HomeMy WebLinkAboutRusty Olson's - Soil/Percolation testing - Oct. 31, 2016 Joseph Olson D.B.A.
Rusty Olson's--Soil and Percolation Testing
Joseph J. Olson--MPCA License#810
11481 Riverview Rd. NE, Hanover, MN 55341
(763)498-8779 Fax (763) 498-8290
October 31,2016
NOR-SON
500 Willow Drive S
Orono,Hennepin County
This on-site Sewage Treatment System is partially designed for a Type 1 five-bedroom home and a I
bedroom guest house in accordance with the Minnesota Pollution Control Agency Chapter 7080 and local
ordinances.
Once the house size, location, lowest floor elevation and septic primary and future sites are chosen this
design can be completed.
The periodically saturated soils were located at 12-16 inches(mottled soil). Due to the periodically
saturated soils,a pressurized mound system with 6 inches of rock will need to be installed to treat the septic
effluent. The bottom of the treatment area must be located at least 3' above the saturated soils.This system
is designed with 6 inches of rock
All neighboring wells are greater than 100' from proposed treatment areas.
The soils at a depth of 12"have a percolation rate averaging 10 MPI.
A 2250 combination septic tank needs to be installed for the house and a 1500 gallon combination for the
guest house.The guest house is to be built first.The 1500 gallon combination tank should be used as a
holding tank until the house is built.
All new tanks need to be insulated if there is less than two feet of cover over the top of the tanks.Clean
outs must be installed on the end of the laterals for maintenance.
A 1300 gallon pumping chamber will need to be installed to lift the effluent to the treatment area.The
power supply and switches must be located outside the manhole and pumping chamber in a weatherproof
enclosure. A warning device must be installed with light and sound devices;this is in case of a pump
failure.A flow measurement device must be installed. Including but not limited to a water meter,event
counter,running time clocks or electronically controlled dosing.
Nothing other than gray water,flaundrv.showers etc)Human water and toilet tissue should be
disposed of into the septic tanks Garbage disposals are not recommended Additives must not be
used: they may cause harmful damage to your septic system It is recommended that you pump the
tank every year for I septic tank,every two years for two septic tanks
Sincerely,
Joseph J. Olson
w
i
o
/30.2 / oL9r
cn 96ZY
o3901do d
s v J o
I
Ch
3 INS
3snOH 3anl :j
t '
x �
w i I
_. 5 _ -_ _ �� --9642___
-9{O—_ O
4l�il�
/v.-soil
Monw.
SU Qwftr fw Me" tc 44ia to
JUAM WA AMAPA c can OCIVA
�'ts-S G-�.cs 13cr� .
l.4ts SOIL BORING ELEVAIMU
MOUND SYSTF m UES16W T1141 lit-. jjI.7
fYPN_L -.4. t3_droorn,Average j'rcoiation rate 4 �oTR#2 EL..-isl9
9614)_gal/day _75i)--�-ft of trr�at,nenl 4rea 7SL sy��rust b�: THA E1..-29-k
_ Il1U ft. width.- 7f it. length cif hed area ' &rt *5 EL.- 11
-- - tS,..�:'�011i Pto�sti7r tine �•
Side slope rua Mrd.«q fivm wdu .16 E..«�S�(. 3
L to i x 3, „eight= ys .X Ott t.au�n aria, t
Clear rock r+nededp!us 209'fl 9!r—cu-yds. r�faNliiOilt IiliQ2t ��f Gi>E1 tit4'!te. ...f$t36;1'S
Coarse crashed san3.53 cu.Yds. average sand depth 2,gfr
�'t�ait metr#+iron,� (MM vMperty Clot.
Sandy foam Cu_y . 1epsaii&" R1 c!�. �U 6(MI welts
yd5.plus SO% CU.Yds-
C30- b idctrrr
Mumbo of tanks? I't tank,;�SaDgals.,X"tank_
._.gals..Pumpdtarnber Capacityljogais_
ISJJI.at �vrna v�_r,at1 rot' fUt. f 14o.ftc
Rah./100 lineal feet of_ dia- Supply pipe,linea#feet needed -- I y; ; Soo ��!�� 5 `
Uis;rihutionr ---- - � _���=....1N•o.��.lrY
P pe-o -v..+�- o�_Ig lineal feet, dia-Perforations 3(, -apart
gloat set at,---- _—gals_, Limeser
P day Pump curve__-- /ruin------¢eet head pressure.
Daft.'!O !tom Ph- 163.49"779
2011 purple code Mound Design
www.SepticResource.com (vers 15.2)
Property Owner: NOR-SON Date: 10/30/2016
Site Address: 500 Willow Drive S PID: 0311723320017
Comments: 5 Bedroom house and one bedroom guest house
instructions: = = enter data = adjust if desired = = computer calculated - DO NOT CHANGE!
