Loading...
HomeMy WebLinkAbout2018-00249 - entrance monuments CITY OF ORONO * 2018 - 00249 * 2750 KELLEY PARKWAY DATE ISSUED: 03/14/2018 ORONO,MN 55356- (952)249-4600 FAX: (952)249-4616 ADDRESS 500 WILLOW DR S PIN 03-117-23-32-0017 LEGAL DESC N/A LOT 001 BLOCK 001 PERMIT TYPE ACCESSORY STRUCTURE PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ENTRANCE MONUMENTS ACTIVITY 328-OTHER NONRESIDENTIAL BUILDINGS VALUATION $ 14,000.00 NOTE: ENTRANCE MONUMENTS APPLICANT PERMIT FEE SCHEDULE 263.28 STATE SURCHARGE(VALUATION) 7.00 NOR-SON INC TOTAL 270.28 700 LAKE STREET E Payment(s) WAYZATA,MN 55391- CREDIT CARD 0448 270.28 (952)767-7949 Minnesota State License#:BUIL-BC001969 OWNER MERRY,GRAHAM 3750 HUNTINGTON AVE S ST LOUIS PARK,MN 55416- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. Applicant Permitee Signature Date IssueBy ignature Date CITY OF ORONO BUILDING PERMIT APPLICATION 76. ';�'g FOR NEW STRUCTURES OR ADDITIONS A, Mailing Address: Permit number: PO Box 66 C� Crystal Bay, MN 55323-0066 Date received: Street Address:' � Received by: ti G� 2750 Kelley ParkwaZ�I:rol �l Plan review fee: /71, F `gK£SHD�� Orono, MN 55356 a 0!8-Oa�2 Main: 952-249-4600 Total Fee: Fax: 952-249-4616 no.mn.us This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (Please print) GENERAL INFORMATION: Job Site Address: Will this be a Parade of Homes, Remodelers S wcase Home or other Display Home? es ❑ No If yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shutt/ b s service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATIO Name: — State License# MLI l9425 Expiration Date: Phone: cell Z - office Z -- — 79 3 Mailing Address: nth 42 , 'City: ZIP: `-M Contact Person: Applicant is: Contractor / Homeowner (circle one) Email and/or Fax: k PROPERTY OWNS INFORMATION: J� Name: ! A l-tam t L4-z,-, Phone (day): Address: City: `�•l.< ilS 'IC. ZIP: l Email and/or Fax r , ARCHITECT/ENGINE13R INFORMATION: Name: X &V 8 94E5 Phone(day): -- � Z"1 — //,^ _ (f Address: City: 46 f'r Email and/or Fax: PROJECT INFORMATION: Description of project: 1.Type of Project 2.Proposed Use 3.Structure Type 4.Sewage Disposal& Water Supply ❑ New Construction ❑ Single Family with ❑Accessory Bldg./Garage ❑Addition attached garage ❑ Deck ❑ Public Sewer ❑Accessory Building ❑ Single Family with ❑Office/Commercial Relocation ��,,',' detached garage ❑ Residence ❑ Private Sewer Other: (specify) I���M Multiple Family/Condo El Retaining Wall(s) ❑ Public 4-feet or greater ❑ Public Water "Any earth movement may also require ❑ Commercial ❑Storage MCWD review&permits. ❑ Industrial Warehouse ❑ Private Well Minnehaha Creek Watershed District(MCWD) ®Other:(specify) R Other(specify) 15320 Minnetonka Blvd 0lVj7,111\26- �WMA Minnetonka,MN 55345 Phone: 952-471-0590r Dr A Fax: 952-471-0682 "�t www.minnehahacreek.gM Estimated Construction Valuation (excluding land) p MAR 0 7 2018 Last Updated: January 2016 CITY OF ORONO STRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions(continued) a. Length(ft.)= Number of bedrooms= 2. Occupancy: b.Width(ft.)= Number of garage stalls: Areas in square feet Attached= 3. Occupant Load: c.Basement= Detached= 4. Type of Construction: d. 1 s'Story = e.2nd Story= 5. Code Edition: f. '/z Story = g.Total Area= REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable ❑ ❑ Building Permit Escrow Agreement and Fees ❑ ❑ Plan Review Fee ❑, ❑ Completed Application Form ❑ Proposed Building Plans—2 full size sets,to scale and 1 reduced 11 x 17 or 8'/2 x 11 set ❑ Minnesota State Energy Code Calculations and Mechanical Code Requirements ❑ Survey—2 full size,to scale(meeting ALL survey requirements EY ❑ Hardcover Calculations ❑ ❑ Septic System Certification ❑ ❑ Minnehaha Creek Watershed District(MCWD)Permit or Documentation from MCWD stating no permit is required ❑ ❑ Landscape Walls and/or Retaining Wall Plans ❑ ❑ Stormwater Pollution Prevention Plan SWPPP ❑ ❑ Access Permit ❑ ❑ Data Privacy Advisory Form APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so,the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensur o pletion of the as-built survey and all site improvements. Applicant's Signature: Date: -3 Owner's Signature: Date: Last Updated: January 2016 PLAN REVIEW R��EVIEW \C( HECKLIST FOR NEW STRUCTURES /^ADDITIONS Address: 5Ju M O►�V �iyt S Permit No.: 2Lff Description of work: En-TUIC(- Date Rec'd: �' I Septic review by: Date Approved: Zoning review by: Date Approved: Building review by: Date Approved: 2gn Grading review by: Date Approved: 3'q ' Zoning District: 13 Zoning File M Resolution? Yes Reso M Reso Date: Signed: Yes No Resolution/ NA Zoning: Lot Area: t02 SF /AC Width: Structural Coverage: SF % Survey Submitted: ,Pr<es 0 No Date of Survey: 2'(5 ' 0 Revised dateM: Landscape plan submitted? O Yes Landscaper: 0 No/ None proposed Proposed Setbacks: Front(L e) Rear(Str ) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side to N r Buildina Hei ht Anal sis: Distance Between First Floor and defined Top of Roof* (See "building height" (a) definition): First Floor Elevation from building plans): (b) Highest Existing ground level (per survey) or 10' above lowest ground level, (C) whichever is lower: Difference between b and (c)*: (d) DEFINED KEFGHT *If highgsrexisting adjacent grade is above FFE-Height is (a)-(d): (e) *If est existing adjacent grade is below FFE-Height is a + d Shoreland District MCWD Permit Average Lakeshore Setback Bluff Met? 0 Yes No Permit Number: 0 Yes 0 No 0 Yes 6J—No 0 N/A—see attached Setback: Stormwater Quality Existing Proposed Overlay District Tier Hardcover Hardcover Variance Required CUP Required circle one % and sf % and sf 0 Yes — 0 Yes 1 2 3 4 5 �/� �� Type(s): Type(s): Updated: June 2017 z:\forms\plan review checklist 06-2017.docx Fees to be Charged YES NO Permit Plan Review State Surcharge Investigation Fee SAC—Number of SAC Units Other(specify) Square Footage $ per Square Footage Basement X = $ 1St Floor X = $ 2nd Floor X = $ Garage X = $ Lou Estimated Construction Value: $ f i L O Orono Inspections Required Work Requiring Separate Permits ooting ❑ Site ❑ Plumbing ❑ Grading/Filling ❑ Poured Wall ❑ Silt Fence/Erosion Control ❑ Mechanical ❑ Fire ❑ Foundation Survey ❑ Hardcover Removal ❑ Fireplace ❑ Water Connection ❑ Framing ❑ Other(specify) ❑ Masonry ❑ Sewer Connection ❑ Waterproofing/Drain tile ❑ Mfg. ❑ Lawn Irrigation ❑ Foundation Waterproofing ❑ Other(specify) ❑ Landscaping Framing ❑ Septic ❑ Insulation ❑ As-Built Survey Final ❑ Lathe Required State Permits ❑ Other(specify) ❑ Well Electrical REMARKS (in-house): OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: ❑ See Builder Acknowledgement Form ❑ Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. Updated: June 2017 z:\forms\plan review checklist 06-2017.docx • 000000000 E 0000u0000 --- D 5"x 5" I j NOTE 3 BACK PLATE top', 0 `" 0 TOP VIEW (NTS- BRACKET ONLY) I t_ C SIZE: 14" 16" 18" 22" FRONT VIEW SIDE VIEW A: 18' 20" 1" 26" (NTS) (NTS) RSG' 10 g NOTES: ��� � B: 10 " 10 8° " 8 1.MOUNTING HARDWARE SUPPLIED BY OTHERS MAR "� ?D!a C 11 11 11 8'r 0 8" 11 8° 2.FIXTURES ARE HANDCRAFTED. DIMENSIONS MAY VARY PLUS OR MINUS " �,` l OF� O D: 2 r 2 2 rr Z" 2 2" 3.ELECTRIC LIGHTS SUPPLIED WITH 18/2 WIRE WITH GROUND /VD E• 8' 8 a 6 I�r 8" 4.IA ,i 4 F: 10 g ' 128" 144" 188 11 ITRI LIGDRWBJJG E tEOO GAS&ELECTRICBEvoLo LIGHTS.DRAWINGS&DESIGNS ARE OWNEDLIGHT: COACH HOTTSE DATE: APP.BY: MAJ BY EVO O AND Emco Bio��A D S a ELECTRIC LIGHTS.DRAWINGS AND DESIGNS 3 RACKET: BRACKET MOUNT 08-5-10 REVISION: 2 SHALL NOT BE DUPPLAICCATED IN WHOLE OR w4ft-N ► It mu ?nit - 6OL4q — Erl i Ia- Moruk Wm 11 Reviewed for Code Compliance City of Orono Date Reviewer NOR-SON 2--r Iv- CUSTOM BUILDERS 7t tip copy 5 1 P-1 2 _e L I HLILLL =TT1TT' T Lciy of Orono illi=IlII lll IIIF 1gIMI-TIr TFTA TPHT1I d=14I11 I1I ,111 141 1I- Planning&Zoning