HomeMy WebLinkAbout2013-00343 - plumbing CITY OF ORONO
2750 KELLEY PARKWAY * 2 0 1 3 - 0 0 3 4 3
DATE ISSUED: 05/28/2013
ORONO, MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADDRESS 2725 WAYZATA BLVD W
PIN : 33-118-23-13-0019
LEGAL DESC CRYSTAL BAY BUSINESS CENTER
LOT 3 BLOCK 2
PERMIT TYPE PLUMBING(>$500)
PROPERTY TYPE COMMERCIAL-BUSINESS
CONSTRUCTION TYPE FIXTURES-MULTIPLE
NOTE: 2 WC
2 LAV
2 FLOOR DRAM
WATER COOLER
VALUATION OF PLUMBING 9500
APPLICANT PLUMBING FIXTURE FEE 118.75
ACI PLUMBING LLC STATE SURCHARGE PLBG(VALUATION) 4.75
4829 MINNETONKA BLVD
SUITE 203 TOTAL 123.50
MINNEAPOLIS,MN 55416-
OWNER
Orono Mini Storage LLC
6851 FLYING CLOUD DR
SUITE A
EDEN PRAIRIE,MN 55344-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for ap riod of 180 days at any ti m after work has commenced.
The applicant i esponsible for assur required inspections are
reques ed in formance wit tate Building Code.This permit may be
re a at ti r cause.
S /4�? i l--
A ermitee Signature Date Iss By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
I
FOR CITY USE ONLY
�O�T City of Orono ( 5 Q _ o3
i V P.O.Box 66 I Date Received: 1 �ermit 4 l3
0 2750 Kelley Parkway
Crystal Bay,MN 55323 Approved By: "`' Amount$:
(952)249-4600—Main
(952)249-4616—Fax 111
yF �` CITY OF ORONO—PLUMBING PERMIT
l�KESHO�� (All Commercial Permits Must be Approved by the State Prior to City Approval
http://www.dli.iiiii.t!ov/CCLD/PDF/pe plumbp1anrevapp.P.df
GENERAL INFORMATION
1. You may apply for plumbing permits by mail or in person at the City offices. Applications will be
reviewed and a permit will be issued within two working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT
VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE
PERMIT CARD IS POSTED ON THE JOB SITE.
3. Plumbing permits may be issued ONLY to licensed plumbing contractors and to property owners
residing in the dwelling.
4. When any new construction or remodeling is involved,a separate building permit must be
obtained.
5. All work must be done in accordance with State Code requirements.
6. All work must be inspected and air tested before it is covered. Call(952)249-4600.
(24-48 hour notice required)
TYPE OF PERMIT
(Check All That Apply)
❑ Residential [(Commercial (Approval Required)
❑ New ❑ Additional ❑ Repairs 'Replace
❑ In Accessory Structure?
*You will need prior approval and may need CUP. (Per Orono City Code,Chapter 78,Article IV)
Job Site/ Owner Information: , I+Y2�jk ffdl-V
Site Addres (/
Owner:
0 04/0 P// ' Sr Iae6 Mailing Address:
City: r2/l dd Zip:
Home Phone: Alternate Phone: (,lZ' 'M,
Contractor Information: /
Contractor: G f �'�`�/'l`y Contact Person:
Address: "[ �l-1117� gb" State Bond#:
City: ✓ 10 Zip:O�'4 Expiration Date: (21�
Phone: Giz"����3� Alternate Phone: �l2�Z����3�
❑ Insurance— Current:
1
FIXTURE BSMT 1 2 N11 OTHER FIXTURE BSMT 1 2 No OTHER
TYPE FL FL TYPE FL FL
Water Closet 2 Floor Drains
Lavatory 2 Sewer Ejector
Bathtub Laundry Tray
Shower Washer
Kitchen Sink Water Heater
Disposal Water Softener
Dishwasher Wet Bar
Sillcocks Ntuallaneous
ffil
= y
❑ Yes,this section applies
The replacement of only one Residential fixture or ap lin ance that meets all three of the following
requirements:
1. Does not require modification to electrical or gas service.
2. Has a total cost of$500.00 or less;excluding,the cost of the fixture or appliance: and
3. Is improved,installed or replaced by the homeowner or licensed plumbing contractor.
Skip next section, if this applies; Cost of Permit $ 15.00
State Surcharge $ 5.00
Mail-In Fee(If Applicable) $ 2.00
Total Permit Fee $
(Permit Fees Continued On Next Page)
2
If above does not apply; follow guidelines below:
1. CONTRACT PRICE * is 1.25%of contract price with a(Minimum Fee of$50.00)
�a� x.0125$
(contract price) (minimum$50.00)
2. STATE SURCHARGE
x .0005 $
(contract price)
3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00
4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $
■ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the
permitted work including materials, labor,profit, and other fixed costs. It is the amount to be charged
to the customer for the work done. If any material, equipment, labor or installations are furnished by
the owner, tenant or any other party, the reasonable market value of such items must be added to the
estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the
amount of the job cost, the City may request the submission of a signed copy of the actual contract.
4n.'E4, ,rh .,a•. 4,
V- c"'�F.
MAOWWO OWN
The undersigned hereby applies to the City for issuance of a Plumbing Permit, agrees to do all
work in strict accordance with the ordinances of the City and the regulations of the State of
Minnesota, and certifies that all statements made on this application are complete, true and
correct.
Applicant's Signature: Date: ✓ J /
3
I hereby car Itry that this plan.
specification or report was prepared by
me or under my direct supervision and
that I am a duly Licensed Architect
E
DPJMWN 00-CONTRACTING RBOUIRIMM 01700.EXECUTION.RS EGUdUAS 2 Welded Ware Rma
ar(arent: ASTM A 1850k 185M,pain type under the laws. of the State of
A. Exa lemalm:.Before starting work venlythusubstatesare readyfa and capable of 3. FabriderandRelntorcement. Conpywith ACISP-66 Minnesota,
00600-CONTRACT FORMS supporting Subsequent woK annotation by Seller is compete,specific axxeaons D. Concrete Metedah:
Edward A. err
A wner
O -Compactor Agreement AIA A107,unew otherwise ad tuned determined between described=at ned utilities areavanable.Verify that Wlity dmractenstia of 1. Carrot ASTM C.150,Type I-No mal.
Owner and Contractor. KpMwtammnpatrbewmutssninsMsed Vmfy that field dmersans that would 2. Norval Weight Apprega0es ASTMC33.
B. Paynmd AppNcati rc: AIAG702wnh G703Sdedulea Values affect ireteuaren ere as regura0. 3 Water <leaneantimm entaltecarkiem. 4/19/2013
f C. Change orders AIA G701, S. Preparation: Condbe�
t pnsWWbon rteeings mfanmianza intention and others 4. AitEmrairmu"
m: ASTMC-260,5%, forasceo
espondfreeaV Date Reg.No.16362
D. The Parses: affected With ismoedures forinsWk wand bc, an after Satellite-lay outwork temperatures. Project Manager
1. Owren: Coto Mur SDuage LLC,doe Creno Metro Self Storage.and as Penney,M accurate location,ares,and levels.Before xarting work..prepare E. C*--"-'
mpresemavw. slbstralaui and snMdes tyclearing and patching as reqed
■red,and as mod mred by 1. Npnnal Walgt Cararete: Proportons t campliancewithACI 211.1
2 Contractor StekerCdratmctlon Services maWaduwafpixWtobeinstdod.Rem debmfmmsre ofinsWlaloh.Before mcornsroe KW*M 4,000psooffn veelmrijtN.i,mhurn. Averararedfor OCOPykIGNT 2013
Starting tinkering work.boom andvawunclew interior spaces and continue clearing - all exterior wont
OWN-CONTRACT DOCURMUS as required to estimate Wit. P. Placing and Finishing Concrete I hereby Certify that this plan,
A. Arwhhechrta PMns&Sp"McsU rls:Thmdmwings&qp.by EFA.. C. Execution:.IrMW products in mother tyeafed ate as motored w recanmended by 1.. Fatenchw24inermwhle.rem.mflawe thtvue4baMornbhious, For specification or report was prepared by
E SbmWnldxunuMmOm -pm4e4fon Pwhm&nark Engn rg,peaally rnanarwlurer;9manfacturefs instructions caNkA with comad documents,request torchnwidvman24irche%mriaoew9h6x6VAVR. Plaaemminegin me or under my direct supervision and
imigrted Into the Architectural pan for Owerscarvenlence. caMlcaaribefomprocaedrg, CmpywMspsdnedsMndsrtesomrimunquality, aacondaricewith ACI 304R. that I am a duly Licensed Structural
C. 9lorage Looker dlveum.nte(tor rtemnceJ:Owner-provded from Janus lro except where more stringent kxearsss brother Specified requirements indicate higher 2 Race Rrsshcarcrelefwflmsiabeinacaoda ,MAC1302.1R. Trowel Engineer under the laws the State
standards or more predse woeneanip.Have work pedamad b/perwm quali lea M deep groom control jams aaow trench Wal)at exrearg axxrd jams in adjacent of Minnesota.
