Laserfiche WebLink
EROSION CONTROL NOTES: SEDIMENT AND EROSION CONTROL FOR <br />All disturbed ground left inactive for 14 or more days must have temporary or permanent stabilization year round. <br />For sites with more than ten acres disturbed at one time, or if a channel originates in the disturbed area, one or <br />more temporary or permanent sedimentation basins shall be constructed. Each sedimentation basin shall have a <br />surface area of at least one percent of the area draining to the basin and at least three feet of depth and <br />constructed in accordance with accepted design specifications. Sediment shall be removed to maintain a depth of <br />GINA PAULUCCI <br />three feet. The basin discharge rate shall also be sufficiently low as to not cause erosion along the discharge <br />channel or the receiving water. <br />Perimeter sediment control measures shall be placed along all down gradient perimeters of the site. If a channel <br />or area of concentrated runoff passes through the site, perimeter sediment control measures shall be placed <br />along the channel edges to reduce sediment reaching the channel. All down gradient perimeter sediment control <br />measures must include a maintenance and inspection schedule. <br />t !� <br />Any soil or dirt storage piles containing more than ten cubic yards of material should not be located within 25 <br />feet from a roadway or drainage channel. If remaining for more than 14 days, they shall be stabilized by <br />mulching vegetative cover, tarps or other means and enclosed with down gradient perimeter sediment controls. <br />Piles which will be in existence for less than 14 days shall be enclosed with perimeter sediment controls. <br />Pipe outlets must have energy dissipation installed within 24 hours of connection to waters of the state. <br />LIGHT <br />POLE <br />Inspections and maintenance. The owner shall be responsible for conducting inspections and maintenance of all <br />erosion and sediment control BMPs on site. <br />\ \ \ \ I I I I I <br />Inspections, maintenance, and rainfall on site must be documented and readily available for review. Inspections <br />1 <br />are required as followed: <br />Once every seven days on exposed soil areas. <br />Within 24 hours after a one-half inch or greater rain event over 24 hours. <br />Once every 30 days on stabilized areas. <br />As soon as runoff occurs or prior to resuming construction on frozen ground. <br />Maintenance is required as follows: \\ \k \ /22" HLC DRY / 7 / <br />When sediment reaches 1/3 the height of the BMP on perimeter control devices, sediment must be removed within \ / /�.HI DRQ <br />STEEL FENCE POST (T -POSH, MONOFILAMENT GE-OTE)MLE <br />MINIMUM 5' LONG, FABRIC PER MNDOTTABLE <br />6' MAXIMUM SPACING. 3886-1. <br />ATTACH FABRIC TO POST WITH <br />MINIMUM 3 ZIP TIES (50 LB. <br />TENSILE) PER POST IN TOP 8" <br />OF FABRIC. <br />POST NOTCHES <br />TO FACE AWAY <br />FROM FABRIC. LAY FABRIC IN THE TRENCH, <br />BACKFILL WITH NATURAL <br />SOIL, AND COMPACT WITH <br />LIGHT EQUIPMENT PRIOR TO <br />PLACEMENT OF THE POSTS. <br />DIRECTION OF <br />SURFACE FLOW <br />24" MINIMUM <br />POST EMBEDMENT <br />6" <br />NOTES: <br />1. SPLICING WILL BE MADE AT OPPOSING SILT FENCE POSTS BY PLACING POSTS <br />AND SILT FENCE NEXT TO EACH OTHER AND ROTATING 3601. <br />2. HEAVY DUTY SILT FENCE IS MACHINE SLICED TYPE SILT FENCE THAT IS HAND <br />INSTALLED IN AREAS INACCESSIBLE TO EQUIPMENT DUE TO SPACE <br />LIMITATIONS, WET SOILS, STEEP SLOPES, ETC. <br />A � LIST REYLSION: <br />//�O`1' \� Apd12008 <br />SILT FENCE <br />HEAVY DUTY PLare rv°. <br />tartFsxo�`% EI2D-iC <br />24 hours of discovery.