Loading...
HomeMy WebLinkAbout2003 - P06241 - new structure PERMIT CITY OF ORONO Permit Number: 2750 Kelley Parkway - PO Box 66 P06241 Crystal Bay, Minnesota 55323 Permit Type: New Structure (952) 249-4600 Date Issued: 5/28/2003 SITE ADDRESS: 925 Willow View Dr Long Lake,MN 55356 PID: 28-118-23-44-0008 DESCRIPTION: UBC Occupancy R3 Construction Type VN Proposed Use: Residential Permit Class: Building Census Code 101 Permit Type: New Structure Permit Sub-type(s): New Home-Single Family DETAILS: Approved per resolution#: Separate permits required: Plumbing Mechanical Fireplace Water Connection Sewer Connection irrigation Electrical(state) NOTICES/REMARKS: FEE SUMMARY: Permit Fee: $ 4,183.75 Valuation: $ 700,000.00 Plan Review Fee: $ 2,719.43 State Surcharge Fee: $ 350.50 SAC Fee: $ 1,275.00 TOTAL FEE: $ 8,528.68 APPLICANT: Brenshell Homes OWNER: RVC Homes 4052 Oakland St E 1003 Twelve Oaks Circle St.Bonifacius,MN 55375 Wayzata,MN 55391 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. i 2 APPLICANT'h.'1 ITEE SI NATURE ISSUED BY SIGNATURE Cdpies: 1-File(Siznitures Required), 1-Applicant, 1-Monthly Reports. 1-Assessin2, 1-Finance Page 1 .CV Total Fee: $ ?o-(0 Date Received: Y Entered By: _ Permit #: .4o( 2(7// CITY OF ORONO - BUIL ING PERMIT APPLICATION ),` '� All information must be submitted in full before plan review will be started. (please print all information) r- THE APPLICANT IS: (circle one)"" OWNER OR CONTRACTOR JOB SITE ADDRESS: 2S W tt Uow Vtc 'D2 . ZIP: NAME OF OWNER:fT)(ZENSI-FEu- 1-70,146 14C . PHONE: (home) (work) 95Z-LF 4 to-lig(' MAILING ADDRESS: LIQSZ C kiet L CITY: . ekµtOctal S ZIP: S5315 EAT CONTRACTOR: j(1. 51 (- PHONE: q ` 4(o -(2d y CONTACT PERSON:, fMir-I MOBILE/PAGER: (0(7. '2$2 - `1`�g Z MAILING ADDRESS: Lfpj 2- 0a,� (ci, SA-, CITY: • V% du ZIP: I�L 5S37S STATE LICENSE: # ARCHITECT/ENGINEER: (�„ P 1 !. h ► l A + i I HONE: ��p3���O CO MAILING ADDRESS:t - CITY: L ZIP: 9 NAME: j14 (7 N REGISTRATION �V 'TE*-(Ob TYPE OF WORK: New/1c x Addition Accessory Structure Move Remodel/Alteration Land Alteration PROPOSED WORK(describe in detail): AJ (*WC COAL 72.0 L/7�0✓ STORIES: 77 Q.FEET OF EACH FLOOR: T' 14(e( y FF CAS( 5C5C I�1og NO. OF BEDROOMS: 1 GARAGE STALLS: ATT. 3 DET. CD ESTIMATED CONSTRUCTION VALUATION(excluding land): $ -70 COO I hereby apply for a building permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of the City and with the State Building Code; that I understand this is not a permit and work is not to start without a permit; and that the work will be in accordance with the approved plan. �1 APPLICANT'S SIGNATUREs� > - DATE: l'71-2 -c3 NOTE! Parade of Homes events require separate permit approval by Police Department and City Council 60 days prior to the event. Non permitted events will not be allowed. 9 Sec.13.04 RIGHTS OF SUBJECTS OF DATA Subdivision 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section. Subd.2. Information required to be given individual An individual asked to supply private or confidential data concerning himself shall be informed of (a)the purpose and intended use of the requested data within the collecting state agency,political subdivision,or statewide system;(b)whether he may refuse or is legally required to supply the requested data;(c)any known consequence arising from his supplying or refusing to supply private or confidential data;and(d)the identity of other persons or entities authorized by state or federal law to receive the data. This requirement shall not apply when an individual is asked to supply investigative data,pursuant to section 13.82, subdivision 5, to a law enforcement