HomeMy WebLinkAbout09-27-2007 - sewer & water connections ik, 04?
O ' OCITY of ORONO
I ,\ 4 1$ ' v � ; titi Municipal Offices
+ ' G
t9 �`; a j ¢+ Street Address: Mailing Address.
$Esuo 2750 Kelley Parkway P.O. Box 66
Orono, MN 55356 Crystal Bay, MN 55323-0066
September 27, 2007
Keith & Vicky Williamson
190 North Willow Drive
Long Lake, MN 55356
Re: Sewer& Water Connection Fees
Dear Mr. & Mrs. Williamson:
This letter is to advise you of the various fees associated with your connection to municipal sewer
and water. The fees are divided into three categories: 1) City of Orono Connection Fees based on
the original per-unit costs of the individual neighborhood project; 2) City of Long Lake Connection
Fees based on the recently approved Utility Agreement between Orono and Long Lake; and 3)the
Metropolitan Council-mandated Sewer Availability Charge (SAC). The Long Lake and Met
Council charges are collected by Orono and passed on to the respective agency.
The connection fees are as follows:
$ 6,094.00 Orono Sewer Connection Charge
7,406.00 Orono Water Connection Charge
1,600.00 Long Lake Sewer Connection Charge (Pass-through)
1,500.00 Long Lake Water Connection Charge (Pass-through)
1,675.00 Met Council SAC (Pass-through)
$18,275.00 (Due with application for sewer connection permit)
Your contractor who will make the physical connection to the sewer and water systems must obtain
connection permits from the City of Orono prior to making the connections. Those permits are
$35.00 each. Upon connection you would begin being billed the standard Orono quarterly sewer and
water charges, per the attached fee schedule.
If you have any questions, please feel free to contact me at 952-249-4600.
Sincerely,
--1Ar. '. ---- ,i ''' ' /Z
Michael P. Gaff on
Asst. City Administrator
Encl.
Telephone(952)249-4600 • Fax(952)249-4616
www.ci.orono.mn.us
FOR CITY USE: ONLY
�, c �� v City of Orono Date,Received: Permit
`� P.O.Box 66
{ 2750 Kelley Parkway ❑In-House SAC Determination.Form Completed,
'-. t, Crystal Bay,MN 55323
'4, }t' 6` (952)249-4600 Approved By°(IfRequired):
CITY OF ORONO—SEWER & WATER/GENERAL PERMIT
(*Note:Some permits may require approval by the Building Official and/or Public Works Department*)
(ALL PERMITS- May be subject to further review and may not be issued when the application is received)
GENERAL INFORMATION
1. You may apply for utility permits by mail or in person at the City offices.
2. Mailed in applications are subject to the postage and handling fee shown below. Permit cards will
be sent by return mail within 2 business days.
3. Permits are not valid until you receive a permit card.
4. Work must not begin unless the permit card is available on the job site.
5. Utility connection permits may be issued to licensed contractors only.
6. Contact the Public Works Department(952-249-4600)for utility stub as-built locations.
DO NOT EXCAVATE IN ANY STREET AND DO NOT TAP ANY MAIN without express
approval of the Public Works Department. Issuance of a permit does not grant this approval.
7. All work must be done in accordance with State Code requirements.
8. All work must be inspected before it is covered. Call(952)249-4600,24+hour notice required.
TYPE OF PERMIT
(Check All That Apply)
®Residential(May Require Approval) ® Commercial(Approval Required)
® New Connection ❑Additional Connection In Re-Connection 0 Repairs D Disconnect
Job Site/Owner Information:"
Site Address:
Owner: Mailing Address:
City: Zip:
Home Phone: Alternate Phone:
Contractor Information:
Contractor: Contact Person:
Address: State License #:
City: Zip: Expiration Date:
Phone: Alternate Phone:
tY Y1� �+ +;: ? 9! � � �,'�t.
moa °' an�x
❑ SAC Charge(2007 Rate=$1,675.00) $
(SAC Charge must accompany all sewer permit applications unless prepaid)
(Orono City Staff can determine if applicable)
(If not prepaid,a sewer connection permit will not be issued)
0 Sewer Connection/Disconnect/Repair ($35.00/Per Stub) $
Pipe size inches;material Schd 40 air tested; cast iron
❑Water Connection/Disconnect/Repair ($35.00/Per Stub) $
Pipe size inches;material Schd 40 air tested; copper
1. SUBTOTAL of Permit Requested: $
2. STATE SURCHARGE $ .50
3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50
4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $
ADDITIONAL INFORMATION—WAFER METERS
• WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit.
• WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon
completion of meter installation.
The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do
all work in strict accordance with the ordinances of the City and the regulations of the State of
Minnesota, and certifies that all statements made on this application are,true and correct.
Applicant: Date:
PUBLIC WORKS DEPARTMENT MISCELLANEOUS CHARGES
Applicable
Application Type Fee Code Section
Utility Service Rates-Effective beginning First Quarter 2006
MUNICIPAL SEWER RATE by unit: 1st $99.45 per quarter
2nd $89.97 per quarter
by flow: $ 3.75/1000 gallon plus
$ 9.37 per quarter per connection
Area#1 Area#2 Area#3
MUNICIPAL WATER RATES Navarre Hwy 12 Chevy Chase
Billing&Ready to Serve Chg $28.38/qtr $10.30/qtr $1030/qtr
Water Usage Rate $2.40/1000 gal $3.34/1000 gal $2.49/1000 gal
Unconnected Property Chg $28.38/qtr -0- -0-
(ready to serve/hydrant dig)
Fee
Federally Mandated Safe Drinking Water$ 6.36 per year on second quarter billing Res.#5492
Testing Program
(Charged per service connection)
Quarterly Service Charge for Non-Functioning $50.00 Ord.218,2"`'Series
or Inaccessible Water Meter
Bulk sale to Minnetonka Beach for Lafayette Ridge Area-Area#1 Rate
$28.38/qtr billing charge plus$2.40/1000 gallon total flow at border meter.
Bulk sale-All Others-$25.00 per location plus area rate per/1,000 gallons.
i.e.Fill swimming pool or watering sod.
Penalty for late payment of sewer/water bills-8% after 30 days from
billing date(applied to the total unpaid balance). Interest at 8% on
unpaid water/sewer bills certified.
Water Turn-On $20.00 Minimum
Water Turn-off $20.00 Minimum
Water System Repair/Replacement if damage caused by property owner:
Labor-Current Hourly Rate
Paris-At Cost
2007 Fee Schedule—Page 25