\ <br />\ \ / // / / � / ,! / / BASSWOOD'-,/ / / / / 9 / \ BASSWOOD <br />12" CMP <br />If the perimeter control device is not functional it must be repaired or replaced within 24 hours of discovery. INv=9s5.24 / \ �� / '� / / / I I I --�_� 46"sPRudE / / / \ \ — / �� ------ _ <br />Temporary sediment basins shall be maintained when sediment reaches'/2 the outlet height or Y2 the basin storage °Y / / L� �� / / / / "ASH/ / I I \ _ _ \ <br />/ / / / \ <br />volume. Basins must be drained or sediment removed within 72 hours of discovery. r / / / / / / / / / / / ( I \ \ ��'"�� �' \ �� —--4 ` \� �!ry W � W N o ``' <br />V / / / INv 89_ $757 / // // / / I i 1 \ \ \ 1 ��`— ` \ �� J \�----��_ \\ �� �N'p N o r =oma <br />Sediment must be removed from paved surfaces within 24 hours of discovery. I / \ / / // / / // / / / / 1 \ \ \ ' \18"BASSWOOD <br />Erosion into streets wetlands or water bodies. If eroded soils (including tracked soils from constructionSPC/E <br />activities enter or appear likely to enter streets, wetlands, or other water bodies, prevention strategies, <br />cleanup and repair must be immediate with the appropriate approvals from the DNR, MPCA, or any other state, <br />federal, or local agencies as necessary. The owner shall provide all traffic control and flagging required to / <br />99 9 /u T IV I <br />protect the traveling public during cleanup operations. \ / �E /I I I\ \\ \ \\ \\ \\ \ \ I I � N,, ~`'`� °N�FS /I I <br />Erosion off-site. If erosion breaches the perimeter of the site, the owner shall immediately develop a �\ / //� / / I J I / I !! \ \ \ \ \ \ \ ° TILE O T\ T 1 i CB <br />cleanupand restoration plan, obtain right -of -entry from the adjoining property owner and etappropriate \ / / I I I I ( \ \ \ \ \ I Iv=1�pa 51 RI 12.47 \ �� <br />P 9 rY J 9 P P 9\ \ ' / / I I I I i I \ \\ \\ \ \\ \ 11 "-I---I— 010.26/ <br />approvals from all state, federal, and local agencies as necessary.Then implement the cleanup and restoration -- <br />Ian within 48 hours of obtainingthe adjoining property owner's permission and approval from any appropriate \ / J I I I <br />P agencies. \ / 4•SP�CE I I I \ 'O <br />state, federal, and localag j � / I I I I I \\ �'0 \ \ i I I ` <br />WILL <br />I I <br />LIGHT/l ' rl / / II I I <br />/ / POLE <br />\ �il / ! 8"SPR C I I I <br />OUND i NVV969.00 , / l l— / // l I l / I I I \ \ \ I I I I �'•IA to I <br />/ / \ l / t l 1 I I I I I <�� \ s09 I <br />\� � I /� I I \ \ � \ 1 1 1 1 1 1 1 I I I 1 � � ! I I I I <br />5 I/ /� / / / / / / / \ \ I I I \ �/ (1013.2) <br />� Q 18" ASH I ' , , I I , I <br />/ \ / <br />a Z� <br />W0WLL <br />11 I��WO <br />I <br />H6R CHESTAUT \ S��a O �M� / LiC7 / / / > Z W \ <br />// // / / /- // / x 1 1 1 1 \ e / / /0 W_ <br />Z a cn w <br />g r �- v) <br />� 1 / / Ur SPRUCE ' 1 1 1 1 \ \ \ q C std °ae P � a�O�Q�� C3��� r � (1 �1 / / / / J O JED <br />EROSION CONTROL NOTES CONTINUED: I I 1 I 1 , \ \ \ \ K r o P D Rl^V E `" 5�° ate Q �bo 4 / �� As //// / / / 1 Q F Z: Z <br />Site dewatering. Water pumped from the site shall be treated b temporary sedimentation basins, grit I I I 1 1 \ \ \ \ / / ¢�� ` / / / // LL b CO o � <br />9 P P Y p° ry ` / <br />8"SPR6CE \ Qj / / LLI <br />�/� chambers, sand filters, upflow chambers, hydrocyclones, swirl concentrators or other appropriate I I I 1 1 1 1 \ \ \ \ / I A ��'o' / <br />/ \ w � Z <br />/ I / c / / controls as appropriate. All water from dewatering must be discharged in a manner that does not cause / I I \ \ �,�� "\ �� � / / / / // / // / //^ UT } o <br />�) I / <br />RIM=975.3E \ / I H nuisance conditions, erosion in receiving channels or on downslope properties, or inundation in I I \ / <br />/ � I <br />I / / O / \ ®� I 1 1 \\ \ \\ � /��/ / / w=z <br />Iwetlands causing significant adverse impact to the wetland. I\\IL-237 / d n\1N\.h1973.19 <br />, , \ \ \ \ \ , , / , I25ZW <br />All discharge points must be adequately protected from erosion and scour. The discharge must be \ \ \ \ r <br />18" SPRUCE I / � 9 P q Y P \ \ \ \ PLANTED / 26" / 1 / _ � W 0 <br />II i I Q / // = I �-�\\ B I I dispersed over natural rock riprap, sand bags, plastic sheeting or other accepted energy dissipation \ \ \ p / / / / / o z <br />\ / measures. Adequate sedimentation control measures are required for discharge water that contains \ \ \ \ \ \ \ \ <br />Stu -1001 ) -+P lI / / / / / / / I I Q w >. <br />IM_97 / r suspended solids. \ \ \ \ \ \ ` \ /� 11.5 s.z z5z (7p / / 8 \ / / / / / I I I O <br />' -97 1 r V=9 30 r/ P \ \ \ \ \ 1.0 �3 �� \ / / / / / I I >- Ln w <br />I / / 22' \\ / \ \ \ A ISTING \ I I ► I l I I P C Q � . N <br />I � Construction site waste. \ \ \ / <br />I / / <br />15)s- O / I \ C / \ \ \ \SOFT\(LAAPLES \ / I I W Q — U) Q , <br />8 Z_ LI HT / / �/ Waste and material disposal: All waste, unused building material (including garbage debris, cleaning \ \\ \ \ \ THRESHOLD L=17.0 r- \ 1 / I I 1 I I >_ w ~ Z o `0 <br />� ELEV=1016.1 'n \ I >- Q Z <br />A Poi / / wastes wastewater, to materials or hazardous materials), collected sediment, asphalt and concrete \ \�` r \ \ \ m \ I I I I W CL = w w <br />\ i 9 g p fabric construction and demolition debris and other \\\ I I I ,5.6 33.5 W A z \ I I / I / I I a gZ Q <br />millings, floating debris, paper, plastic, , <br />wastes must be properly contained on site and disposed of off site, not allowed to be carried by runoff \ I I I 1 (1013.0) �i 1 °' �� I ( I I I I ( i a Q Z _ o <br />into receiving channel or storage sewer system. \ 1\ 1\ I PLANTED <br />\ I I <br />8"SPRUCE / \\ C I I I I I I I I I <br />O i I Hazardous materials: Oil, gasoline, paint and any hazardous substances must be properly stored, W Z LLJ \ \ I I / oI I I I I z <br />spill,\A9 (1014.7) I I I I I I Z <br />� Q cYLJincludin secondary rycontainment, to prevent leaks or other discharge. Restricted access to storage (1o13.$) 9 <br />I qiH <br />OI / 8.5 areas must be provided to prevent vandalism. Concrete wash must be limited to a defined area of the site \\� \ I I o.4 I 0.4 I I I I I I ( I I I I w _ <br />I \ I and runoff must be contained within the defined area. Storage of hazardous waste must be in compliance \\\ \ l I PATIO J/ I \ \I I 1 I I I o v <br />)SPRUCE with MPCA regulations. <br />/ I / Liquid waste: All non stormwater discharges (concrete truck washout, vehicle washing, maintenance spills, I <br />/ I etc. conducted during the construction activity must comply with the newest version of the state NPDES permit. \ I --1e44- <br />I I Sanitary facilities: Adequate on-site sanitary facilities shall be provided in convenient location(s) for