officer. The commissioner of revenue may place the notice required under this subdivision in the individual income tax or property tax refund instructions instead of on those forms. Subd.3. Access to data by individual Upon request to a responsible authority,an individual shall be informed whether he is the subject of stored data on individuals,and whether it is classified as public,private or confidential. Upon his further request,an individual who is the subject of stored private or public data on individuals shall be shown the data without any charge to him and, if he desires,shall be informed of the content and meaning of that data. After an individual has been shown the private data and informed of its meaning,the data need not be disclosed to him for six months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been collected or created. The responsible authority shall provide copies of the private or public data upon request by the individual subject of the data. The responsible authority may require the requesting person to pay the actual costs of making,certifying,and compiling the copies. The responsible authority shall comply immediately,if possible,with any request made pursuant to this subdivision,or within five days of the date of the request,excluding Saturdays,Sundays and legal holidays,if immediate compliance is not possible. If he cannot comply with the request within that time,he shall so inform the individual,and may have an additionalfive days within which to comply with the request,excluding Saturdays,Sundays and legal holidays. Subd.4. Procedure when data is not accurate or complete.An individual may contest the accuracy or completeness ofpublic or private data concerning himself. To exercise this right, an individual shall notify in writing the responsible authority describing the nature of the disagreement. The responsible authority shall within 30 days either: (a)correct the datafound to be inaccurate or incomplete and attempt to notes past recipients of inaccurate or incomplete data,including recipients named by the individual;or(b)notes the individual that he believes the data to be correct. Data in dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data. The determination of the responsible authority may be appealed pursuant to the provisions of the administrative procedure act relating to contested cases. DATA PRIVACY ADVISORY In accordance with M.S.13.04,Subd.2, "Rights of subjects ofdata",we would like to inform you that your requestfor a permit or license from the City of Orono or any of its departments may require you to furnish certain private or confidential information. You are notified that: 1. The information you furnish will be used to determine your qualification for the permit or license requested. 2. You may refuse to supply data,but refusal may require that the City deny the permit or license. 3. The information may be shared with other local,state or federal agencies to the extent necessary to process the permit or license. 4. If your requested permit or license requires Council action to approve,some information may become public. 5. You have certain rights under M.S. 13.04(see following page)to review private data on yourself. 