Loading...
HomeMy WebLinkAbout12-22-1987 Re: prop. purch. of Lot 4, Block 1 Lucy C. Mitchell 1745 N. Willow Drive Long Lake, MN 55356 December 22 , 1987 t 1 � DEC 1 81987 L Ms. Jeanne A. Mabusth \ � Mr. Michael Gaffron City of Orono P. O. Box 66 Crystal Bay, MN 55323 Re: Proposed Purchase of Lot 4, Block 1, WOODHILL RIDGE Dear Jeanne and Mike: As you know, my husband Bob and I have been looking at buying Lot 4, Block 1, WOODHILL RIDGE from John McDowell's MSM Associates. There is a contingency in our purchase agreement that allows us to get your approval as to the sites before we are obligated to purchase. First, is it correct that the S-P Testing, Inc. drainfield design dated May 22 , 1987 showing the proposed treatment area, the future expansion area, and a proposed house location is satisfactory to you even though the final plat of Lot 4, Block 1, 111," t WOODHILL RIDGE changed the easterly lot lines to some extent? Second, we enclose a second S-P Testing, Inc. proposed treatment area, future expansion area, and proposed house site dated December 14, 1987 and would ask if this is agreeable to Orono for drainfield purposes? Third, we have had Tom Bergquist at Sathre-Bergquist Surveyors put together a site plan which shows the proposed treatment area and future expansion area as conforms to the S-P Testing, Inc. diagram of 12/15/87, a house and attached garage, and a driveway and parking area all on the topographic survey of the site prepared by Sathre-Bergquist. We would ask that you review the site plan and let us know if there are any problems raised by it. As you can see, Tom Bergquist has located the setback lines in relation to the house, the garage, the driveway, and the drainfield sites. Since our contingency agreement only runs through December 24, 1987, I would appreciate your giving me your response to these inquiries as soon as possible. Thank you. Very truly yours, Lucy C. Mitchell Enc. S-P TESTING, INC. .951 KATYDID LANE • ST. MICHAEL, MN 55376 497.3566 STEVE SHIRMERS December 14, 1987 John McDowell Lot 4 , Block 1 Woodhill Orono, Henn. Co. , MN This system is designed for a Type 1, five bedroom home and in accordance with the Minnesota. Pollution Control Agency standards WPC 40 and local ordinances . The soils on this site are typical of SCS soils mapped - HbC - Hayden loam. A seasonally high water table was located at 28", 38" , 40" , 42" , & 58" , (mottling) . Due to the seasonally high water table, a pressurized mound system will need to be installed. The bottom of the rock bed must be lo- cated at least 3 ' above the seasonally high water table. The soils at a depth of 18" have a percolation rate averaging 19.3 min/inch and are adequate for treating septic effluent. A pumping chamber will need to be installed to lift the effluent to the treatment area. The manifold and supply line pipe must have back drainage to the pumping chamber. The distribution pipes shall have their ends capped. Be sure the rock and sand fill material are clean. The sod layer below the entire mounded area must be turned over, just break up the sod, be sure not to over work. The power supply and switches must be located outside the manhole and pumping chamber in a weather proof enclosure. A warning device must be installed with a light and sound device, this is in case of a pump failure. (Mercury floats are a good method) . All neighboring wells are : located more than 100' away from the proposed treatment area. Keep all heavy equipment off of the proposed treatment area before and after construction as much as possible. The treatment area should be marked off before construction. • With proper installation and maintenance, this system should have no problem in treating septic effluent effectively. • It is recommended that the septic tanks be pumped every 2 years . • �G- elc c---- Soil and Percolation Tests Steven B. Schirmers Septic System Design SBS/ds . ov • 1 : -.