HomeMy WebLinkAbout2017 Landscape Plan��Pv
ORO��
Haul Road
Haul Road
Plywood & Fabric
Driveway Entire Length
'�:TE BY JUNE
Existing Patio
Unit 3
1�1 Elyo]��o
�— I
3 -Shenandoah Switch Gross
3 -Blue Arrow Juniper
I T
8 Sprays
0
8 -Zagreb C'oreopsiq 0 0
1 -Dwarf Globe Blue Spruce
O -Prairie Dropseed Existing Concrete Path
-9-Ruby Star Coneflower
9-/A,utumn Fire Sedum
0-Garodonno r-1
nit
R -a'
Series Kamado
0
X
CHI
Deck By Others
Limb Up Spruce Tree
JY
Sprays
— Column (6)
nenbo'Urn Pine
C-)
Fireplace By Others
/3 -Purple Candles Astilbe
RAA1Kl-rA1KI QIAIAI E:
THROUGH MULCH BED
1-11,
4 Rotors
(3 -Little Gold Star Rudbeckla
Spirea
I oRONo CUP,
RECEIVED
APR 10 2017
CITY OF ORONO
Scale DESIGN/SALES REP: Josh Koller
1°=8'-
a
8'athew & Ana Carter DESIGN ASST.- Jonathan Schwartz 2383 Pilot Knob Rd
Date: 4/6/17 Mendota Heights, MN 55120 Est. 1978
Ba s e m a Time: 2:51:32 PM Phone: 651.203.3000 OUTHIVIEW
File name: 2017 02 09 Carter Landscape.vwx Fax: 651.455.1734
1 Lsouffinviewdesign.com D E S I G N -t -
This drawing contains proprietary information which Released By: landscape contractors
1006 Wildhurst TrailMound,MN55364 belongs to Southview Design Inc. Any unauthorized I Date Revision Notes M�o duplication or use is strictly prohibited. Date Released: / /