6. Your full name is required to process this application or permit. PLEASE PRINT First Middle Last Address City State Zip Phone I 1:erstand. i s is a s d ffbove. / � �. i• . ure 4 10 CHECK OFF LIST FOR ISSUANCE OF PERMITS FOR OFFICE USE ONLY ADDRESSOR LEGAL: O 2 . PID: DESCRIPTION OF WORK: iv e w f2 $ ZONING REVIEW BY: V/ CP-ww_ DATE APPROVED: S-7g •03 BUILDING REVIEW BY: / DATE APPROVED: s-' - ' a 3 FEES TO BE CHARGED: Misc. Fees Calculated By: PERMIT Yes i No PLAN REVIEW Yes ✓ No SEWER CONNECTION STATE SURCHARGE Yes ✓ No WATER CONNECTION INVESTIGATION FEE Yes No ✓ PARK FEE SAC Yes ✓ No SITEINSPECTION Number of SAC-Units j. OTHER (specify) ZONING CHECK LIST Zoning District: Fire Department: Post Office: School District: - Lot Area: Sq.ft. Acres Width Depth Survey Submitted: Yes ,L No Date of Survey: `-i• Z-0 • 03 Proposed Setbacks: Front(Lake): I (-81 Right Side: 35 Rear(Street): I SC, Left Side: 30•`\ Adjacent Structures: NIA Wetland: -- Building Height: Def. Hgt. 30 Peak Hgt. 36' Lot Coverage: 0.1c- Grading: Staff Approval Date: s-i 3- 0) By: ci4.0. Council Approval Date: — Septic: Staff Approval Date: Al/4- By: Zoning File: # — Resolution: # — Resolution Date: Shoreland District: N(� Avg. Setback: Bluff Setback: Lot Coverage: Existing Proposed Hardcover: 0-75' 75-250' 250-500' 500-1000' Hardcover Variance Required: Yes No Date of Council Approval: REMARKS (in house): 7 BUILDING REVIEW CHECK LIST UBC: i2 3 CONSTRUCTION TYPE: VA( Sq Footage $Per Sq Ftg Basement x _ 1st Floor x _ 2nd Floor x _ Garage x x TOTAL Estimated Construction Value: $ ?00,Op 0 42'2- Inspections Required: Work Requiring Separate Permits: Site X Plumbing Fire Hardcover Removal p( Mechanical Water Connection x Footing Septic __ Sewer Connection �( Framing Fireplace Ax. Lawn Irrigation < Insulation (M Wall Board pe Other p (Mfg.) Well(State Permit) Final Grading/Filling __ Electrical(State Permit) Other REMARKS(LST HOUSE): • ------- REVIEW BY OTHERS: DATE: --_-- __ Access: Existing New Access Approval: Date By: REMARKS (TO BE NOTED ON PERMIT): • 8 a FROM : D.F.P. PLANNING a DESIGN, INC. PHONE NO. : 651 638 1412 Apr. 28 2003 07:42AM P2 1?L,FFG: Permit Number MECcheck Compliance Report 1999 Minnesota Energy Code MECcheck Software Version 3.2 Release i Checked By/Date TITLE: 203162 COUNTY:Hennepin STATE:Minnesota ZONE:2 CONSTRUCTION TYPE: Single Family DATE:04/28/03 DATE OF PLANS:4/18/03 PROJECT INFORMATION: L07,BO1 -WILLOW VIEW Ci 2S WILLOW VIEW ORONO, MN COMPANY INFORMATION: BRENSHELL HOMES COMPLIANCE:Passes Maximum UA=743 Your Home=627 15.6%Better Than Code Gross Glazing Area or Cavity Cont_ or Door Perimeter R-Value R-Value U-1 actor UA Ceiling 1:Raised or Energy Truss 1651 44.0 0.0 36 Wall 1:Wood Framc, 16"o.c_ 4531 19.0 0.0 219 Window 1: Above Grade,Vinyl Frame,Double Pane with Low-E 628 0.370 232 Door 1: Solid 72 0.140 10 Door 2:Glass 48 0.370 18 Door 2:Glass 72 0.370 27 Basement Wall 1: Solid Concrete or Masonry,9.0'hr/8.5'bg/9.0'insul 882 11.0 0.0 49 Basement Wall 2: Solid Concrete or Masonry,3.5'ht/3 0'bg13.5'insul 88 11.0 0.0 6 Floor I:All-Wood Joist/Truss.Over Unconditioned Space 924 30.0 0.0 30 Furnace 1:Forced Hot Air,90 AFUE Proposed and Maumum U-Factor Averages Proposed Maximum Average U-Factor Allowed U-Factor Above-Grade Windows and Glass Doors 0.370 0.370 Includes Foundation Windows>5.6 ft2 t v FROM : D.F.P. PLANNING & DESIGN, INC. PHONE NO. : 651 638 1412 Apr. 28 2003 07:42AM P3 Floors Over Unconditioned Space 0.033 0.033 COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building plans,specifications,and a ther calculations submitted with the permit application_ The proposed building has been designed to meet 1999 E • gy Code requirements in MECcheck Version 3.2 Release 1. Builder/De-signer Ale t: Date : 4/Z&/t 3 DATE , TIME CITY OF ORONO CALLED IN I -36-4)1 INSPECTION NOTICE , SCHEDULED 2 2-0`I PERMIT NO. / U(,1-'1 / COMPLETED ADDRESS % ,5 `r/J//0I) v/ ' 0/' , , / OWNER /2-3 7 CONTR.