HomeMy WebLinkAbout06-08-1987 - Septic system, 2nd proposal S-P TESTING, INC.
951 KATYDID LANE
ST. MICHAEL, MN 55376
497-3566
STEVE SHIRMERS
June 8 , 1987
John McDowell
Lot 4, Block 1
Woodhill
Orono, Henn. Co. , MN.
This system is designed for a Type 1, five bedroom home and in accordance
with the Minnesota Pollution Control Agency standards WPC 40 and local
ordinances.
The soils on this site are typical of SCS soils mapped - HbC - Hayden loam.
A seasonally high water table was located at 56" to 64" , (mottling) . The
bottom of each trench must be located at least 3 ' above the seasonally high
water table.
The soils at a depth of 24" have a percolation rate averaging 24.0 min/inch
and are adequate for a standard treatment system.
A pumping chamber will need to be installed to lift the effluen to the
treatment area.
The power supply and switches must be located outside the manhole and pump-
ing chamber in a weather proof enclosure. A warning device must be in-
stalled with a light and sound device, this is in case of a pump failure.
(Mercury floats are a good method) . The supply line pipe must have back
drainage to the pumping chamber.
All neighboring wells are located more than 100 ' away from the proposed
treatment area.
Keep all heavy equipment off of the proposed treatment area before and after
construction as much as possible. The treatment area should be marked off
before construction.
With proper installation and maintenance, this system should have no prob-
lem in treating septic effluent effectively.
It is recommended that the septic tanks be pumped every 2 years.
Steven B. Schirmers
Soil and Percolation Tests
SBS/ds Septic System Design
L-13
CERTIFICATION # 00627 Logs of Soil Borings
Location or Project Lot 4 , Block 1, Woodhill
Borings made by S-P Testing, Inc. Steve Schirmers Date 6-2-87
Clas'sific'tion System: AASHO ; USDA-SCS X ; Unified ; Other
Auger used (check two) : Hand X , or Power , Flight , or Bucket X
Depth, Boring number 1 Depth, Boring number 2
in in
feet Surface elevation 984. 6 feet Surface elevation 983.2
0 - 0 -
Topsoil dark gray loam Topsoil dark gray loam
0 - 8"
0 - 10"
1 - Gray 10" - 1 ' 4" brown loam 1 - Gray 8" - 1 ' 2" brown loam
Yellowish brown loam
Yellowish brown loam 1 ' 2" - 118'
to clay loam
2 - 1 ' 4" - 2 ' 4" 2 - Yellowish brown clay loam
1 ' 8" - 2 ' 8"
3 Yellowish brown loam 3
2 ' 4" - 3 ' 10" Yellowish brown loam
4 - 4 -
Yellowishbrown sandy
loam
5 ' -mottling 2 ' 8" - 5 ' -mottling
5 - 3 ' 10" - 5 ' 4" 5 -
HIT ROCK
6 - 6 -
Olive brown loam
7 - 7 -
5 ' - 8 '
8 - 8 -
End of boring at 5 ' 4" feet. End of boring at 8 feet.
Standing water table: Standing water table:
present at feet of depth, present at feet of depth,
hours after boring. hours after boring.
Not present in hole X Not present in hole X
Mottled soil : ' Mottled soil :
5 '
Observed at - feet of depth. Observed at 5 feet of depth.
Not present in hole Not present in hole
Comments : Comments :
L-13
CERTIFICATION # 00627 Logs of Soil Borings
Location or Project Lot 4, Block 1, Woodhill
Borings made by S-P Testing, Inc. Steve Schirmers Date 6-2-87
Classifiction System: AASHO ; USDA-SCS X ; Unified ; Other
Auger used (check two) : Hand X , or Power , Flight , or Bucket X
Depth, Boring number 3 Depth, Boring number 4
in in
feet Surface elevation 981. 1 feet Surface elevation 98.2 .5
0 - - 0 -
Topsoil dark gray loam
0 - 10"
1 - Gray10" - 1 ' 4" browwyoam 1
au 1 ' 4" - 1 ' 8" Iooamn
Yellowish brown clay loam2 _ SAME AS BORING #2
2 1 ' 8" - 2 ' 4"
3 - 3 -
Yellowish brown loam
4 - 4 •
-
2 ' 4" - 4 ' 8"-mottlin.