all <br />/ I / persons who work on the site. <br />Tracking. Each site shall have graveled roads, access drives and parking areas of sufficient width and length � Y <br />\ / / to prevent sediment from being tracked onto public or private roadways. Any sediment reaching a public or I Z <br />private road shall be removed by street cleaning before the end of each workday. <br />_-----900 ----- : <br />Drain inlet protection. All storm drain inlets shall be protected during construction with control measures as EXISTING CONTOUR <br />\ approved by the city. These devices shall remain in place until final stabilization of the site. A regular PROPOSED CONTOUR <br />\ inspection and maintenance plan shall be developed and implemented to assure these devices are operational at 900 <br />\ all times. <br />\NOTE: PROPOSED EXCAVATION = 700 C.Y. <br />Site erosion control. <br />PROPOSED FILLING = 300 C.Y. <br />\ Channelized runoff from adjacent areas passing through the site shall be diverted around disturbed areas, if <br />\ practical. Diverted runoff shall be conveyed in a manner that will not erode the conveyance at receiving <br />channels. All temporary or permanent drainage channels must be stabilized within 24 hours of being connected <br />to a water of the state. Sediment control is required along channel edges to reduce sediment reaching the channel. <br />\ \ All activities on the site shall be conducted in a logical sequence to minimize the area of bare soil exposed at <br />any one time. <br />0 20 40 <br />O� <br />U <br />80 w <br />SCALE IN FEET <br />DECEIVED <br />JUN 22 2011 <br />CITY OF ORONO <br />W <br />� <br />ZZ�'�, <br />I- <br />W <br />W <br />°- <br />N <br />U! <br />LO <br />a <br />■ ■ <br />C6 <br />O <br />V <br />LL <br />W <br />0 <br />Cl) <br />>^J <br />^Wqqt <br />CO) <br />!>/ <br />0 <br />Z <br />J <br />IX <br />am <br />W <br />QN <br />WLn <br />Wz- <br />J <br />4m <br />Z <br />Z <br />Z <br />W <br />Z <br />0 <br />O>'ta <br />V <br />V <br />0 <br />24 hours of discovery.\ <br />\ \ / // / / � / ,! / / BASSWOOD'-,/ / / / / 9 / \ BASSWOOD <br />12" CMP <br />If the perimeter control device is not functional it must be repaired or replaced within 24 hours of discovery. INv=9s5.24 / \ �� / '� / / / I I I --�_� 46"sPRudE / / / \ \ — / �� ------ _ <br />Temporary sediment basins shall be maintained when sediment reaches'/2 the outlet height or Y2 the basin storage °Y / / L� �� / / / / "ASH/ / I I \ _ _ \ <br />/ / / / \ <br />volume. Basins must be drained or sediment removed within 72 hours of discovery. r / / / / / / / / / / / ( I \ \ ��'"�� �' \ �� —--4 ` \� �!ry W � W N o ``' <br />V / / / INv 89_ $757 / // // / / I i 1 \ \ \ 1 ��`— ` \ �� J \�----��_ \\ �� �N'p N o r =oma <br />Sediment must be removed from paved surfaces within 24 hours of discovery. I / \ / / // / / // / / / / 1 \ \ \ ' \18"BASSWOOD <br />Erosion into streets wetlands or water bodies. If eroded soils (including tracked soils from constructionSPC/E <br />activities enter or appear likely to enter streets, wetlands, or other water bodies, prevention strategies, <br />cleanup and repair must be immediate with the appropriate approvals from the DNR, MPCA, or any other state, <br />federal, or local agencies as necessary. The owner shall provide all traffic control and flagging required to / <br />99 9 /u T IV I <br />protect the traveling public during cleanup