�/ , P h..5 � e�� - i-a( S , TELEPHONE NO. (../7(../76- 0 2 t' -3 /-3—P/ DESCRIPTION N e C.ii ' u 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z •. BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 4lgtr._ 14 SEWER HOOK-UP 06 PROGRESS • MO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP i09 PLUMBING RI 23 SEPTIC FIN 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL IC Z OWNER/CONTRACTOR TO MEET YOU: YES_NO o COMMENTS: cc W cc o -1M, 'TA i o t P•00 4 icW LeiF 'itd` 'I ' vsec4 -0 �' cc Q W Z W cc IQ WORK SATISFACTORY:PROCEED >\PROJECT COMPLETE CC W CICORRECT WORK&PROCEED ❑ ISSUE RTIFICATE OF OCCUPANCYN Q ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY 1554.-u C 1 BEFORE COVERING PERMANENT -2-12.10,1 ❑CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN INSPECTOR WILL RETURN 0 CITATION ISSUED 0 STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the nex‘inspection 24 hours in advance. (952) 249-4600 Owner!Contrag#or-qnfle: Inspector. } C White Copyllnspector's File ` Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE / SCHEDULED 11111 PERMIT NO. /406,2`� /, I ,✓ COMPLETED �� ADDRESS q W I F�Cat) V t, OWNER CONTR. TELEPHONE NO. 6 / 2 8 3 I /S& / _Aciit-6-v- • DESCRIPTION G _e — 4,1 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q INAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP i09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL • OWNER/CONTRACTOR TO MEET YOU:_YES_NO c(., COMMENTS: 11 Q. -RAC() cc,l �Mi Q. -k ,`: Q &SS CC O CC PD lode 9 2- Meet& j LL• PO 6,393 S/TO Q Po 6.647 Pl ums- z W z W al WORK SATISFACTORY:PROCEED PROJECT COMPLETE CC W ❑CORRECT WORK&PROCEED 0 ISSUE CERTIFICATE OF OCCUPANCY OO 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY U BEFORE COVERING PERMANENT)01".. 0 CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN INSPECTOR WILL RETURN �I D ❑ 0 CITATION ISSUED STOP ORDER POSTED.CALL INSPECTOR 0 INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the nex inspection 24 hours in advance. (952) 249-4600 Owner!Contract i e: Inspector. White Copy/Inspector's File Canary Copy/Site Notice (55(-4-) q DATE TIME CITY OF ORONO CALLED IN /-I 1-O3 INSPECTION NOTICE . SCHEDULED 7-1Z-(*) 1 ;3 O PERMIT NO. > b b ZI COMPLETED ADDRESS 1 I,v(l/OW Vl e[c) OWNER CONTR. � TELEPHONE NO. 92- Z�f Z 5-i0 E DESCRIPTIONFra-rittil1 SSUeS. — u 01 FOOTING 11 MEL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS " 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP i09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO c0.,, COMMENTS: W j� Q. I e,xLASl CIaCccp_ J o›.. 1-1--O a .e. Ok< 4-o Coski-ipt u e.ccO W cc Q Lu z W cc 2 WORK SATISFACTORY:PROCEED 0 PROJECT COMPLETE CC 41 0 CORRECT WORK&PROCEED 0 ISSUE CERTIFICATE OF OCCUPANCY O 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY Oi BEFORE COVERING PERMANENT 0 CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN INSPECTOR WILL RETURN 0 STOP ORDER POSTED.CALL INSPECTOR 0 CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnerIContrac o site: Inspector. —kjauLT White Copyllnspector's File Canary CopylSite Notice c y , DATEt— TIME CITY OF ORONO DLZ" / CALLED IN —. (JJ INSPECTION N I E / SCHEDULED IMV c -3•30 pA4 PERMIT NO. C/� ) /• COMPD Q ADDRESS 5 ( 2(/lJ C l e& ' 0/ OWNERCONTR. c_ � TELEPHONE NO. (. / 0 3 Y i s r?/ DESCRIPTION W 01 •• .G 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 02 FRAMt 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS y 03 SOLATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP ULI 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLU,-= • 36 FOUNDATION/REMOVAL • 0 ER/CONTRA •RTO MEET YOU: ES_NO r.1• COMMENTS: ccLAC( l S�e . kA. cc ct� iji4( � ;cue O q cc O Q W W CC Lu ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE 0 CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY z-.; ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copy/Inspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN (g o3 INSPECTION NOTPE SCHEDULED -(k-o3 .1%3oPr� PERMIT NO. jQ(o2.4 I COMPLETED ADDRESS c:15 t� OWNER � CONTR. 