5 - 5 -
Olive brown loam
6 - 6 - .6' 2"-mottling
7 - 7 -
8 - 4 ' 8" 8 ' 8 -
End of boring at 8 feet. End of boring at 8 feet.
Standing water table: Standing water table:
present at feet of depth, present at feet of depth,
hours .after boring. hours after boring.
Not present in hole X Not present in hole X
Mottled soil : Mottled soil :
Observed at 4 ' 8"feet of depth. Observed at 5 ' 2" feet of depth.
Not present in hole Not present in hole
Comments : Comments :
•
L-13
CERTIFICATION # 00627 Logs of Soil Borings •
Location or Project Lot 4 . Block 1. Woodhill
Borings made by S-P Testing, Inc . Steve Schirmers Date 6-2-87
Clastifiction System: AASHO ; USDA-SCS X ; Unified ; Other
Auger ht used (check two) : Hand X , or Power , Flight g. or Bucket X
Depth, Boring number 5 Depth, Boring number 6
in in
feet Surface elevation 981.0 1feet Surface elevation 983 :2
0 - 0 -
Topsoil dark gray loam Topsoil dark gray loam
0 - 10" 0 - 10"
1 - 1 - Gray ,; brown loam
Gray brown loam 10" - 1 , 4
10" - 1-1/2 ' 1 Yellowish brown clayloam
Yellowish brown clay loam
2 1-1/2 ' - 2 ' 2" . 2 - 1 ' 4" - 2 ' 2"
7. 3 Yellowish brown loam
Yellowish brown loam
4 - 4 - 2 ' 2" - 4 ' 2"
etll inneish4 ' 2" - 4-1/2 ' sannynloam
• 2 ' 2" - 4 ' 10"-mottling ) Yellowish brown loam to
5 t2 . ° '10" - 5 ' 4" si y Y.bam 5
5 ' 4"-mottling sandy loam
4-1/2 ' - 5-1/2 '
6 - 6 -
• Olive brown loam Olive brown loam
7 - 7. -
8 - 5 ' 4" - 8 ' 8 - 5-1/2 ' - 8 '
End of boring at 8 feet. End of boring at 8 feet.
Standing water table : Standing water table:
present at feet of depth, present at feet of depth,
hours 'after boring . • hours after boring.
Not present in hole •X Not present in hole X
Mottled soil : • Mottled soil :
Observed at 4 ' 10"
feet of depth. Observed at 5 ' 4" feet of depth.
Not present in hole Not present in hole •
Comments : Comments :
w '
PERCOLATION TEST DATA SHEET
Steven B. Schirmers 6-3-87 11:46
Percolation test readings made by on _starting at p.m.
Id.Id
Test hole locatio" Lot4 ,B lk. 1,Woodhi 11 _,dole number 1 ,Date hole was prepared 6-2-87
Depth of hole bottom 24 inches, Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 — 10" Topsoil dark gray loam
10" — 16" Gray brown loam
16" — 24" Yellowish brown loam to clay loam
Method of scratching sidewall
Knife
Depth of gravel in bottom of hole 2 inches
1:00p.m.
Date and hour of initial water filling 6-2-87 ,Depth of initial water filling 12 inches above hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
,Maximum water depth above hole bottom during test 6 inches
Time Percolation
Time interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
11: 35 prefill 6
11: 46 12 : 16 4-5/8 6.5 30 min
12 : 27 12: 57 4-7/16 6 .8 "
12: 58 1 : 28 4-1/4 7.1 "
6 . 8
Percolation rate = _minutes per inch.
PERCOLATION TEST DATA SHEET
Steven B. Schirmers 6-3-87 11: 47 : :�
Percolation test readings made by on starting at • ,
Test hole location Lot 4 ,B l k. 1 Woodhi 11 , Hole number 2 ,Date hole was prepared 6-2-87
•
Depth of hole bottom 24 inches,Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 - 8" Topsoil dark gray loam
8" - 14" Gray brown loam
14" - 20" Yellowish brown loam
20" - 24" Yellowish brown clay loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
1:00p.m.
Date and hour of initial water filling
6-2-87
,Depth of initial water filling 12 inches above hole bottom - •
-
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
,Maximum water deth above hole bottom during test 6
; inches
Time Percolation
Time interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
11: 35 prefill 6
11: 47 : 12: 17 4-1/4 7.1 30 min
12: 26 12: 56 4 7.5 II
"
12: 59 1: 29 3-13/16 7.9 II "
Percolation rate = 7.5 minutes per inch.
