Loading...
HomeMy WebLinkAboutclosing out this permit file and refund escrow Melanie Curtis From: Melanie Curtis Sent: Monday, October 25, 2010 11:15 AM To: 'Greg Engel' Cc: Lyle Oman; Christine Mattson Subject: RE: 2687 Wayzata Blvd Greg I apologize for the delay in my response. In order to close out this permit file and refund the escrow an As-Built survey is required to be submitted to assure compliance with the approved plans. The As-Built survey should also include details of the as-constructed concrete weir, and the reduction of the rip-rap area. Thanks, Melanie Melanie Curtis Planning &Zoning Coordinator City of Orono 2750 Kelley Parkway Orono, MN 55356 Direct Dial: 952.249.4627 Fax: 952.249.4616 Planning &Zoning Office 952.249.4620 Email: mcurtisCDci.orono.mn.us Website: www.ci.orono.mn.us From: Lyle Oman Sent: Tuesday, September 28, 2010 9:58 AM To: Melanie Curtis Subject: FW: 2687 Wayzata Blvd Lyle Oman Building Official City of Orono TO SCHEDULE AN INSPECTION, CALL: 952.249.4600 952.249.4625- Direct Dial 952.249.4600- Main 952.249.4616- Fax www.ci.orono.mn.us ................................................................................ ................................................................................ Office Hours: Monday- Friday 8:00 am to 4:30 pm ................................................................................ ................................................................................ Physical Address: 2750 Kelley Parkway Orono, MN 55356 Mailing Address: PO Box 66 1 Itrystal Bay, MN 55323-0066 From: Greg Engel [mailto:greg@spensagroup.coml Sent: Monday, September 27, 2010 3:41 PM To: Lyle Oman Subject: 2687 Wayzata Blvd Lyle, Per my voice mail this afternoon, please call me to discuss 2687 W. Wayzata Blvd. I am looking for documentation of final approval from the city for our work there and return of the deposit paid in connection with the attached permit. As you may recall, our neighbor to the east initially objected to the design of our retention. Subsequently, we met with Maurice Wagener and Peter Johnson and agreed on modifications to the our design. Mr. Johnson circulated a letter to that affect to both the city and the city engineer in November 2009. 1 just want to make sure we are 100% complete and have the appropriate documentation in our file. Greg GREG ENGEL SPENSA DEVELOPMENT GROUP, LLC EMAIL: GREG@SPENSAGROUP.COM CELL: (612) 325.5824 OFFICE: (952) 404.3381 FAx: (480) 718.7658 MINNESOTA OFFICE: 601 CARLSON PARKWAY SUITE 350 MINNETONKA, MN 55305 ARIZONA OFFICE: 10446 NORTH 74TH STREET SUITE 150 SCOTTSDALE, AZ 85258 2 LAND DISTURBANCE PERMIT It 90047 - DD f A.D. ESCROW AGREEMENT AGREEMENT made this or, , day of<<lc/�Y 2001 ,by and between the CITY OF ORONO,a innesota municipal corporation("City")and L_1HcF �RapEtL'rl6C, u.cr ("Owner"). Recitals 1, Owner has filed a Land Disturbance Permit# 9-I.RX formally requesting the City to review the Surface Water Pollution Protection Plan for a project located at.,. 2.#r*- &4A Jhe "Subject Property")as more fully shown and described on Exhibit"A"attached hereto: 2. Owner requests the City to review said plans which requires City approval requiring review and approval by but not limited to the following City Staff: City Engineer, City Attorney,City inspector and Planning Staff. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 'E. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owner shall deposit $ with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost In administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (Including planning, engineering, or legal consultant review) Land Disturbance Permit# ,4 - /ate , if compliance with the approved Land Disturbance Permit is not accomplished within the allowable time period,the City may bring the project into compliance by use of the security. 3. RIGHT OF ENTRY. The Owner hereby grants the City, its agents, employees, officers and contractors the right to enter the property to perform all work and inspections deemed appropriate by the City in conjunction with the required erosion control measures, including but not limited to constructing or completing any and all of the agreed upon improvements should the Owner's contractor not complete those improvements by the date specified herein. 4 MONTHLY BILLING. As the City receives consultant bills for incurred costs,the City will in turn send a bill to the Owner. Owner shall be responsible for payment to the City within 30 days of the Owner's receipt of bill. 5. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owner does not make payment to the City within the timeframe outlined in #3 above, the City may draw from the escrow account without further approval of the Owner to reimburse the City for eligible expenses the City has incurred. The City shall notify the Owner of such draw and the nature of the expense for which the reimbursement is being made. If the Escrow amount falls below 75% of the original escrow amount the Owner shall deposit additional sums as directed by the City, or the City shall discontinue all review. 6. CLOSING ESCROW. Any remaining amount of the financial security deposited with the City for faithful performance of the plans and specifications and any related remedial work will be released after the completion and inspection of all such measures and the establishment of final stabilization,for the permitted site or common plan of development or sale. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owner, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: CIT r OF ONO OWNER: ' By: By. Its: Its: l STATE OF MINNESOTA ) )ss. COUNTY OF HENNEPIN ) The foregoing instrument was acknowledged before me this day of 120 , by , the of the City of Orono, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. Notary Public STATE OF MINNESOTA ) )ss. COUNTY OFHENNEPIN ) The foregoing instrument was acknowledged before me this day of . 20 , by the Owner. Notary Public STATE OF MINNESOTA ) }ss. COUNTY OF HENNEPIN } Q v This instrumen wa;acknowledged before me this 30� day of l.1! 20, by rr (nam of officer],the 5c� ✓+rte" j ✓ a 5 u (title of o cerj of ' r L [enti 's name], a i m N 2sa l.i►'v► # �a� L, [entity's designation, e.g. a Minnesota corporation), on behalf of the' +,, a G [entity's de ' naliz=Lthe Owner. PATRMNKXM dowry EV. W comm.Exam EXHIBIT "A" LEGAL DESCRIPTION LEGAL DESCRIPTION: That part of the Southwest Quarter of the Northeast Quarter of Section 33, Township 118, Range 23, Hennepin County, Minnesota, described as follows: Commencing at a point on the South line of said Southwest Quarter of the Northeast Quarter, distant 1089.37 feet East from the Southwest corner thereof. thence North to a point on the North line of said Southwest Quarter of the Northeast Quarter, distant 1086.69 feet East from the Northwest corner thereof; thence West along said North line 200.02 feet to the actual point of beginning of the land to be described; thence South along a line parallel with the first above described line 440.94 feet; thence West parallel with the South line of said Southwest Quarter of the Northeast Quarter to Its intersection with the West line of the East half of said Southwest Quarter of the Northeast Quarter; thence North along said West line to the Northwest corner of said East half of Southwest Quarter of the Northeast Quarter; thence East along the North line of said Southwest Quarter of the Northeast Quarter to the point of beginning, according to the United States Government Survey thereof and situate in Hennepin County, Minnesota. f I 27�! i�11� ParkxaY 11roroo "N 53% g52-�2.�9�ib(A I: • Rm,ei pt So: 3,001068 kg 06, M i Ung WO properties LLC ppmits I I 2005-00460 2687 wayiiita 2,OW.00 B).Yd Defsrred Rev-DPvelaper WDWit.. _ 4 Total: 00 Check OW.01) Check Mo: 215 , L Lake Properties 11.0 ow.Total A")ted: + _ .00 Change Tendered: .�_�. _ 00 06f46ro9 o7:S1AtE '1