6/rP,•,..0 �.e,Y TELEPHONE NO. �� (13 5'7(13 - ftara!i DESCRIPTION Ciail -2. I tJ kGC L,� n 01 FOOTING C 11 IHANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS h 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 1, 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT ✓ 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO o COMMENTS: CC C2K + 0 W W ct WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE 0 CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY U BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN INSPECTOR WILL RETURN ElSTOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnedContracto i et. Inspector. v aAi White Copy/Inspector's File Canary Copy/Site Notice (sj / CITY OF ORONO CALLED IN 9 DATE TIME dol INSPECTION NQS CHEZV---I'/ SCHEDULED 9-/6-03 /: o° PERMIT NO. r b0COMPLETED ADDRESS 9 25 CL)1!(rr u Vl ei.,..) 0 i OWNER CONTR. P,)retS kat TELEPHONE NO. 763 5-3S- . 731-3 DESCRIPTION InS v (<51-16- - / 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING Ll Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS Q (03,'INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION ct 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP cL 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET Y : YES_NO VOC711 , COMMENTS: -t�t,�C,L Vd\- 0 . CC a 11c L. _ 64. - .4',' t ! DO ! ' o60 ' 0. D "tin t.� l` S [42 f?✓�. Clear 5 .I ' t� lU5A--- a r ws} .. I m• .� . % : '� Q L 6ecd rlLU ' ,�(9 q C1'r°LCI. a Wks c914A. •T ( ce ,o tl - .. m � �t _ Q, E' Pte" ..44, , t A.,S.S.A; . - t NA t 6.4gr‘r ' t----S ci __TA/ t5 air'ctt a I W WORK SATISFACTORY:PROCEED CI PROJECT COMPLETE CCW -❑ CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY ✓ BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN El CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractors e: Inspector. White Copyllnspector's ile Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN is") INSPECTION NOT E SCHEDULED �'-(c 0'-3 /,`4c>�'4.1 PERMIT NO. ea tr / COMPLETED 4 — 11 ADDRESS c_)//%G�'?� th./.J ,I`. OWNER CONTR. / /e-A5.4-1--e A/dk.i'. TELEPHONE NO. 1 /47/(74 DESCRIPTION ,/f" cd/f f C•�� IQ 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS ,• • 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL •r��..' 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL �� / 36 FOUNDATION/REMOVAL • OWNER/CONTRACTOR TO MEET YOU:. ES_NO co• COMMENTS: cc W CC O cC O W CC W W CC Lu LURK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE t4.1 //❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY (..) BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the xt inspection 24 hours in advance. (952) 249-4600 OwnerlContr site: Inspector. _ White Copy/Inspector's He Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE, SCHEDULED &-03 PERMIT NO. /�OCPo?