DIVISION 01.GENERAL REQUIREMENTS prodreespacifiedgnaliq.eaten product,fsonum and fiange level,wally t,idardtand shat,
John Paul Gills
in coned Wagon,worth erces speared,If skisty alignedea
,and rulged with ch other O. Curing: Comply withrequvfemerasoACI 3058. km ciaWV after pMe ret
ortWe
01100-SUMMARY and with finish halt Where subsequent wok a&en previous worK replace and prated amcWefrom premature drying excessively M or odd temperatures,mrd
A. Su e-wir*fMbrk:Paw 2 of line remodel of an existing dMde-vnreMusa building,to n6rwh previous work M amd owxftn Oa ret pen nvUV enclon waSO imons"el injury:MertWn protection lex not lew than 7 dsys We 4-19-2013 Reg•No.21476
became a Sell Storage Malty. materials,debns.or rubbish inflnished work In hashed areas.cors al pipes duos,and
1. Linef Space: StaeW,Mabntel--MOcagarwv Type S-1. mnrgwminthecommb orluseadherwowirdic= Senug
eodw-leinpace DIVISION 04-MASONRY
2 Building Comanictiom Type II.9,dem-hems.(non-epmnkierad). with pica dive anchorage devices deigned and Sled to wMM d rwwraoy
S. Work Restrictions:Comply with Owners Rules and Regulations amunirg to artidpaWxe Rada,Slmwes,vibration,and datontan. 04000-UNIT MASONRY
Contractor parking,work hours,twin/dust/odor contig and access M the panics. D. Pansbudng Rana: Cutholes in previous and a alu g work in required to fit crew A. Preparation: Can should betaken to~demdiening eawrgtnasomy;became
Then oWl be no Smoking within the puking. othe uses,indceted.Coruel hobo in flnislued want;use esucheonS umw,of erwlw (amulet with oWrg mwofry design;prwMe appropriate Shdmg and proteesys AO 1 CPF('.1 F i('.A7!(INC, SFV PI AN
C. Work by Owner:CoordreM wope and insWMbo t Schedule with 0,wrar. indicated. Fa Fueisated Assertdim,awl opmhp amud oe bom as specified in-
1. Taepha dna Dna Lorvoltage Wirhg,iMIL4Mfacepees. Cnknngof 007600. Fa Sound-Rated Amerman,pack openings arced perstratimS with S. RYnfamor ret AO-2_SPECIF_ILAIION'; S.CHFOULE.S
telepare,date,aura service fon an authorized provider. nmmrbushble mKt aL For Cow Assemblies make airtight sale around openings t SMMero Relfadrg Bars: OaommQ ASTM A 615:A 615M,Gmde60. A2 1 C NIT RUC T ION PI ANC
2 Security System I openings have been made toolarge,patch veth homig metaals to original 2. Hor .adwilt l Jan Rsdorce nett: Ladder type,ASTM A 821A a2M steel was,hent dip
3. Storage
n Loclaw System.(nate.the system s 8 R tate,without cam aJ co dulon before awa en
missing covering galwenzed after fabm
fabrication to ASTM A 153/%153Lk Caw S;01483 inch side ton A _..__.._
4. Furniture, E e,Furnishings and EqupnenRemodeling Boating Work When newworkabua edssngwork,elignwtew orK,wnh With of 483 inchcrww;oramoth n required o provide not more than 1 inch and A3l I O(IF TAI I S
_PLAN__.__......__.....
KER.F T
5 Sil7age,bAh stem and seem smoothed even therrdon, Whem existing frreehed won,m cu So that a Smoot not Ice ran 1/2 Inch d month beverage or each exposure.