operations. \ / �E /I I I\ \\ \ \\ \\ \\ \ \ I I � N,, ~`'`� °N�FS /I I <br />Erosion off-site. If erosion breaches the perimeter of the site, the owner shall immediately develop a �\ / //� / / I J I / I !! \ \ \ \ \ \ \ ° TILE O T\ T 1 i CB <br />cleanupand restoration plan, obtain right -of -entry from the adjoining property owner and etappropriate \ / / I I I I ( \ \ \ \ \ I Iv=1�pa 51 RI 12.47 \ �� <br />P 9 rY J 9 P P 9\ \ ' / / I I I I i I \ \\ \\ \ \\ \ 11 "-I---I— 010.26/ <br />approvals from all state, federal, and local agencies as necessary.Then implement the cleanup and restoration -- <br />Ian within 48 hours of obtainingthe adjoining property owner's permission and approval from any appropriate \ / J I I I <br />P agencies. \ / 4•SP�CE I I I \ 'O <br />state, federal, and localag j � / I I I I I \\ �'0 \ \ i I I ` <br />WILL <br />I I <br />LIGHT/l ' rl / / II I I <br />/ / POLE <br />\ �il / ! 8"SPR C I I I <br />OUND i NVV969.00 , / l l— / // l I l / I I I \ \ \ I I I I �'•IA to I <br />/ / \ l / t l 1 I I I I I <�� \ s09 I <br />\� � I /� I I \ \ � \ 1 1 1 1 1 1 1 I I I 1 � � ! I I I I <br />5 I/ /� / / / / / / / \ \ I I I \ �/ (1013.2) <br />� Q 18" ASH I ' , , I I , I <br />/ \ / <br />a Z� <br />W0WLL <br />11 I��WO <br />I <br />H6R CHESTAUT \ S��a O �M� / LiC7 / / / > Z W \ <br />// // / / /- // / x 1 1 1 1 \ e / / /0 W_ <br />Z a cn w <br />g r �- v) <br />� 1 / / Ur SPRUCE ' 1 1 1 1 \ \ \ q C std °ae P � a�O�Q�� C3��� r � (1 �1 / / / / J O JED <br />EROSION CONTROL NOTES CONTINUED: I I 1 I 1 , \ \ \ \ K r o P D Rl^V E `" 5�° ate Q �bo 4 / �� As //// / / / 1 Q F Z: Z <br />Site dewatering. Water pumped from the site shall be treated b temporary sedimentation basins, grit I I I 1 1 \ \ \ \ / / ¢�� ` / / / // LL b CO o � <br />9 P P Y p° ry ` / <br />8"SPR6CE \ Qj / / LLI <br />�/� chambers, sand filters, upflow chambers, hydrocyclones, swirl concentrators or other appropriate I I I 1 1 1 1 \ \ \ \ / I A ��'o' / <br />/ \ w � Z <br />/ I / c / / controls as appropriate. All water from dewatering must be discharged in a manner that does not cause / I I \ \ �,�� "\ �� � / / / / // / // / //^ UT } o <br />�) I / <br />RIM=975.3E \ / I H nuisance conditions, erosion in receiving channels or on downslope properties, or inundation in I I \ / <br />/ � I <br />I / / O / \ ®� I 1 1 \\ \ \\ � /��/ / / w=z <br />Iwetlands causing significant adverse impact to the wetland. I\\IL-237 / d n\1N\.h1973.19 <br />, , \ \ \ \ \ , , / , I25ZW <br />All discharge points must be adequately protected from erosion and scour. The discharge must be \ \ \ \ r <br />18" SPRUCE I / � 9 P q Y P \ \ \ \ PLANTED / 26" / 1 / _ � W 0 <br />II i I Q / // = I �-�\\ B I I dispersed over natural rock riprap, sand bags, plastic sheeting or other accepted energy dissipation \ \ \ p / / / / / o z <br />\ / measures. Adequate sedimentation control measures are required for discharge water that contains \ \ \ \ \ \ \ \ <br />Stu -1001 ) -+P lI / / / / / / / I I Q w >. <br />IM_97 / r suspended solids. \ \ \ \ \ \ ` \ /� 11.5 s.z z5z (7p / / 8 \ / / / / / I I I O <br />' -97 1 r V=9 30 r/ P \ \ \ \ \ 1.0 �3 �� \ / / / / / I I >- Ln w <br />I / / 22' \\ / \ \ \ A ISTING \ I I ► I l I I P C Q � . N <br />I � Construction site waste. \ \ \ / <br />I / / <br />15)s- O / I \ C / \ \ \ \SOFT\(LAAPLES \ / I I W Q — U) Q , <br />8 Z_ LI HT / / �/ Waste and material disposal: All waste, unused building