- r e. . / o • ;// • '' o 2 Ai U -0j m; R, ,-,1 ) 111tt y • 1 • I pp t ,�' ... d {t � — 11 -i �— -' •1 � ' v e 1 --Yr- /.4 ` 14. `ems`'' n K' vO- - .. X00, l "-tVC" � , ;*. , x, 11 iii 1 —''�«•1 � 1 –/ —if* 1 O v No / ;-1 .s 1 \ ' L i �` Z 0 ‘' % LI • °I; \ 1 If‘ I 9-- (!). ft3 .3..7.t) . L... xT1.4\PeL_____01,4,) `.�' og ao r.. (14_ 1 v+ �� 1. ... .< 1 C7 O O ,p / 11' A c Q Vit r ..4.---5: rg o r ". a. 9. .. N a 3 lit I 0 0- O6,, 1 • N • . • • . n nib i CCM (T.'. AO. ",r • n 4 • b 1 i en 4 m • p A LLLL���LLL���� pp rr__ t, u, A •13 \NH:I 4, (-1 p a }`� p e n 2 X y A y ' N ,;1 f." xo A y b 'Mi ' t0 Pt 1,.,o w -Ju 1 h ILIO n \� , a 2 01cn M 1 t • • I - • NNN.NNNN'. _ 3.5 •-•- I'of rc7) 4.1 SET- BACKS l< t 1 . if io' as • - - - - - . HOUSE . . . • System must be.•• - Tonk �52� from property lines• X- S E�-(>Q tz,�Sl'4L- v-)is . - - - _ - - - - - W P‘ y.- -_cn-.T • ' •. from wells . 2. from bldgs. -14,4 . ..- • •. -Treatment oreo =1 from lakes, streams _ . Treotment area from property lines - - NOTE Power supply and switches must be located in a MA>JNoLLs " weather proof enclosure outside the pumping chamber and manhole rhiAx.134LCF;tL ,from wells • �'f rom bldgs. 1- -, .• from trees SOIL BORING ELEVATIONS I r _ y-• 1• IMI 3�min. • -I- THA'iEL,-2. ' '-)fl{ .- q' -, `� • "da.supply grade >c %TH`tEL.39_.1 7-- Tank Tonk PRESSURE DISTRIBUTION MOUND SYSTEM TH"REL-1 ' Drop to Tonk. I ; THI'►0EL-35i1.3 Min. I"to B' IL Pumping TH71 t EL.-3.1,3 MO X.I"10 4' ' �� ? 'Ilk 1-1V-C, `._Oce) Chamber ELEVATION of PROPOSED PUMPING .1 (to 6"dia.pipe CHAMBER- 92.n wo Yc,'S4 , 4c1.�5E-. )0o•0 SYSTEM DESIGN -MOUND I. TYPE-. , BEDROOM , Average percolation rate I3..11-min./inch (design.83 sq.ft treatment oreo per got. of daily sewage flow) ...). -c) gol./day x.83sq.ft/gal- L-aZ L. sq.ft.of treatment area +10%=1•1`141-1 sq.ft. (= 10ft.width=..42.5(1._ft.length of bed area+side slope run.9.-to I x. .L height= _9.1-ftx.L.1_ft lawn.area needed) Clean rock needed- (o`*'`1 sq.ft.treatment oreo x 1•o� depth of rock:')I`r cu.ft=27=a') a.yds(3/4'10 21/2'dia. ,includes 2"of rock above pipe) I: Clean sand fill below rock needed ac,a cu.yds. opprox. , sondy loom bock fill So cu.ydsapprox., topsoil 6 un cu.yd. Avg• 513,rL.o o�N 1; - l' Number of tanks required 3—, Ist ionic/ovogol. ,2nd tank 4,L, ' gal.mirwn ns ?Lt.).- FL:•11PS0v c•-N 14•,1cC V- • ..?• .....-t,\ E,_ • i Pumpng chamber copocity- 25% of doily sewage flow of n11.2731 =i'-'51 gar•+reserve storage 0)=t/bedroom= 7n got.+pipe bock dronoge— i of-1 gal./1001in.ft.of_2_11dio. supply pipe, lin.ft.needed ISO , �_gol i manifold 14/gal./1001inft of a "dio.pipe,ItIft needed ') PROPERTY OF: To 1-4 N M L40�t �•. , 07 .gal. - -r Li -?.,1_0(...r,. 1 totol capacity needed 9 G-''? gal.(plus area for pump) u F +,,,r._1,3.,cE) c ►-c..,‘0.. (.vD0014 t.0 Deo t•• D 111 h Distribution pipe I r'a`dio. , 19I - lin.ft, 11L �dia. perforations - "apart t} Gv • �'�' Y1 Pump size l I z hP• (pumpoble cxtpocity d t 7 gal. 4,yctes/day) ' 5 - 4 1 N o p Sz E SS 9 :,,4-t.1,--,..---$-P TESTING / Note : When constructing bed '7 , this oreo should be shaped Note: D,stonce from treatment oreo to neighboring wells— � I �'� `-' to divert run-off from entering treotment oreo. E►?"te->z- '"1" ArLI I Dc) r Designed y _ Dote.,g/,s/yam , PH. 612-497-3566