HomeMy WebLinkAbout02-07-2014 - Re: TCO Christine Mattson
From: Christine Mattson
Sent: Friday, February 07, 2014 11:28 AM
To: 'Dan Toleno'; 'Nate Jurmu'
Cc: Melanie Curtis
Subject: 2325 Willow Hill Drive/#2013-00407
Attachments: permit.pdf; TCO.PDF; Escrow Agreement TCO 2013-00407.pdf
Hi Dan (and Nate),
Per our telephone conversation this morning, we have received the as-built survey dated 1-30-14 for the property
addressed 2325 Willow Hill Drive. As I mentioned, due to winter weather conditions our engineer cannot determine if the
grading that is shown in the survey is accurate of what was completed due to the snow and he's also unable to determine
if the vegetation has been reestablished due to snow cover.
Since a Temporary Certificate of Occupancy (TCO) has been requested, I have attached the TCO form which needs to be
signed by the owner or contractor and returned to us.
As stated on the building permit (copy attached) if a TCO is necessary in the event of winter weather conditions or other
weather conditions (which prevent the completion of the exterior improvements and/or an as-built survey) an escrow of
$10,000 is required. The City currently holds $2,500 in escrow. Attached is a copy of the TCO escrow agreement, please
have the property owners sign and return with a check for$7,500.
Please don't hesitate to contact me if you have any questions.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway Orono MN 55356 (physical address)
PO Box 66 Crystal Bay MN j 55323-0066 (mailing address)
952.249.4620 , a 952.249.4616
cmattson@ci.orono.mn.us ' www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
OUR OFFICE WILL BE CLOSED: Monday, February 17,2014
1
►` Permit a O
611 1• I • I ► l ►1 01 _ 11 owl 'INil
MIA °I 1 u1 a.
..ala._ i+dC .i:...
Permit#: I2013-00407
G ',slain PIN Address
Permit Address: 2325 Willow Hill Dr C Additional PIN Address
r Permit Issue Parcel Issue
Generali Fees Inspections(10)I Notes I Applicant Detail 1 CO Detail l
I •-•I on T 4.- Ins. •or Date Status H Fee Rec
o V].1 Radon Prevention Inspection VVGIB 9+12'2013 P Y 0
_1 2 Footing WGIB 6/28/2013 P Y 0
v 3 Poured Wall
v 4 Foundation Survey B/4 Framing CMAT 9/20/2013 P Y 0
v 5 Framing WGIB 9!19/2013 P 0
v 6 Insulation WGIB 10/1/2013 Y 0
7 Escrow Refund Requested
v 8 Escrow Refunded
v 9 Final
. 10 As-Built Survey
1
i-
i
►• X
Add New Delete