1 -���- -•
. PERCOLATION TEST DATA SHEET
Steven B. Schirmers 6-3-87 11:48 a.m.
Percolation test readings made by on starting at p.m. ,
(Jas)
Test hole location Lot 4 ,B l k 1. Woodh i 11 ,Hole number 3 , Date hole was prepared 6—2—8 7
24 6
Depth of hole bottom inches,Diameter of hole inches
Soil data from test hole:
Depth,inches Soil texture
0 — 10" Topsoil dark gray loam
10" — 16" Gray brown loam
16" — 20" Gray brown clay loam
20" — 24" Yellowish brown clay loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
1: 00p.m.
Date and hour of initial water filling 6-2-87 ,Depth of initial water filling 12 inches above hole bottom -- -_.
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
,Maximum water depth above hole bottom during test 6 inches ~
Time Percolation
Time interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
11: 35 prefill 6
11:48 12: 18 ir, 3/4 40.0 30 min
12: 25 12:55 " " " " "
1:00 1: 30 ,,
40
Percolation rate = .0
minutes per inch.
PERCOLATION TEST DATA SIIEET
Percolation test readings made by Steven B. Schirmers on 6-3-87 _starting at 11: 49
Test hole location__LO t 4, B 1 k. 1, Woodhill ,Hole number 4 ,Date hole was prepared 6-2-8 7 •
Depth of hole bottom 24 inches, Diameter of hole 6 ._inches
Soil data from test hole:
Depth, inches Soil texture
0 - 8" Topsoil dark gray loam
8" - 14" Gray brown loam
14" - 20" Yellowish brown loam
20" - 24" Yellowish brown clay loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
1 : 00p.m.
Date and hour of initial water filling
6-2-87
,Depth of initial water filling 12 inches above hole bottom -
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
,Maximum water depth above hole bottom during test 6 inches
Time Percolation
Time interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
Water remaining in test hole
11: 49 12: 19 6 11/16 43.6 30 min
12: 24 12: 54
1:01 1: 31 "
•
•
43 6
Percolation rate =_ . minutes per inch.
•
. PERCOLATION TEST DATA SHEET
Steven B. Schirmers 6-3-87 a.m.
starting at 11:5
Percolation test readings made by on
ra.,o
Test hole location Lot 4,B 1 k. 1, Woodhill ,Hole number 5 , Date hole was prepared 6-2-87
Depth of hole bottom 24 _inches, Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 - 10" Topsoil dark gray loam
10" - 18" Gray brown loam
18" - 24" Yellowish brown clay loam
Method of scratching sidewall Knife
Depth of gravel in bottom of hole 2 inches
Date and hour of initial water filling 6-2-87 D ptOh of initial water filling 12 inches above hole bottom - --
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
,Maximum water depth above hole bottom during test 6 inches
Time Percolation
Time interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
11: 35 prefill 6
11:50 12: 20 1-3/4 17. 2 30 min
12: 23 12 : 53 1-5/8 18.5 "
1:02 1: 32 II „
Percolation rate = 18. 1 minutes per inch.
PERCOLATION TEST DATA SHEET
Percolation test readings made by Steven B. Schirmers on 6-3-87 starting at 11: 51 r
dIEM
Ware) m'
Test hole location Lot 4,B 1 k.1, Woodhill ,Hole number 6 ,Date hole was prepared 6-2-87
•
Depth of hole bottom_ 24 inches, Diameter of hole 6 inches
Soil data from test hole:
Depth, inches Soil texture
0 — 10" • Topsoil dark gray loam
10" — 16" Gray brown loam
16" — 24" Yellowish brown clay loam
Method of scratching sidewall Knife
2
Depth of gravel in bottom of hole inches
1: 00p.m.
Date and hour of initial water filling 6-2-87 ,Depth of initial water filling 12 inches above hole bottom -- `
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic siphon
,Maximum water depth above hole bottom during test 6 inches
Time Percolation
Time interval, Measurement, Drop in water rate, Remarks
minutes inches level,inches minutes per
inch
11: 35 prefill 6
11:51 12: 21 1-1/16 28. 2 30 min
12 :22 12: 52 " " " " "
1 :03 1: 33 "
•
Percolation rate = 2 8 . 2 minutes per inch.
J
O.