�/I COMPLETED /. U ADDRESS '9.1 5 / )////k.) •GG�J OWNER CONTR. le-A._ - W4(4TELEPHONE NO. •' ("f a � 5-01):3 D • ON W ' •• 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING vc 02 /W • • 13 MECHANICAL FINAL 19 LAKESHOREETLANDS h 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUM 36 FOUNDATION/REMOVAL c OWN CONTRACT TO MEET YOU: YES_NO c,,• COMMENTS: cc W cc O ec W CC (13Q CC ORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE CC ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY zi BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ElSTOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnerIContr on Inspector. White Copy/Inspector's File Canary CopylSite Notice 06/06/2003 12:03 FAX 8905883 INSTANT TESTING/ALLIED 001 SGB 952-446-1244 Tom Stokes (fax) 952-249-4616 — Orono Inspections(fax) INSTANT TESTING COMPANY 7125 WEST 126th STREET SAVAGE, MINNESOTA 55378 952-890-7366 phone CLIENT: Brenshell Construction X2i PROJECT: 92r'Willowview Drive INSPECTION DATE: June 6, 2003 Orono, Minnesota FIELD OBSERVATIONS: 1) I noted upon arriving that the concrete footings had been poured for the entire structure and thee wall forms were being put in place. The inspection office for Orono had requested a footing soils inspection for the garage area according to the builder. This was probably required since the test on file was from 2000. (2) We probed with a hand augur and a half-inch smooth rod along the entire length of the garage interior and exterior footing bottoms. In most situations the probing reached under the footing and found a soil quite competent for the proposed structure. The augering with the 1"auger showed the soil to be well-compacted fill below the footings. This soil also is firm and competent for the proposed construction. (3) Although it is not safe to assume that all soil will maintain its integrity(compaction) Through the winter, this clay did not have excess water that would expand its Volume and reduce its density. Submitted by: Inst•nt Testing Company Date: June 6, 2003 Daniel J. N ghton, P Seni wil Engineer Registration No. #20191 (MN) Mileage 50 mi. #G09 Chief Engineer 2.5 Ins STS CONSULTANTS, LTD. COMPACTION CONTROL REPORT I FIELD DENSITY TEST RESULTS 10900 73rd Avenue North,Suite 150 PROJECT: Willow View STS PROJECT: 97439-A Maple Grove,Minnesoia 55369-5547 LOCATION: Crone,MN REPORT DATE: OSl,1f00 k 763.315.6300 FAX 763.315.1(36 CLIENT: Willow view Developers,LLC TECHNICIAN: AS,RW SolnliorslkroughScienec.c a+gmea,na" CONTRACTOR: _ Doboszenski B,Sons _ REVIEWED BY: _ RCF- 1 w i Optimim In-Race In•Place I In-Place Test Waximum Water Moist Water i Dry Relative Compactor � Pass Test Etev Mat'! Dry Density ContEnt Der sity Cmtent Density i Compaction; SpeciftcalionI or No. Date ;Location or Structure D'agram Attached:i (11) Mark J yeeur(pct) L wpm(X,) (p O '(04) (pd) (%) (%) .- Fail 103Q 0 P-1 106.0 12.1 127.5 17.6 108.4 i 1 00 95 I P 26 5/24100 'LOT 5,BLOCK 3 : 27 5!24!00 ;LOT 4,BLOCK 3 1030.0 F-1 106.0 12.1 122.7 i 21.7 100.8 95 95 P -28 5124!00 !LOT 3,BLOCK 3 1 1030.0 F-1 106_0 12.1 124.7 23.8 100.7 95 I 95 P 29 5/74100 ;LOT 32,BLOCK 3 1034.0 F-1 106.0 12.1 124.8 19.4 104.5 . 93 _- I 95 P 30 --5124!00 1LOT 1,BLOCK 3 1034.0 F-1 106.0 12.1 124.5 18.5 105.1 99 I 95 P 31 [ 5/24/00 WILLOW VIEW CRIVE,STA 23+50 10300 P-1 106.0 12.1 121.2 19.8 101.2 9.5 i 95 P 32 51:5100 LOT 10,BLOCK 1 1 1031,0 P-1 106.0 12.1 122.4 24,5 98.3 93 95 F 4 33 5125100 LOT 7, BLOCK 1 10240 F-1 106.0 12.1 124.8 22.8 101.6 96 95 P 34 5/25/00 LOT 6,BLOCK 3 1031.0 F-2 112.2 16.E 129.4 15.7 111.8 . 1(0 95 - P 35 5/25/00 LOT 5,BLOCK 3 - 1031.0 P-3 109.6 14,5 124,9 17,2 106.6 j 97 - 95 P T. 36 5/25/00 LOT 4,BLOCK 3 1031.0 13-1 106,0 12.1 123.6 22.8 100.8 i 93 95 4 P 37 5125/00 LOT 3,.BLOCK 2 1031,0 F-1 106.0 12.1 126.6 19.8 105.7 1(0 95 P '. 38 5!25/00 LOT 4,BLOCK 1 10300 F3 109.6 14.5 126.4 18.0 107.1 93 95i P 39 5!25100 LOT 5,BLOCK 1 1022.0 13•1 106.0 12.1 122.0 20.1 101.6 1 96 95 P 40 5/26/00 SLOT 5,BLOCK 1 10230 P-1 106,0 12.1 122.7 22,0 100.6 93 95 P S 41 5/26/00 LOT 8,BLOCK 1 10190 P-1 106.0 12.1 123.5 19.2 103.6 93 95 P - 42 5/26/D0 iLOT 7,BLOCK 1 102.5.0 P-1 106.0 12.1 125.5 20.9 103.8 93 95 P 43 5/26/00 RETEST OF LOT 8,BLOCK 1 1035.0 P-1 106.0 12.1 126.419.6 105.7 1C0 95 P - i Lebo-story Compaction Method; Mark ydmax w,4,1 Mark ydmax _ w,,, Field Density Test Method: _j USGS Elevation Datum: X ASTA1 D-1557.79(Modified Proctor) _ ASTM D-1556(Sand Cole) T Depth Below Subgrade r. ASTM D-698-78(Stancard Prodor) X P-1 106.0 12.1 P-3 109.6 14.5 ASTM D-2922(Nuclear) X Depth Below Finish Grate Other P-2 112.2 96.8Other ? Other 513 loo 1:13 AM STS CONSULTANTS, LTD. COMPACTION CONTROL REPORT 1 FIELD DENSITY TEST RESULTS 10900 73rd Avenue North,Suite 15C PROJECT: Willow View _ STS PROJECT: 97439-A , •` Maple Grove,Minnesota 56369•554r LOCATION: Orono,MN REPORT DATE: 05/25/00 A.. 763.3t5.6300 FAX 703.3'5.1536 CLIENT: Willow view Developers,LLC TECHNICIAN: AS1RW "Srluriwu,krva#Science&Engineering` CONTRACTOR: _ _� _ Doboszenski&Sons REVIEWED BY: RCF 1Optimum In-Place In-Place ln-Plaoe • i i i Test Maximum Water Moist Water Cry Relative - Compaction Pass Test I _i Elev Mat'I Dry Density Content Density Content Density Compaction Specfcation or No. Date Location or Structure Diagram Attached:L _ (ft) Mark ydmax 1;pcf) w (%) (PCI) (%) (Fc0 (%) (%) Fail 22 5/24/00 LOT8,BLOCK 1 r 1035.0 ( P-1 l 106.0 12.1 122,7 29.0 _ 95.1 90 95 F 1 23 5124100 LOT B,BLOCK 1 1030.0 P-1 106.0 12,1 125.7 19.9 104.8 99 05 P 24 5/24/00 LOT 7,BLOCK 1 '022.0 P-1 106.0 12.1 ( 125.4 23.4 101.6 96 95 P 25 5/24/00 LOT 6,BLOCK 3 483.8 P-1 108,0 12.1 125.0 16.E 167.0 100 95 P _ 1 • I • , - I , . Laboratory Compaction Method: Mark Tenor woo Mark yew w",4Field Densty Test Method: USGS Elevation Datum: X ASTM D-1557-79(Modified Proctor; EASTM D-1556(Saari Cone) Depth Below Subs rade H ASTM D898-78(Standard Proctor) X P-1 106.0 r 12.1 ASTM 0.2922(Nuclear) X _Depth Below Finish Gradec. tither P-2 112.2 18.8 I ,CUier Wier _ . `'t5n&Oo 1:13wa .la 2225 STS CONSULTANTS, LTD. COMPACTION CONTROL REPORT I FIELD DENSITY TEST RESULTS 10900 73rd Avenue North,Sole 150 PROJECT: _ Willow View STS PROJECT: 97439-A Maple Grove,Minnesotr 55369-5547 LOCATION: Orono,MN REPORT DATE: 06/14/00 rr IRL._ 757.315.6300 FAX 763.315.1836 CLIENT: - _ Wilow view Developers,LLC TECHNICIAN:_ RSW "Sobitiwli!Jammer.V•ience h r•:ugin.-uiiirg' CONTRACTOR: Doboszenski Si Sons REVIEWED BY: RCF Optimum 1 In-Place I In-Place 1 li-Place . i F Test ' Maximum Water Moist Water Dry Relati,e I Compaction Pass Test . Elev MallI Dry Density Content Density Coelent Density Compaction I Specification I or No. Date • _ Location or Structure Diagram Attached: : (ft)_Mark ! Ta Pc1)X( . wopr(°4) (Pcf) (%) (PO (°b) (%) Fail l . 44 6/6100 :LOT 9,BLACK 1 1 1026.0 P-3 109.6 14.5 124.5 22.7 101.5 93 I 95 i F 45 6/6+00 ;LOT 7,BLOCK 1 I 1023.0 P-4 r 104.3 18.7 1176 29.0 91,2 87 I 95 F 46 1 616+00 IL0T 6,BLOCK 1 I 4020. _ P-4 104.3 18.7 120.1 24.5 96.5 93L 95 F 47 6/6x00 1LOT 5,BLOCK 1 . 1020.0 P-4 104.3 18.7 121.4 22.4 99.2 95 95 P 48 • 6/6100 LOT 4,BLOCK 1 1022.0 P-4 104.3 ) 18.7 116.6 30.0 69.7 86 95 F 49 6/7100 /LOT 1,BLOCK 2 1032.0 P-c , 104.3 18.7 1192 22.1 97.6 I 94 95 F 50 6/7100 LOT 2,BLOCK 2 , 1030.0 P-z 134.3 18.7 122.5 22.4 100.2 96 95 _P 51 6/7400 ,LOT 3,BLOCK 2 1033.0 ` P-4 1344 18.7 117.3 24.3 - 94.6 91 195 F_ 52 6/7/30 LOT 5,BLOCK 1 1023.0 P-4 1)4.3 18.7 120.5 29.0 93.4 90 7 95 F 53 6171)0 RETEST OF LOT 61 BLOCK 1 1020.0 P4 104.3 18.7 121.5 21.2 100.3 96 95 P ,, 54 6/7/00 RETEST OF LOT 7,BLOCK 1 1023.0 P-4 104.3 18.7 122.8 23.4 99.5 95 95 P _ 55 6/7/00 'LOT 8,BLOCK 1 1024.0 P-4 , 104.3 18.7 123,6 240 99,7 96 95p 56 6/8/00 RETEST CF LOT 1, BLOCK 2 1032.0 P-2 112.2 16.6 130.1 