Loading...
HomeMy WebLinkAbout02-04-2002 - repair to overhang ° Ci ofOrono t., 2750 Kelley Parkway P.O. Box 66 Crystal Bay, MN 55323 (952) 249-4600 Fax: (952) 249-4616 FAX TRANSMISSION COVER SHEET Date: �'�l � 2— To: To: A' 7 , G✓e l L-e c Ye y Fax: 27 Re: OV-eyJ'jc.u,t3 e411 J N 2 C?✓5 7C ft&)) Sender: /'''/Gc-r/C dcw� Jl/1 C� (( s YOU SHOULD RECEIVE g PAGE(S), INCLUDING THIS COVER SHEET. IF YOU DO NOT RECEIVE ALL THE PAGES, PLEASE CALL (952) 249-4600. John Dahlmeier 612-472-4761 p. 1 FAX TRANSMITTAL SHEET JHD 1.H. Dahlmeier Engineering Inc. 2434 Commerce Boulevard Mound, Minnesota 55364 Phone (952) - 472 -4746 Fax (952) - 472-4761 TO: ToNt o5Lc.v(` OF: FAX#: re) -`f U 3 828 TELE. #: DATE: 12'7I a\ TIME: FROM: G(-19 I�t PROD. #: 12--7 ZSUBJECT: OVe.k 5.- e REMARKS: °•c_ i -{L,.� \-44le,r ''-?(?(') - ertr cL . 5711)/ 5 '5z - Yps - Lizr 1-/6/6 INCLUDING COVER SHEET SHEETS John Dahlmeier 612-472-4761 p. 2 Ic-s-�■ )FrIrj r:._sem J.H. Dahlmeier Engineering Inc. August 27, 2001 John Horoshak 1377 North Arm Drive Mound, MN 55364 Attn: John Horoshak Re: Residence Under Construction 880 Windjammer Lane Orono, MN Commission No. 1272 Gentlemen: The purpose of this letter is to report the findings of a structural engineering review of the roof overhang framing for this residence under construction. ASSIGNMENT J. H. Dahlmeier Engineering Inc. has been retained to provide a structural engineering review of the roof overhang framing for the residence under construction located at 880 Windjammer Lane in Orono, MN, as directed by John Horoshak. DESCRIPTION The structure is a single-family dwelling. BACKGROUND The roof overhang at the rear of the house was not built in accordance with the residence's structural drawings. The homeowner wishes to have an independent engineering review of the condition and suggested repair modifications. 2434 Commerce Boulevard • Mound, MN 55364 • (952)472-4746 • FAX(952)472-4761 • E-Mail JHDINC2@cs.com John Dahlmeier 612-472-4761 p. 3 John Horoshak August 27, 2001 OBSERVATIONS AND COMMENTS 1. Craig Oswell of J. H. Dahlmeier Engineering Inc. visited the site for an inspection of the framing on August 27, 2001. The following items were noticed in regards to the overhang framing: a. The overhang was framed with 2x4 studs spaced at 24" O.C. b. The stud overhang cantilevered three feet past the face of the wall. c. The studs were end nailed to the top chord of the truss nearest the wall. The truss was spaced two feet from the face of the wall. d. The studs extend over a truss, which was in line with the wall. The end truss's webs were framed in with 2x4's at 16" O.C. due to the gable condition. STRUCTURAL ANALYSIS 2. A structural engineering analysis determined the following: a. The current overhang framing is not adequate to support the code- required load. b. The current overhang framing will deflect approximately 0.58" at the overhang end under the code-required load. This value is approximately four times the recommended value for this type of condition. CORRECTIVE MEASURES 3. The following corrective measures are required for the overhang framing: a. A 1.75" wide x 3.5" high LVL should be placed on each side of each 2x4 overhang stud. The studs and LVLs should be nailed together at 12" O.C. b. The stud/LVLs should be attached to the truss top chord at their end, as well as to the truss at the wall, with a single Simpson H4 anchor. PROFESSIONAL OPINION 4. It is my professional engineering opinion that the overhang framing will be structurally adequate once the above corrective measures have been implemented. GENERAL 5. The observations and opinions expressed in this report were based on my professional engineering judgment and professional practice, as well as the visual inspection. John Dahlmeier 612-472-4761 p. 4 John Horoshak August 27, 2001 If you have any questions, please contact me. Sincerely, J. H. DAHLMEIER ENGINEERING, INC. John H. Dahlmeier, P.E. JHD: clo cc: Lyle Oman / Building Official City of Orono Thomas Stokes / Brenshell Homes, Inc. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Min 4 esota. (7))7AL,(A- John . •ahlme er Date: *7d Minnesota Registration No. 9212 1. 0.4i. 0 A.,,4,,,, - CITY of ORONO ? titi Municipal Offices �t `,! �G Street Address: Mailing Address: `9$ gg04' 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 August 14, 2001 John Horoshak 880 Windjammer Lane Mound, MN 55364 RE: Roof Overhang Dear Mr. Horoshak: This letter is to address the roof overhang problem on you building project at 880 Windjammer Lane in Orono. Due to observations on site by Orono Building Inspector Marc Davis the City is requesting structural information to show the overhangs will support a minimum snow load of 40 lbs per sq. ft. as required by MN State Building Code, Section 1305.4416 Exception 1. (enclosed) this information will be required to be received, reviewed and approved prior to final inspection and occupancy. If you have