Ibedroom Type Residential System
,, 900 GPD design flow
31 Yes Garbage disposal or pumped to septic 50% larger tank with multiple comp/tanks
4) 3000 Gal Septic tank (code minimum) 3000 Gal Septic tank (design size / LUG req'd)
Tank options: none
1.2 GPD/ft2 mound sand loading rate contour loading rate of 12 req's a min 75 ft. long rockbed
c,) 10.0 ft rockbed width 75.0 ft rockbed length
3.0 ft lateral spacing 3.0 ft perforation spacing (maximum of 3 for both)
end feed manifold connection
laterals 73.0 feet long 25.0 perfs / lateral 75 perfs total
(1/2 a perf means the first perf starts at the middle feed manifold)
Q 7/32 inch perfs at feet residual head gives 0.56 gpm flow rate per perforation
for this perf size Et spacing, Et pipe size on line 12, max perfs/lateral = 30 line#8 must be less > G
lo) 4.0 doses per day ( 4 minimum)
1 1 225 gallons per dose (treatment volume)
2.00 5x
12) 2.00 inch diameter laterals must be used to meet 'Ax pipe volume" requirement
2.00 3x
feet of 2.0 inch supply tine leads to ##### gallons of drainback volume
(Tip: "top feed" manifold to control the drainback)
141 gallons TOTAL pump out volume (treatment + drainback)
1s) feet vertical lift from pump to mound laterals, leads to a:
16) 42 GPM @ ##### feet of head, Pump requirement (note: >50gpm may require an extra 3-6'of head)
17) 900 gal Dose tank (code minimum) 900 gal Dose tank (design size / LUG req'd) at gpi
leads to a
18) ###### inch swing on Demand float, or timed dosing ofOhrs
min ON (confirm pump rate with drawdown
(this delivers Average flow, =70%of Peak design flow) OFF test and adjust as necessary)
19) 12 inches from bottom of tank to"Pump OFF" float
inches from bottom of tank to"Pump ON" float, or 12 inches to "Timer ON"float if time dosed
21) ###### inches from bottom of tank to"Hi Level"float, or ##### inches to "Hi Level"float if time dosed
22) ###### gallons reserve capacity (after High Level Alarm is activated)
23) 0.45 gpd/ft` Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum)
(this must match the soil boring log) desired mound ratio 1 2.7
,4) percent site slope (0-20% range) �(%downslope site slope, if different than upslope)
,„ 16 inches, or 1.3 ft. to Redox or other limiting condition (need at least 12" to be a Type 1)
Treatment zone contains=0 inches of 0%soil credit, and =inches of 50% soil credit. Giving a:
26, 20 inch, or 1.7 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!!
27) F27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:)
28) 0.0 ft. upslope and sideslope
17.0 ft. Downslope
Individual slope ratios give BERM widths (topsoil beyond rockbed) of:
4:1 upslope ratio 11 ft. upstope berm
3" 4:1 sideslope 17 ft. sideslope berms
3i) 4:1 downslope 24 ft. downslope berm
Overall Dimensions: 10.0 ft, wide by 75.0 ft. long Rock bed
45 ft. wide by 1 109 ft. long Mound footprint
4" inspection pipe
18" cover on top
U sto a berm 11 Downslope berm 24
12" cover on sides
(6"loamy cap&6"topsoil)
1.7 Clean sand lift
_ _ 1.3 Depth to Li �''
Absorption Width 27.0
Note:
For 0 to 1% slopes, Absorption Width is measured from the Bedequally in both directions.
For slopes >1%, Absorption Wrdthis measured downhill from the upslope edge of the Bed.
33. Rock Bed:
10.0 ft. by 75.0 ft. by ®inches under pipe, plus 20% gives 25 yd'or-1.4= 35 ton
34) Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired)
41.5 up + 117.9 downslope + 16.8 ends + 56.0 under rock = F-2-79-]yd'or"1.4= 390 Ton
plus 20%
3 Loamy Cap:
41 ft. by 105 ft. 6"deep, plus 20%gives 96 yd'or"1.4= 134 ton
30) Topsoil:
45 ft. by109 ft. 6" deep, plus 20%gives 109 yd'or"1.4= 153 ton
I hereby certify that I have completed this work in accordance with at(applicable ordinances, rules and taws.
Rusty otson's Soil £x Perc 810 10/30/2016
esigner Signature Company License# Date
Installer Summary
3000 gallon Septic tank (minimum) Tank options: none
:)u70 rdrger Ldnrc wnn rnuurNre c.urnN/WIM,
900 gallon Dose tank (minimum) at =gpi
42 GPM @ ##### ft. of head, Pump required
###### inch swing on Demand float which translates to roughly ##### inches of float tether length
if time dosing is required --> ##### minutes ON time It ##### hours OFF time
###### inches from bottom of tank to"pump ON"float, orginches
inches to "timer ON"float
###### inches from bottom of tank to "Hi Level Alarm"or to "Hi level alarm"if time dosed
Oft. of 2.0 inch supply line with end feed manifold connection
(Tip: "top feed" manifold to control drainback)
20 inch, or 1.7 ft. Sand Lift Mound
10.0 ft. wide by 75.0 ft. tong Rock bed
3 laterals 2.00 inch diameter 73.0 ft. tong 3.0 ft. lateral spacing
7/32 inch perfs 3.0 ft. perforation spacing
No Effluent fitter & alarm
3 clean out & valve box assemblies
27.0 ft.Total sand ABSORPTION width (minimum)
0.0 ft. upstope and sideslope (sand beyond rockbed, minimum)
17.0 ft. Downslope (sand beyond rockbec, rriimmurr
Specific slope ratios give BERM widths (topsoil beyond rockbed) of:
4:1 upslope ratio 11 ft. upslope berm
4:1 sidestope 17 ft. sideslope berms
4:1 downslope 24 ft. downslope berm
4" inspection pipe
18" cover on top
U slo a berm 11 Downslope berm 2a
12" cover on sides
(6"loamy cap&6"topsoil)
1.7 Clean sand lift
27.0 ..._ _.
Absorption WidthE27-0
Note:
For 0 to 1% slopes, Absorption Width is measured from the Bedequatty in both directions.
For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed.
Rock Bed: 25.0 yd3 or"1.4= 35 ton 6 inches under pipe
Mound Sand: 279 yd3 or"1.4= 390 ton calculation based on 3:1/4:1 slope from top of rockbe,
Loamy Cap: 96 yd3 or*1.4= 134 ton 6" deep
Topsoil: 109 yd3 or*1.4= 153 ton 6"deep
INSPECTOR CHECKLIST - mound
wW willow Unve
WELL setbacks: 20'to pressure tested sewer line (5 psi for 15 min)
50'to everything 100'to dispersal area with shallow well
PROPERTY LINES setback: 10'to everything
Road setback: platted: 10'prop line. Metes 8t bounds: out of road easement, or outer ditch.
LAKE BLUFF setback: 20'for bluff. Lakes: GD_, RD_, NE_. Protected wetland_.
Building setbacks: 10'for everything, 20'for dispersal area.
WATER LINE under pressure sc 10'to bed,tank Ft sewer line. (else sewer line > 12"below)
Sewer line 8 baffle connection (no 90's, Y between 45's, slope min 1" in 8', max 2"in 8')
(no depth req's, clean out every 100', Sch 40 pipe)
El Septic tank and risers (water tight, insulated, proper depth, existing verified by pumping)
Mfg 3000 gallons none
Riser over outlet, riser over inlet or center, and 6"+ inspection pipe over any remaining baffles.
No effluent filter&alarm
Dose tank risers and piping (water tight, insulated, proper depth, drainback)
Mfg 900 gallons
dose pump 42 gpm ######head VERIFY PUMP CURVE ##### min ON ###### hr OFF
D float setting drop ##### inches at gpi "DESIGNED" ##### inches approx float tether length
##### gal dose divided by gpi "INSTALLED"= inches float drop (field corrected
LABEL pump requirements and drawdown on riser or panel
Cam lock reachable from grade - 30" max. J-hook weep hole. Supply line access (no hard 90's)
2.0 inch supply pipe: Sch40, sloped 1/8"+, supported by 4"sch40 sleeve or compacted, and buried 6"+.
splice box / control panel / electrical connections
flow measurement: CT, ETM, time dosed, home water meter
mound absorption area rough up
mound rock dimensions 10.0 X 75.0
Sand lift depth 20 inches. (Jar test : 2"sand leaves < 1/8"silt after 30 min)
El Absorption Sand beyond rock 0.0 upslope 17.0 downslope
Bermed topsoil beyond rockbed 11 upslope 17 sideslope 24 downslope
cover depth of 12-18"+ VERIFY
3 laterals (1-2'from edge of rock)
2.00 inch pipe size (Sch40 pipe ft fittings)
3.0 ft lateral spacing
8 7/32 inch perforations
3.0 ft perforation spacing
Air inlet at end of laterals, and at top feed manifold if necessary. VERIFY
clean outs (no hard 90's)
4"inspection pipe to bottom of rock, anchored VERIFY
Abandon existing system - if necessary �Re-use existing tank certification
monitoring plan and type
well abandonment form - if necessary
System Elevations ;
benchmark . -
r _ _ _ _ SHV'JT
Mound r
(Grade elevations are existing. If a loamy cap
different final grade is desired it should lateral
be shown and described here.)
bottom rock
grade (at upsbpe o«k bed)
SHWT (at upslope rock bed)
1 1 1 1
r r �
Sewer pipe
exiting house Septic Tank Septic Tank (it appli(able) Pump Tank
Grade Grade Grade Grade
Pipe inlet inlet inlet
Tank bottom Tank bottom Tank bottom
Soil Observation Log
%vw".Sept icResource.com vers 12.4
Oi�ner Information
Property Owner/project: NOR-SON Date 10/27/2016
Property Address'PID: 500 Willow Drive S
Soil Survey Information refer to attached soil survey
Parent matl's: Q Till ❑ Outwash ❑ Lacustrine ❑ Alluvium ❑ Organic ❑ Bedrock
landscape position: ❑ Summit LI, Shoulder Q Side slope ❑ Toe slope
soil survey map units: L22C2 slope 7 4% direction-Convex
Soil Log 41
Q Boring ❑ Pit Elevation 95 1.9 Depth to SHWT 16 Inches
Depth(in) Texture fragment% matrix color redox color consistence _rade shape
0-6 1 0r`o i 110 r Loose Loose Single grain
6-16 Clay Loam <35 10yr4/3 FriahlrStromz Block%
16-24 Clay Loam --- 1Oyr5/4 IOv4/8,1-6/1Oy Firm Strong Prismatic
<35 loose loose single grain
35 -50 friable weak granular block)
>50 firm moderate prismatic platy
rigid strong massive
<35 loose loose single grain
35-50 friable weak granular block_N
>50 firm moderate prismatic plate
rigid strong massive
Ccnnments
500 Willow Drive S Soil Log#2
Q Boring ❑ Pit Elevation 951.9 Depth to SHWT 16 Inches
Depth (ill) Texture fragment 0,,o matrix color redox color consistence grade shape
0-4 Iupsuil ;� 10%r4 Loose Loose Single grain
16 Clay Loam IOyr4 4 Friable Strong li ock\
16-24 Clay Loam 10%r_" 4 1 Oy4
500 Willow Drive S Soil Log#4
Q Boring ❑ Pit Elevation 952.8 Depth to SHWT 12
Depth(in) Texture fragment% matrix color redox color consistence grade shape
0-6 Topsoil IOvr3/2 Loose Loose Single grain
6-121 Clay Loam <35 10yr4l3 Friable Strong Blocky
12-24 C laN Loam <35 I 0yr5i4 10x4 8,1-6 l Ov Firm Strono Prismatic
<35 loose loose single grain
35 -50 friable weak granular blocky
firm moderate prismatic platy
>50 rigid strong massive
<3 5 loose loose single grain
35 -50
friable weak granular blocky
firm moderate prismatic platy
>50
rigid Istrong I
massive
500 Willow Drive S Soil Log#5
21 Boring F� Pit Elevation 951.9 Depth to SHWT 16
Depth (in) Texture fragment% matrix color redox color consistence grade shape
0-4 Ti olxo i t 5 l Ovm4/2 Loose Loose Single grain
4-16 Clav Loam <35 1Oyr4,,4 FriableStrong Block,
16-=4 Clay Loam IOyr5/4 10 4 8,1-6/IOv Firm Strong Prismatic
<35 loose loose single grain
35-50 friable weak granular blocky
>50 firm moderate prismatic platy
rigid strong massive
<35 loose loose single grain
35 -50 friable weak granular blocky
>50 firm moderate prismatic platy
rigid Istrong massive
herehy certifp this stork was completed in accordance with AIN 7080 and any local reqs.