Plan Review l� O Site Plan Review Date: 24_ I;/�16 EUEVAnON 1/2•=I•-0• z 910PROVED I /t APPROVED WITH REVISIONS(see notes) 0 DENIED /I O WW1ffMANDM8MTS &Wnr��w� ■ To"n r-r IW-TKOLIMINMCOLUA" FpILKMMG cmE FIUMIMcowIEBE cm�FM� / TO REALE react BFAMwl3-KB -FI 7. FF PRENNIS F-- r REVISIONS _7 "m HcowwWH C.E­ 2_�COLUMN PLAN -01 3/05/201 8 /s-rs FA wer II II II II II II JOB NO. 3334 GATE COLUMNS ',COLUMN SECTION SHEET G1 .0 -1 � - �405 2. Fences within the required side yard of a lakeshore lot shall not exceed six feet in height, and shall not exceed 42 inches in height for any portion located lakeward of a line drawn between the most lakeward projection of the fence owner's principal residence structure and the most lakeward projection of the principal residence structure on the adjacent property abutting the side yard in which the fence is located. 3. Fences shall not be constructed within the defined lakeshore yard of a lakeshore lot, i.e., shall not be located within 75 feet of the shoreline for general development lakes, 100 feet for recreational lakes, or 150 feet for natural environment lakes. 4. When the building site of a lakeshore lot is separated from the lakeshore by a public or private road, the following definitions will apply for fence location purposes subject to the provisions of section 78-1405(a)(8)a.2: When the yard on the opposite side of the building site from the lake does not abut a street, such yard shall be considered as a standard rear yard. The yard between the building site and the street shall be considered as a standard front yard. c. Special provisions. Split rail fences of no more than three rails within a required front, street or side street yard may have a maximum top rail height of 48 inches above existing ground level. Board rail fences within a front, street or side street yard for the specific purpose of enclosing permitted domestic animals may have a top rail height of 60 inches and shall be no more than 50 percent opaque. d. Intersection sightline obstruction prohibited. No fence shall be installed so as to obstruct a required clear view at street intersections as required by section 78-1371. e. Fence construction and maintenance. 1. The owner of a fence shall maintain it in a condition of reasonable repair and appearance and shall not allow it to become or remain in disrepair or in a dangerous condition. 2. Fences shall be installed with the finished side facing neighboring properties or the street. The term "finished side" means that side having no structural supports. 3. Fencing materials shall consist of permanent all weather products. 4. Temporary fencing shall not be allowed to remain on the property following final inspection, or issuance of a certificate of occupancy for a permitted construction project, or protection of property during a similar project or winter conditions. Winter conditions shall be defined as October 15 through March 31 of the following year. Temporary fencing associated with a special event shall be removed within seven days of the end of such event. Temporary fencing materials shall not be allowed to remain on a permanent basis on a parcel. 5. Existing fences that are legal nonconforming as to location, height, design or other characteristics may be replaced in kind. (9) Entrance monuments, defined for the purpose of this section as a nearly permanent physical structure or object, natural or artificial, used to depict an entrance to the property, erected in all residential zoning districts are considered nonencroachments when they conform with the following standards: a. Each monument, with a maximum of two per approved driveway access, shall be limited to a single pillar with a footprint measuring no larger than 25 square feet and no length to exceed five feet; b. The monument must be setback a minimum of fye feet from all ll property boundaries and never