any questions please feel free to contact me at my office. Sincerely, 4(12(4--- Lyle Oman Building Official Enclosure rd Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us 12. All references to design values for joists, rafters, and those in Header Tables R-402.6a and R-402.6b are deleted and replaced with UBC Tables 23-IV-V-1 and 23-IV-V-2. SA: MS s 16B.59 to 16B.75 HIST: 19 SR 1340; 23 SR 683 1305.4415 UBC APPENDIX CHAPTER 15, REROOFING. Subpart 1. Chapter 15. UBC Appendix Chapter 15 is amended by deleting the first paragraph of section 1515.1, 1515.2.1, and the subheading under the title of Table A-15-A. Subp. 2. Section 1520. UBC Appendix Section 1520 is amended by deleting all but the first sentence. SA: MS s 16B.59 to 16B.75 HIST: 23 SR 683 1305.4416 UBC APPENDIX CHAPTER 16, DIVISION I, SNOW LOAD DESIGN. UBC Appendix Section 1637.1 is amended by adding an exception to read as follows: Exception: The minimum roof snow loads established herein for R-3 and U occupancies are not subject to decrease or increase as specified in this chapter. UBC Appendix Section 1638 is amended by changing the reference in notation Wb, 500 feet, to 200 feet. UBC Appendix Section 1639 is amended to read as follows: The ground snow load, Pg, to be used in the determination of design snow loads for buildings and other structures shall be 57 pounds per square foot in the following counties: Anoka, Carlton, Carver, Chisago, Cook, Dakota, Hennepin, Isanti, Lake, Pine, Ramsey, St. Louis, Scott, and Washington. The ground snow load, Pg, to be used in the determination of design snow loads for buildings and other structures shall be 43 pounds per square foot in all other counties. Exceptions: 1. A minimum roof snow load of 40 pounds per square foot of horizontal projection shall be acceptable for R-3 occupancies in the counties of Anoka, Carlton, Carver, Chisago, Cook, Dakota, Hennepin, Isanti, Lake, Pine, Ramsey, St. Louis, Scott, and Washington. A minimum roof snow load of 30 pounds per square foot of horizontal projection shall be acceptable for R-3 occupancies in all counties. 2. A minimum roof snow load of 30 pounds per square foot of horizontal projection shall be acceptable for detached Group U occupancies in all counties. UBC Appendix Section 1645 is deleted in its entirety. UBC Table A-16-A, Snow Exposure Coefficient (Ce), is deleted and replaced with the following: The snow exposure coefficient (Ce) for all of Minnesota is established as 0.7. UBC Table A-16-B, Values for Occupancy Importance Factor is deleted, and replaced with the following: / DATE TIME CITY OF ORONO CALLED IN DATE TIME INSPECTION NOTIQ�j SCHEDULED �� CITY OF ORONO CALLED IN PERMIT NO. pU 37 Z( CQ L TED .. INSPECTION NOTICE 3���COMPLETED �G//�� PERMIT NO. COMPLETED "2 3°-6( ..?(C--- ADDRESS (�Q v ( ✓tC( an'10-t. Q ( `} ADDRESS D (2,40*107 . �/1 )��t trr�2l— OWNER �\ 1�Y Y /(_ CONTR. (/ OWNER GV S�CA1�-CONTR. �Q i, TELEPHONE NO. 95 - `- id- --1/j TELEPHONE NO. DESCRIPTION t • ��C M., 3: DESCRIPTION 0U ,Acc,1'1 ,. r Cc(*. 4. 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING W 01 • ING 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS �o11 MECHANICAL RI 18 EXCAV/GRADING/FILLING ti Q 13 MECHANICAL FINAL 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL t7 19 LAKE REMOVALWETLANDS 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q �SULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE 04 WALL BD. 12 WATER HOOK-UP Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 17 SITE INSPECTION 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 1..... 07 DEMO-SITE cK v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP ~ 27 SEPTIC MAINT. 21 COMPLAINT J 07 DEMO-FINAL 15 SEPTIC INSTALL. i22 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL Q 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL 10 PLUMBING FINAL 'L OWNER/CONTRACTOR TO MEET YOU:_YES_NO 36 FOUNDATION/REMOVAL cz OWNER/CONTRACTOR TO MEET YOU: YES_NO cc COMMENTS: MENTS: ga �, 3.--/;/ cl,(/' / r 11/ (ori' -el4 CSS -P /14€1214'(/) t7)---) O 7,e,vick, /C� }� �/� CCrCjr�C O l� g� CC citoup W Z W CC Elcc WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE d ORRECT WORK&PROCEED CI ISSUE CERTIFICATE OF OCCUPANCY ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ( ❑ CORRECT WORK&PROCEED 0 CORRECT WORK CALL FOR REINSPECTION TEMPORARY 4.1 C1 ISSUE CERTIFICATE OF OCCUPANCY V BEFORE COVERING PERMANENT 0 CICORRECT WORK,CALL FOR REINSPECTION ❑CORRECT UNSAFE CONDITION WITHIN HOURS. CI PHOTO TAKEN BEFORE COVERING TEMPORARY INSPECTOR WILL RETURN ElCORRECT UNSAFE CONDITION WITHIN HOURS. PERMANENT 0 STOP ORDER POSTED.CALL INSPECTOR CI ISSUED INSPECTOR WILL RETURN CI PHOTO TAKEN CIINSPECTION REQUIRED.CALL TO ARRANGE ACCESS. CI STOP ORDER POSTED.CALL INSPECTOR El CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Call for the next inspection 24 hours in advance.473-7357 Owner/Contract r on site: ili �n--e7_ e--: is Owner/Contrarnron site: