Loading...
HomeMy WebLinkAbout2000 - P02940 - mechanical PERMIT C TY OF ORONO 2750 Kelley Parkway - PO Box 66 Permit Number: P02940 Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits (612) 249-4600 Date Issued: 9/11/200 SITE ADDRESS: 200 Woodhill Rd WAYZATA,MN 55391 PID: 02-117-23-12-0001 DESCRIPTION: Proposed Use: Commercial Permit Class: General Permit Type: Mechanical Permits Permit Sub-type(s): Heating Systems DETAILS: Approved per resolution#: Separate permits required: NOTICES/REMARKS: TENNIS COURTS HEATERS&FANS FEE SUMMARY: Permit Fee: $ 133.75 Valuation: $ 10,700.00 State Surcharge Fee: $ 5.35 Misc. Fee: $ 1.50 TOTAL FEE: $ 140.60 APPLICANT: DITTER INC&DITTER PROPERTIES OWNER: WOODHILL COUNTRY CLUB 820 TOWER DR 200 WOODHILL RD HAMEL,MN 55340 WAYZATA MN 55391 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. cs APPLICANT PERMITEE SIGNATURE IS$IJED BY SIGNATURE -- Copies: City,Applicant,Assessor,Finance Page 1 PD (9-NC-7 CITY OF ORONO APPLICATION FOR MECHAN CAL PERMIT Box 66 (2750 Kelley Parkway) Crystal Bay, MN 55323 v c 1 2000 GENERAL INFORMATION CI FY Ur UHONO 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within 2 working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. Data shall be presented on form provided. Identification of and specifications for water heating equipment shall also be provided. 4. When any new construction or remodeling is involved, a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. 7. House Heating Test Record must be submitted before final. Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. Please check one: New Addition Repair Replace Reside ti C.u i ercial JOB SITE: any ' • Zip: 55�d11 Owner's Name: l,ijBg jy, 1 d yfty/ e) Telephone Number: i{- --_r;�3 j i Mailing Address: ped B9 1 .4 City: Zip: 5S _r Contractor's Name: £2` P ys, * y1G , Telephone Number: „ – ,-- - 3-g Mailing Address: ) - a1g t 0 y►,. City: 1)-4fie) Zip: .3 SYSTEM DESCRIPTION HEATING SYSTEMS / N Quantity: (p - ,1//f011/ja— Make: L/yl. e_ Model: A4/A .5-4A4/A .5-44-)A1Wei,'A4/A .5-44-)A1 / _%i. Fuel: Ale ' ' Flue Size: Input BTUs: 3 O Output BTUs: CFM: 17 .50 COOLING SYSTEMS Quantity: Make: Model: Tons: H. Power • WOOD BURNING EQUIPMENT Wood stove with flue Wood combination or add-on Factory fireplace with flue Factory Fireplace (s) Freestanding Masonry Wood Stove (s) Franklin, other Brand Name Model No. Mfgr's Min., Clearances, side , rear , min. flue dia. VENTILATION No. Kitchen Exhaust ducted recirculating .3240 cfm e No. Bath Exhaust (must be ducted outside) cfm No. Other Fans: Locations cfm FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL) Installation Removal Fuel oil: gallons underground inside outside LP Gas: gallons Other Gas opening PERMIT FEE CALCULATION 1. 1.25% of Contract Price* or Minimum Fee ($35.00) ) ?.B x .0125 $ (contract price) 2. State Surcharge. ** Add the State Building Code Division Surcharge to each permit. f g1'1�0 x .0005 $ 7' or $.50, whichever is greater (contract price) 3. Postage and Handling (Only mail-in applications) $ 1.50 4. TOTAL PERMIT FEE (Add lines 1-3 above) $ j 4 f) 1d9 * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials, labor, profit, and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor, or installation are furnished by the owner, tenant or any other party the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. ** The STATE SURCHARGE is .0005 of the contract price under $1,000,000 or $.50 - whichever is greater. For valuations over $1,000,000 call the Department of Inspectional Services for the price. The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the Minnesota State Building Code, and certifies that all statements made on this application are complete, true and correct. ,� Applicant's Signature: 7I, -4b— Date: g_lezt.3172_ Approved By: �� (QA--- Date: DATE TIME CITY OF ORONO CALLED IN `r-iy -C`O ?.' . a r+-.. INSPECTION NOTICE SCHEDULED C-4.' if-5 (C' `C)''r•V T1'1 PERMIT NO. POO-9L/O COMPLETED 4?''-'5'-rte /c ,e6 ADDRESS 2 cc' L.,L`C. ,Dh1 I I e.-t / LLC 2c_t1C&. OWNER lA 'CC hl II C'i-i_ ) (ilAb CONTR. DI -4 + e i 1-171-1c TELEPHONE NO. LI--1 & q c, c---A DESCRIPTION oil) 'r Tom``�t c Yl -- .c. L_i v W 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS h Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS • 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP st 111 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Q OWNER/CONTRACTOR TO MEET YOU: YES NO o COMMENTS: cca ; f7:72..._ i___e... j____ --j0 cc 0 4- IL CC Q cnW W cc j CI aj ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE CC [1 CORRECT WORK i£PROCEED IT ISSUE CERTIFICATE OF OCCUPANCY W O IT CORRECT WORK,CALL FOR REINSPECTION TEMPORARY �O BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. PPHOTO TAKEN INSPECTOR WILL RETURN r CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. 249-4600 Owner/Contr ctor on site: Inspector. / -6-C2LOS White Copy/Inspector's File Canary Copy/Site Notice �,( � // �-/7 (ter COUI4 "" r k DATE TIME CI Y OF ORONO / / CALLED IN /-_, `4 "Id /217'' INSPECTION NOTI E SCHEDULED -- APC) PERMIT NO. P� 0 COMPLETED �C ADDRESS 200 Wahl // Rd OWNER CONTR. pt/to Fr(i2 i `'� TELEPHONE NO. ` 6 3 - LI-7( - 9550 DESCRIPTION l'��-, 742-c iicz., ,----LL-C GL ___ LU 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING ci ci 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS CO Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS • 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP cL 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO a COMMENTS: cc W Q.. cc 0 a cc 0 W CC Q W Z W CC d W� /Q}`WORK SATISFACTORY:PROCEED ,F PROJECTCOMPLETE W ❑CORRECT WORK&PROCEED I-. ISSUE CERTIFICATE OF OCCUPANCY • ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY ✓ BEFORE COVERING PERMANENT ❑ CORRECT UNSAFE CONDITION WITHIN HOURS. ' PHOTO TAKEN INSPECTOR WILL RETURN CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. 249-4600 Owner/idtor on sit,- Inspect �*�C/ 4 2 White Copy/Inspector's File Canary Copy/Site Notice