fewer than ten feet from the edge of the paved, traveled roadway; c. Plans and/or elevation views of the proposed monuments are required to be submitted for approval by the planning director; GGS�� d. All signage proposed for the monuments must comply with section 78-1467; e. The monuments are limited to eight feet in height including any appurtenances. Any monument exceeding the maximum height must meet principal structure setback requirements; 1`fL' ' �,^hen more than one monument is proposed, and serving two or fewer residences, a minimum horizontal width of 16 feet is required between them; When more than one monument is proposed, and serving three or more residences, a minimum horizontal width of 22 feet is required between them; h. Lighting is allowed, in conformance with section 78-1573 and at the discretion of the planning director. i. When a gate is proposed, the following requirements must be met: 1. The gate must open into the property not outward towards the right-of-way, and 2. Gates serving two or fewer residences shall have a minimum horizontal width of 14 feet in the full open position, and 3. Gates servin or more resi all have a min' h of 0 ull open pos 4. For all properties, gate height may not exceed the height of the monument, measured (� from grade, unless principal structure setbacks are met (if monuments are not v� proposed then gate height shall be regulated in accordance with the fence height regulations of section 78-1405(8), and 5. Gates must maintain an opacity level of no greater than 25 percent, and 6. For locked and/or secured gates a knox box, meeting the standards set forth by the police and fire department, must be provided for emergency access, and 7. On major thoroughfares the monuments and gates must be located 40 feet from the paved, traveled road to allow for vehicle stacking. A major thoroughfare for the purposes of this section means any county road or state highway. j. A building permit is required for installation and the property corners must be located for inspection purposes. (b) The following shall not be considered to be encroachments on structure height requirements: (1) Parapet walls that extend no more than three feet above the height of the building. (2) HVAC cooling towers. (3) Elevator penthouses. (Code 1984, § 10.03(15); Ord.No. 211 2nd series, §§ 1-5, 11-26-2001; Ord. No. 12 3rd series, § 1, 5-24-2004; Ord.No. 30 3rd series, § 1, 11-28-2005; Ord.No. 43 3rd series, § 1, 2-25-2008; Ord.No. 106 3rd series, § 22, 6-10-2013; Ord.No. 139 3rd series, § 1, 2-23-2015; Ord.No. 140 3rd series, § 1, 3-23-2015; Ord.No. 170 3rd series, §§ 3,4, 6-13-2016; Ord.No. 188 3rd series, § 1, 3-22-2017; Ord.No. 189 3rd series, § 5, 4-10-2017) Christine Mattson From: Adam Edwards Sent: Friday, March 09, 2018 12:15 PM To: Christine Mattson Cc: Roger Peitso Subject: RE: 500 Willow Drive S/#2018-00249 Chris, I've reviewed the subject Grading plan and stamped it approved for the purpose of installing monuments. 1. The proposed entrance monuments to not appear to alter the grade. Adam From:Christine Mattson Sent: Friday, March 09, 201811:41 AM To:Adam Edwards<aedwards@ci.orono.mn.us> Cc: Roger Peitso<rpeitso@ci.orono.mn.us> Subject:500 Willow Drive S/#2018-00249 Adam, We received a building permit application for entrance monuments at 500 Willow Drive South. I have the following comments: • Need information on proposed lighting. Does it meet City Code Section 78-1573 • Need info on which way the gate opens • Will the gate be locked? If so, knox box info must be submitted. Let me know if you have any other questions or concerns. Thank you! Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway ! Orono I MN ( 55356(physical address) PO Box 66 1 Crystal Bay I MN 155323-0066 (mailing address) 2 952.249.4620 18 952.249.4616 ® cmattson@ci.orono.mn.us E -'�5 www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm 1