. - n
i ' . I 0- w ,• 1c. M
•
Ip0� �t ,t9 N
1.-
(I)0n /
Y N- ►� a
1U
•
s a. nw •
� 0 ;nII) Y iK rte.
(. 1 Ij. .1' '9
\Pi i\ll: cl-g' •
0
'9 e,z a )P
moi'' ; -Di 6 X
\., •11
3
...
C
\ \ / o v, E
Q
v, 0 \ (1.)::\ - \ §-`14�` \ .-- = $ o
cu
'f, 4-..5 c al
5 `:_
\ �- \ d U
10D
yq \ 4
r: C Q. O �` C 6
, \'''
,:116,_ "lig; x" `1',) , .4 ' t \ • - N ':;-:'Z:
I 1.0 ® o
14
-IP • ISlihrikt‘ \\ 1\'...„• IT . ........ti.
6- v, Tr -
r ,1
41.
F E4oe
4 , 3 CI
•
•
3
p3 i' '( j
a
it
• r
I
L.�.� ' .=,
• 4
existing grade
•
.rn �'' G U 2 _:_back fill 6"min.
3 to4n�� lCover of unc\ompocted I •
N .NN
hay or straw covered with ' O 4 pipe dia.
red rosin paper ,
)2_,'rock filter material
rake sidewallls a bottom to I • 1
SET- BACKS remove smearing
. HOUSE System must be: •
Tank II' from property lines TRENCH X- SECTION
'lc. from wells ,
aO from bldgs. (min. of two trenches)
0
a Do. Treatmen' area - fran lakes, 5=61-": 11.4 (max, length 100')
Treatment area ' from property lines 1
MA�uo ES Tx C" _" from wells
• . - A� A
`
`� r'`L 22,from bldgs.
/n from trees ote:Power supply and switches must be in a weather
SOIL BORING ELEVATIONS
I I proof enclosure- outside -pumping chamber
dQminrt- . - �_ - - -- - - - _
—I = 1 , . i ; �' TH.I EL.-2 -ms's' �cAL9c6 .a
.,- -ti' , ,__r� r-', (4
7onk Tank ' -, Grade / %s TH.73 EL.-gs61.1
Drop to Tank \ - - TH"4 EL- •3-
Min. I��to 8� At least 41/2'of undisturbed
Pumping • earth between trenches TH75 EL.-0/4 ) ,o
t max.rto41 • -f1 '1.1 S S\� l_\_.ociJ Chamber DROP BOXES ELEVATION at PROPOSED PUMPING
4"to 6"dia.pipe - CHAMBER-„- (ground elev.)
;.4.9.y.or'L , St-)V3 CAL- 96 d.O
SYSTEM DESIGN -
TYPE-S,5 BEDROOM - Percolation rate a,L ,min./inch (design>i - 14..c min./inch) -T\4 �S m.-n),',., _ •
Treatment area required w/j' of rock filler materiallana'10% =i.atrsq.ft. of trench bottom area needed ÷ trench width = lin.ft.of trench needed , number of drop boxes
•
Number of tanks required_2_ 1st tank 12,-;c;gaL, 2nd ton al. minimums P�-�5 (to be determined by the instol!er}
kl�� Qi,am, ir�v �F1Fm�c�
Clean rock'-74 cu.yds. ( 3/4 to 2 I/2"dia.,includes 2"above pipe) PROPERTY OF SnN�\ tin \Do(A.)
Pumping chamber capacity= 25% of daily sewage flow'of 2,ya gal.=)4Si‘gal.s-Reserve.storage=gtal. Pine boc Kdrainagei gaL= q�� gal. cop. '-O - 1 9)�� 1 / (-Linn\'• 4i
ISo F> ry .n )a so 3g1.4to ZD1-�0
( Reserve storage tt= 5 gal./ bedroom = '�c gal. t pipe bock drainage.. gal./1001in.ft.3"pipe- length of pipe needed app I L C ft. V 30 gal.) r T��" N S-1.-0.1, (`�' '
Pump size JL3 hp w/mercury float pump controls a � 3H' l-ttNo - . .55
S-P TEST/NG /NC
• Note: When constructing bed - , this area should be shaped Note: Distance from treatment area to neighboring wells— Designed By: 7.,•./7./,_,----(2 - . t..)-1---,----
to divert run-off from entering treatment area. 1_,,?. -11,-- - - N-J 1('n
_
Date .//21/. 2 , PH. 612-497-3566