14.8 100 95 ~P 57 6/8/00 RETEST CF LOT 3,BLOCK 2 1033.0 P-4 104.3 18.7 125.1 • 100 95 P 58 6/8/00 ,RETEST CFLOT 5,BLOCK 1 1023.0 P-4 104.3 18.7 123.0 21.3 + - 95 P T ` 59 618/00 LOT 7,BLOCK 1 1024.0 P-4 104.3 18,7 120.7 22.4 95 P' 60 6/8/00 RETEST OF LOT 4 BLOCK 1 1022.0 P.4_ 104.3 18.7 119.9 29.3 32.7 95 F 61 6/8/90 LOT 3,BLOCK 1 1020.0 P-4 104.3 18.7 122.5 24.2 98.6 95 95 P 62 618/00 LOT 4,BLOCK 2 4 1030.0 P-4 104.3 18.7 126,3 21.7 103.8 100 95 P 83 6/8/00 LOT 6,BLOCK 1` - 1022.0 P-4 104.3 18,7 124.8 252 99.7 96 95 P 64 619100 LOT 3,BLOCK 1 1022.0 P-4 1C4.3 18.7 123.9 25A 98.8 95 95 P 65 6/9/00 LOT 9,BLOCK 1 1030.0 P-4 1C4.3 j 18.7 1 122.2 233 99.1 95 95 P Laboratory Compaction Method_ Mark -relax wwi Mark yonai: wool 1 Field Density Test Method: LSCS Elevation Datum: X ASTM 0-1557-79(Modified Proctor) 1 ASTM D-1556(Sand Cone) Cepth Below Subgrade • ASTM 0698-78 iStandard Proctor) X P-1 106.0 12.1 P•3 109.8 14.5 ASTM 0-2922(Nuclear) X jCeplh Below Finish Grade _ Other i P-2 112.2 16.8 P-4 , 104.3 J 18.7 Other Cther t r • t$39.007.1M 4445 tI14i001:56PM �� STS CONSULTANTS, LTD. COMPACTION CONTROL REPORT! FIELD DENSITY TEST RESULTS cPROJ10900 73rd Avenue North,Suite 150 ECT: Willow View Estates STS PROJECT: 97439-A Maple Grove,Minnesota 553694547 LOCATION: _ Orono,MN REPORT DATE: _ 06£29,00 763.315.6300 FAX 763.315.1535 11 CLIENT: 1Mtow View Developers,LLC TECHNICIAN: RSIV Solialoasfnremee Szmice h L•rrgiireerrrig" CONTRACTOR: ^�^ Doboszrnski 8i Sons REVIEWEC BY: RCF jOplimum In-PI.sce In-Place In-Place I i I Test Maximum Water Moist Water Ory Retattre Compaction Pass Test I _ Elev Marl Dry Density • ? Content Density Content Density Compaction Specificaticn or No. 1 Dale !Location or Structure Diagram Attached: ; (ft) Maik yemmx(pcf) ! wept(%) (pc0 (%) (pct) (%) (%) Fail 66 I 6/9/00 LOT 8,BLOCK 1 1025.0 P-t 104.3 E 18.7 124.4 19.0 104.5 100 95 P s 67 619/00 LOT 7,BLOCK 1 1025.0 P-4 104.3 1 18.7 1209 25.7 96.2 92 95 F r 68 619,00 LOT 6,BLOCK 1 `1023.0 P-4 104.3 18.7 123.4 20.6 102.3 98 95 P 69 619/00 LOT 5,BLOCK 1 1025.0 P-4 104.3 18.7 120A 39.2 92.5 89 _ 95 F -. 70 6/9,00 RETEST OF LOT 4,BLOCK 1 1022.0 P-.. 104.3 t 18.7 123.9 24.1 99.8 96 95 P 71 J 6/12/00 LOT 3,BLOCK 1 1025.0 P-t 104.3 18.7 120.6 21.2 99.5 95 95 P 72 6/12100 LOT 4,BLOCK 1 ^,T 1024.0 P-� 104.3 18.7 123,8 22.0 101.5 97 95 P_ 73 I 6/12/00 RETEST OF LOT t,BLOCK 1 1025.0 P-4 104.3 18.7 1205 24.0 97.2 93 95 F 74 , 6/12400 4F1ETEST OF LOT 7,BLOCK 1 1027.0 P-4 104.3 18.7 122.6 24.0 96.9 95 95 P 75 6/12/00 LOT 8,BLOCK 1 1028.0 Pl 104.3 18.7 1205 15.8 104.1 100 95 P 76 8112/00 LOT 3,BLOCK 2 1034.0 P-a• 104.3 18.7 124.0 25.4 98.9 95 95 P • • 77 6112/00 RETEST OF LOT 5.BLOCK i 1025.0 P-4 104.3 18.7 1223 20.6 101.4 97 1 95 P 78 6/12/00 LOT 10,BOCK 1 1032.0 P-4 _ 104.3 18.7 123.1 23.7 99.5 95 95 P 79 6/12/10 LOT 9,BLOCK 1 1033.0 P-4 104.3 18.7 1255 20.1 104.6 100 95 P 80 6/131D0 LOT 6,BLOCK 1 1026.0 P-4 104.3 18.7 124.0 23.5 100.4 96 95 P i 81 6/19100 LOT 11,BLOCK 1 1026.0 P-4 104.3 18.7 121.6 22.8 - 99.2 _ 95 95 P 82 6118/00 LOT 11,8_OCK 1_ • 1030.0 _ P-4 104.3 18.7 123.0 24.6 98.7 95 95 P ( 83 6/21/00 LOT 11, BLOCK 1 1034.0 P-4 104.3 18.7 120.6 29.3 93.3 89 95 F 84 6/22100 RETEST OF LOT 11,BLOCK 1 1034.0 P-3 109.6 14.5 127.0 15.6 109.9 100 95 P ( r i Laboratory Compaction Method: Mark yanas wept Mark Wax _ wept Field Dersity Test Method: JSGS Elavalion Datum: X ASTM)4557-79(Modified Procter) I ASTM 0-1556(Sand Cons) Depth Below Sub'rade f ASTM J-698.78(Standard Proctor) X P-3 109.6 14.5 ASTM D-2922(Nuclear) X Depth Below Finish Grade Other ( P-4 104.3 18.7 Other Other 1630c001.xrs 6E44 6r29100 9.:b N.4