Z---,
L& Svc L r &2 2�ld
esigner Signature Company License#
Soil Observation Log
w%rw.Septic Resource.com vers 12.4
O%%ner Information
Property Owner/project: NOR-SON Date 10/27/2016
Property Address/PID: 500 Willow Drive S
Soil Survey Information ❑ refer to attached soil survey
Parent matl's: Till ❑ Outwash ❑ Lacustrine ❑ Alluvium ❑ Organic ❑ Bedrock
landscape position: ❑ Summit ❑ Shoulder ( j Side slope ❑ Toe slope
soil survey map units: L22C2 slope 7 % direction-Convex
Soil Log#6
El Boring ❑ Pit Elevation 951.3 Depth to SHWT 18 Inches
Depth (in) Texture fragment% matrix color redox color consistence grade ;Pape
0-14 Topsoil IOyr3/2 Loose Loose Single grain
14-18 Clay Loam <35 1Oyr4/3 Friable Strong Blocky
18-24 Clay Loam 5 1Oyr5,4 I Oy4/8,1-6/1 Oy Firm Strong Prismatic
<.5 loose loose single grain
� friable weak granular blocky
35-50
>50 firm moderate prismatic platy
rigid strong massive
<35 loose loose single grain
friable weak granular block
35-50 firm moderate prismatic plate
>50 rigid strong massive
Comments:
Percolation Test Data Sheet
Lic.#810
Percolating test readings made by: Rusty Olson's Perc. starting at 10:36 A.M. On 10/28/16
Location: 500 Willow Drive S
Hole number: 1
Date hole was prepared: 10/27/16
Depth of hole bottom_12"_inches.. Diameter of hole_6"_inches.
Soil data from test hole:
Depth, inches Soil texture
0-6 Dark Brown Loam 10yr3/2
6-12 Brown clay loam 10yr4/3
Method of scratching side wall: Knife
Depth of gravel in bottom of hole 2 inches:
Date of initial water filling 10/27/16 depth of initial water filling 12 inches above the hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic Siphon
Maximum water depth above hole bottom during tests 6 inches
Time Time Depth Drop in H2O Perc Rate
10:56 11:26 6" 3.7 8.1
11:29 11:59 6" 3.6 8.3
12:00 12:30 6" 3.6 8.3
AVERAGE PERC. RATE 8.2 MPI
Percolation Test Data Sheet
Lic.#810
Percolating test readings made by: Rusty Olson's Perc. starting at 10:36 A.M. On 10/28/16
Location: 500 Willow Drive S
Hole number: 2
Date hole was prepared: 10/27/16
Depth of hole bottom_12"_inches, Diameter of hole_6"—inches.
Soil data from test hole:
Depth, inches Soil texture
0-4 Dark Brown Loam 10yr3/2
4-12 Brown clay loam 10yr413
Method of scratching side wall: Knife
Depth of gravel in bottom of hole 2 inches.-
Date
nches:Date of initial water filling 10/27/16 depth of initial water filling 12 inches above the hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic Siphon
Maximum water depth above hole bottom during tests 6 inches
Time Time Depth Drop in H2O Perc Rate
10:57 11:27 6" 3.2 9.4
11:28 11:58 6" 3.1 9.6
12:01 12:31 6" 3.1 9.6
AVERAGE PERC. RATE 9.5 MPI
Percolation Test Data Sheet
Lic.#810
Percolating test readings made by: Rusty Olson's Perc. starting at 9:15 A.M. On 3/20/16
Location: 500 Willow Drive S.
Hole number: 3
Date hole was prepared: 3/19/16
Depth of hole bottom_12"_inches, Diameter of hole_6"_inches.
Soil data from test hole:
Depth, inches Soil texture
0-6" Dark Brown Loam 10yr3/2
6-12 Brown clay loam 10yr4/3
Method of scratching side wall: Knife
Depth of gravel in bottom of hole 2 inches:
Date of initial water filling 3/19/16 depth of initial water filling 12 inches above the hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic Siphon
Maximum water depth above hole bottom during tests 6 inches
Time Time Depth Drop in H2O Perc Rate
9:32 10:02 6" 3.5 8.5
10:05 10:35 6" 3.4 8.8
10:40 11:10 6" 3.3 9.1
AVERAGE PERC. RATE 8.8 MPI
Percolation Test Data Sheet
Lic.#810
Percolating test readings made by: Rusty Olson's Perc. starting at 9:15 A.M. On 3/20/16
Location: 500 Willow Drive S.
Hole number: 4
Date hole was prepared: 3/19/16
Depth of hole bottom_12"_inches, Diameter of hole_6"_inches.
Soil data from test hole:
Depth, inches Soil texture
0-6" Dark Brown Loam 10yr3/2
6-12 Brown clay loam 10yr4/3
Method of scratching side wall: Knife
Depth of gravel in bottom of hole 2 inches:
Date of initial water filling 3/19/16 depth of initial water filling 12 inches above the hole bottom
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic Siphon
Maximum water depth above hole bottom during tests 6 inches
Time Time Depth Drop in H2O Perc Rate
9:33 10:03 6" 2.2 13.6
10:04 10:34 6" 2.1 14.3
10:41 11:11 6" 2.1 14.3
AVERAGE PERC. RATE 14.0 MPI