REINFORCEMENT (OPTIONAL) 7 METAL OR WOOD POST OR STAKE ENGINEERING FABRIC FABRIC ANCHORAGE TRENCH BACKFILL WITH TAMPED NATURAL SOIL DIRECTO FOF OW t RUNOFF FINCH MINIM `. —NATURAL. FIN: st .; 6 INCH MINIMUM NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH WITH HOG RINGS, STEEL POSTS WITH TIE WIRES, OR WOOD POSTS WITH STAPLES. TYPICAL INSTALLATION FOR SILT FENCE (SECTION 6.3, MPCA'S "BEST MANAGEMENT PRACTICES") 1" X 2" X 18" LONG WOODEN STAKES AT 1' 0" SPACING MAXIMUM. STAKES SHALL BE DRIVEN THROUGH THE BACK HALF OF THE BIOROLL AT AN ANGLE OF 45 DEGREES WITH THE TOP OF THE STAKE POINTING UPSTREAN PROVIDE 8" TO 10" OF EMBEDMENT DEPTH. FLOW TEMPORARY SILT FENCE TEMPORARY SEED & — MULCH ALL DISTURBED AREAS PER SWPPP NOTE 6. RELOCATE FENCE TO EAST SIDE OF RAIN GARDEN. LOCATE TEMPORARY SILT FENCE ON PROPERTY LINE. MAY USE 810 -ROLLS AS ALTERNATE. RAIN GARDEN DEPRESSION STORMWATER CONTROL or-\`—`—` ------- -------------------- ----- O----------------------------------------------------------------—_—_—_— '-------------------------- --- `------ ---------------- ---- ---- -----_ "--------------------------- ------------- ----- -- --------------------------- ---- _ -- ------------- ----------------——�=a- ----------- -------------------------------------- ---- ------ — --- ' - � N - ---- ---- 1021 �� � ---- _ --- J _ I �, • � � 101 J- - 1020= -_---- ---- - 1� i i I I 0 TEMPORARY SEED ON BERM IF VACANT FOR MORE THAN 14 DAYS -------------------1020 -------- 1019.5 ------------------------ ---------��________ ----------------------- � ---- j. \ , 1021 \ 1022 \' ---- —-------- ----- 1022.5 ---------------------- 7------------------------------------------------------- L.P. ___--- i EDGE OF NEW PAVEMENT ! 3 f 3 F_ — — — — / — — — — — — — — - '--- - -- — — — / NO 2`1\ 1 - PARKING w r ------ Y \ II �v I I MATCH % j EXISTING o ELEVATION / Z I ®Jx— Q N 1 \ 0-I N \ / I n\ o 0 \ O / I \ w BLOCK BUILDING I\ 1 , o jo \ 1 0 \ N ADDRESS NO. 2687 TEMPORARY EROSION MEASURES db ,f dl2! '\ � 1 \ oro ow 1 11 1 I I \ \ \\ I I \ \ 1 I I \ \ \ + I I I I 1 1 I I I I 1 1 I I I I I I I I 1 I I I 1 I I I I 1 I I I I 1 I , I I I I I I I I I I \ i i 'TEMPORARY SILT'�FENCE f I I \ I I + I \ I I I \ I I I \ 1 \ I I I 1 1 I I I \ \ I I 1 \ \ I I I \ \ I I I I 1 I , I I _ 1 I I I I \ \ \ I 1 \ \ EDGE OF \\ \\\ NEWI ASPHALT \\ N 44 0 R T N 0 10 20 40 SCALE IN FEET NOTE: CONTRACTOR IS RESPONSIBLE FOR INSTALLATION, MAINTENANCE AND REMOVAL OF ALL APPLICABLE EROSION & SEDIMENT CONTROL ITEMS. BIOROLL EROSION PROTECTION LEGEND » „ 8 10 EMBEDMENT DEPTH DRAINAGE ARROW .........._ ..__..._...........te. >p 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER TME LAWS OF THE STATE OF MINNESOTA. PRINT NAME: MICHAEL B. BRANDY , P.E. SIGNATURE: DATE 5-19-09 LICENSE # 41258 902 PROPOSED CONTOUR STAKING DETAIL �-10PROPOSED 10' CONTOUR { - - - -_ P - 0- 0 ----- - - _ - -- w ---- - --- .BIOROLL -=-------.-----_-_.--_-_--_---- -----_------ --- ----------- — CL STREET STORM WATER POLLUTION PREVENTION PLAN CURB & GUTTER EXISTING SAN. SEWER -: .... ................... ... .. - _ N _ ____ _ — — — — — — — — BLDG. SETBACK LINE SCHEDULE OF INSTALLATION + MAINTENANCE CALL 48 HOURS BEFORE DIGGING: > °I o- .. --- --- 1021 ----------------------------------------------- - - -- - - - GOPHER STATE O N E CALL ITEM INSTALLATION INSPECTION CT10N & MAINTENANCE REMOVAL D& U EASEMENT LINE CALL 811 - - --11 1 WETLAND POND INSPECT & MAINT. AFTER TRIBUTARY > BLOCK BU BUFFER NE _ — — DELINEATED WETLAND LINE PRIOR TO COMMENCEMENT AFTER EACH RUN-OFF DRAINAGE AREA IS \% I o ADDRESS NO r >> SILT FENCE OF EARTHWORK OPERATIONS. EVENT. REMOVE SEDIMENTS RESTORED. EXISTING STORM SEWER 1\ I PERMANENT SEED &MULCH AS REQUIRED. PROPOSED STORM SEWER » - , \ OPEN AREAS NOT RECEIVING / . \\ INSTALL 8 CY ROCK CONST. PRIOR TO COMMENCEMENT INSPECT REGULARLY.PRIOR TO PAVING. DRIVE AISLE PANG SECTION PERMANENT j� t ''= I SPECIAL PLANTINGS. CL 3 PERMANENT RIPRAP ENTRANCE OF EARTHWORK OPERATIONS. MAINTAIN AS NEEDED. \` EROSION i i OVERFLOW SWALE (TIE OUTLET SKIMMER AFTER POND GRADING INSPECT REGULARLY. PERMANENT. �O* j INTO EXISTING RIP RAP. STRUCTURE IS COMPLETED. MAINTAIN AS NEEDED. ` = _'�,a _ 3 l UPON COMPLETION OF INSPECT & MAINTAIN RIP -RAP & POND GRADING, CONC. AT LEAST ANNUALLY PERMANENT. -rITT E� I FILTERr\� SWALE CONST. AND AND AFTER HEAVY I OUTLET INSTALLATION. RAINFALL EVENTS. STAKE INSPECT &MAINTAIN�F — — DETENTION POND DURING EARTHWORK AFTER HEAVY RAINFALL PERMANENT. — — * i / w / - — — — N i 1 OPERATIONS. EVENTS. REMOVE SEDIMENTS AS NEEDED. _ - F $ \ 1 \ INSPECT &MAINTAIN NO REMOVAL SEED &MULCH AFTER FINAL GRADING AFTER HEAVY RAINS. STRAW OR WOOD FIBER 6" TO 7" DIA. ROLL ENCLOSED IN \ / NEW PAVEMENT SURFACE = t` , NECESSARY. OPERATIONS. REPLACE WASH-OUT PLASTIC OR POLYESTER NETTING _ 1 AREAS IMMEDIATELY.._ / \\ INLET PROTECTION UPON INLET CONSTRUCTION WHEN 1/3 CAPACITY OF AFTER TRIBUTARY AREAS /` -------------- -- I BMP IS REACHED ARE FULLY RESTORED.: _ \\\l NOTE: CONTRACTOR IS RESPONSIBLE FOR INSTALLATION, MAINTENANCE AND REMOVAL OF ALL APPLICABLE EROSION & SEDIMENT CONTROL ITEMS. BIOROLL EROSION PROTECTION LEGEND E-20 -------902------- EXISTING CONTOUR DRAINAGE ARROW -------910-------- EXISTING 10' CONTOUR 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER TME LAWS OF THE STATE OF MINNESOTA. PRINT NAME: MICHAEL B. BRANDY , P.E. SIGNATURE: DATE 5-19-09 LICENSE # 41258 902 PROPOSED CONTOUR SPENSA OR ON 0, MINNESOTA SPENSA DEVELOPMENT GROUP LLC �-10PROPOSED 10' CONTOUR om — CL STREET CURB & GUTTER EXISTING SAN. SEWER 1 — — — — — — — — BLDG. SETBACK LINE > CALL 48 HOURS BEFORE DIGGING: > PROPOSED SAN. SEWER GOPHER STATE O N E CALL Q D& U EASEMENT LINE CALL 811 i WETLAND POND \ /N \\ I IN > BLOCK BU BUFFER NE — — DELINEATED WETLAND LINE E-20 DRAINAGE ARROW — — — -- — — _ — 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER TME LAWS OF THE STATE OF MINNESOTA. PRINT NAME: MICHAEL B. BRANDY , P.E. SIGNATURE: DATE 5-19-09 LICENSE # 41258 M••••• ....... SPENSA OR ON 0, MINNESOTA SPENSA DEVELOPMENT GROUP LLC SILT FENCE om N > EXISTING SAN. SEWER 1 O1\ II > > > PROPOSED SAN. SEWER Io / Q 1 6-18-09 i EXISTING WM \ /N \\ I IN > BLOCK BU z I PROPOSED WM \% I o ADDRESS NO I >> >> EXISTING STORM SEWER » PROPOSED STORM SEWER » DRIVE AISLE PANG SECTION PERMANENT EROSION M DESIGNED: MBB 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER TME LAWS OF THE STATE OF MINNESOTA. PRINT NAME: MICHAEL B. BRANDY , P.E. SIGNATURE: DATE 5-19-09 LICENSE # 41258 Anderson Engineering of Minnesota, LLC CIVIL ENGINEERIN G A N D L A N D S U R V E Y IN G 13605 1st AVENUE NORTH, SUITE 100, PLYMOUTH, MN 55441 TEL (763) 412-4000 FAX (763) 412-4090 SPENSA OR ON 0, MINNESOTA SPENSA DEVELOPMENT GROUP LLC TEMPORARY & PERMANENT EROSION CONTROL PLAN COMM. NO. 11586 PLOTTED: DRAWN: PSH DRAWING N0. C 2 O r 2 7-17-09 CITY ENGINEER FINAL COMMENTS – PAVE SECTION PRIVATE 1 6-18-09 CITY ENGINEER COMMENTS CHECKED BY: N0. DATE DESCRIPTION OF REVISIONS