material (including garbage debris, cleaning \ \\ \ \ \ THRESHOLD L=17.0 r- \ 1 / I I 1 I I >_ w ~ Z o `0 <br />� ELEV=1016.1 'n \ I >- Q Z <br />A Poi / / wastes wastewater, to materials or hazardous materials), collected sediment, asphalt and concrete \ \�` r \ \ \ m \ I I I I W CL = w w <br />\ i 9 g p fabric construction and demolition debris and other \\\ I I I ,5.6 33.5 W A z \ I I / I / I I a gZ Q <br />millings, floating debris, paper, plastic, , <br />wastes must be properly contained on site and disposed of off site, not allowed to be carried by runoff \ I I I 1 (1013.0) �i 1 °' �� I ( I I I I ( i a Q Z _ o <br />into receiving channel or storage sewer system. \ 1\ 1\ I PLANTED <br />\ I I <br />8"SPRUCE / \\ C I I I I I I I I I <br />O i I Hazardous materials: Oil, gasoline, paint and any hazardous substances must be properly stored, W Z LLJ \ \ I I / oI I I I I z <br />spill,\A9 (1014.7) I I I I I I Z <br />� Q cYLJincludin secondary rycontainment, to prevent leaks or other discharge. Restricted access to storage (1o13.$) 9 <br />I qiH <br />OI / 8.5 areas must be provided to prevent vandalism. Concrete wash must be limited to a defined area of the site \\� \ I I o.4 I 0.4 I I I I I I ( I I I I w _ <br />I \ I and runoff must be contained within the defined area. Storage of hazardous waste must be in compliance \\\ \ l I PATIO J/ I \ \I I 1 I I I o v <br />)SPRUCE with MPCA regulations. <br />/ I / Liquid waste: All non stormwater discharges (concrete truck washout, vehicle washing, maintenance spills, I <br />/ I etc. conducted during the construction activity must comply with the newest version of the state NPDES permit. \ I --1e44- <br />I I Sanitary facilities: Adequate on-site sanitary facilities shall be provided in convenient location(s) for all <br />/ I / persons who work on the site. <br />Tracking. Each site shall have graveled roads, access drives and parking areas of sufficient width and length � Y <br />\ / / to prevent sediment from being tracked onto public or private roadways. Any sediment reaching a public or I Z <br />private road shall be removed by street cleaning before the end of each workday. <br />_-----900 ----- : <br />Drain inlet protection. All storm drain inlets shall be protected during construction with control measures as EXISTING CONTOUR <br />\ approved by the city. These devices shall remain in place until final stabilization of the site. A regular PROPOSED CONTOUR <br />\ inspection and maintenance plan shall be developed and implemented to assure these devices are operational at 900 <br />\ all times. <br />\NOTE: PROPOSED EXCAVATION = 700 C.Y. <br />Site erosion control. <br />PROPOSED FILLING = 300 C.Y. <br />\ Channelized runoff from adjacent areas passing through the site shall be diverted around disturbed areas, if <br />\ practical. Diverted runoff shall be conveyed in a manner that will not erode the conveyance at receiving <br />channels. All temporary or permanent drainage channels must be stabilized within 24 hours of being connected <br />to a water of the state. Sediment control is required along channel edges to reduce sediment reaching the channel. <br />\ \ All activities on the site shall be conducted in a logical sequence to minimize the area of bare soil exposed at <br />any one time. <br />0 20 40 <br />O� <br />U <br />80 w <br />SCALE IN FEET <br />DECEIVED <br />JUN 22 2011 <br />CITY OF ORONO <br />