HomeMy WebLinkAboutSeptic System Repairs 0 0
CITY of ORONO
MW*iPW0ffk"
1, x Offim
mCrystal ter, s�23-oo66
`9kESI304�
June 5, 1992
Richard Perry, Jr.
440 Willow Drive South
Long Lake, MN 55356
RE: Septic System Repairs
Dear Mr. Perry:
This is a reminder that a recent inspection revealed that your
septic system is failing and must be repaired.
Please contact me as soon as possible to discuss your options.
You have until August 3, 1992 in which to make repairs to the
system. Enclosed is a copy of your most recent septic report.
The procedure for initiating septic system repairs is as follows:
1. Hire a Soil/Site Evaluator to do the necessary testing
and design.
2. Submit the design to the City for approval.
3. Once the design is approved, have one or more
contractors bid on the approved design.
4. The contractor you choose should then obtain a permit
from the City before starting work, and he will call
for the required inspections.
If you have any questions please contact me at the City .offices.
Thank you for your prompt attention to this letter.
Sincerely,
Stephen Weckman
On-Site Systems Manager
Enclosure
SW/lsv
TELEPHONE-473-7357•FAX-473-0510
0,4v?
CITY of ORONO
F ti
most Office Box 66
G� CrysW iay,Nlhm ofa 55323-0066
S
EI3 O
July 2, 1992
Richard Perry Jr.
440 Willow Drive S
Long Lake, MN 55356
RE: Septic System Repairs
Dear Mr. Perry:
A recent inspection revealed that your septic system is failing
to treat waste properly and must be repaired.
On at least two separate occasions you have been sent
notifications of the required septic system repair and a August 3
deadline has been established. We still have not received .any
indication that repairs have begun. Unless a repair permit is
issued or a repair schedule approved by August 3, 1992, we will
turn this matter over to the City Attorney.
Please contact the City offices as soon as possible to discuss
your repair options. Thank you for your prompt attention to this
matter.
Sincerely,
Stephen Weckman
On-Site Systems Manager
SW/lsv
TFLEMONE-473-7357•FAX-4734510