E Deslgn/6uad Work by Consadar, transition with new,wok a rat possible,temmme=a"work sang a mug lore at a C. Mssomy McMriste:
1. Mechanical-HVAC Heating and venMation for SMnge amt,designed to campy netunl evasion Wave a isf rgwoM is to W refir ismal,finish w specdled all visas. 1. Concrete Mawnry Units,ramal weight ASTM C 90,nvma weight 8 x 12 x 18
wmm'ae Wetted spike requnemems a
Carbon mwxde detection and exhaust eafacomspeequtessar-sanMWted WMa
re"llspartMreremM ro
aamoadinches mina:special Yan indicated,
indicate ..... __...._...__.._..._
_..___..___
Wf fa d&.n it. cantina adjacent epodes,r.fi-hweif,cefl g4 who loons In alkene tined the spaces 2. Mortar am Girt:Parham Camera ASTM C750;TVP 1:Mooed I,-ASTM
2 Mechanical-Funoing:Hot am cold Poteble weer.wdtary sewer,Plumbing forsimlar appearance;it a shicom,in-pane InmNon bath-axmoea is not possible. 0207,Type Q Maar Aggregate ASTM C144:Grafi 4ggegamASTM C404. ._.--__._-._-_.-_.__._......._...._.._
Mdues;nature gee and roof drainage. obtain instructions on prowedrg. Trim wood docs tie neceSaey todear-,v icor 3 Water'. Clean am not detriments]M concrete.
3. Fire Protecson-ria risen. D. Installation of Mnonry, ___..-- _
4: Electrical: Electrical power,lighting and rim/lite safely systems Lmwd aga F. Cu"and Pawing: Cut new,and existing work in little as fossiba,using 1. Lay riew namrvy nits in hag-bond pattertr,ar match exetingwaltbmding pattern
seamty,AIV,or mnminkaaos systems:only it specifically ngueSted. appropiate fads 010 do n firth damage as Paul opMin expert asasarice for if different Reirforae per the Structural drawhgs
5 Conracmrswsigrwork Shall induw all necessary engineering and preparation of maemissaatketo cup g Structural and Work-Obtain approval Boor to cutting.. 2,. Locate horizontal joint reinforcement some the first aeras•.,ants every two courses
pl remaxadac wnh OwrersnequnmSxsand AHJ. CingNBuldemshall Far Fre-Rated Assemblies,awl opeag6 around lxkWmtiors n Specified in 07800. orl6inctesvapcalythersai Loe MraNacmanbaningWedoeUm
not propaw a vmumefrom axawdh=wntenautranmoontrom Clrtar.As-bur PatchnewwokatacutWi%tospedledcaKfrdmnawgspmrmdmawmts,patch accordance mth the structural druengs .. -----
pars am required at the ate of construction,prior to appkakonof final paymenta iming work to aigirsl a matching-linin Finish Surface.-Match anjacent fico 3. Clean masmaji work after completion with approved tli,arsrg processes
F. Projxt Phasing: Confirm tltisscope nim Owren. without vauae differences. F Patching Submit Mn rr.
1.Phase 1-(Completed)Remodel work to allowuw and occupancy of the north pert 1_ Torching g of Concrete gab on,Grade-Sdsmt'Trenching Plan La)autfor wim. 1. Patch all ahandoned pe utnao s;through existing motor walk incomi ng but not
of the taMdmg gxM orgridre M),aswell nMM irtTxa ems do In addtiort meentwe and apptova portaalong C t slab in*wgtt Inc;mm Wmh w w limited to,abandoned mecnarical/electrcal/pumping openings broken or
building wit get a new heating Iventilation system,wow repairs,nevvextenorinntfooling Remove aStdcsiand Save for oepacenan Ater.Ceefuly ctvapor resroe damaged uockaas,and neraval of abandoned embedded f biau-in items
stoops at designated mamas,and other seed de,wlukm and repair work indat ed an tee lengthwise M cods of Iranian,and praM,t Excavate trach to required F. Patching Interior Masonry.
the.da wings.This phase a ,included the axnsttuction of a temporary edit hahvey depth,wmestablydng shasof brach cut After new,piping iretaled an compacted 1. Patch all emtrg holes and cracks with mortar,but ma it-all refired memory
Room 106 at grid MA. tench boron,backfin with ewcivated Ritmo!and comped every 12 Inches antra joints.ff ceWr wistatricies mu for alternative patching matoMls,consult
2 Pines 2-Ttis project remodelworkto allow use,and occupant'of the middle part of vertically to 98 percent dry y dsity.Clotheand vapor retarder sheat tack Architect for approval,
the budding(south of"We M and north of grams H).Thiswvn would include the new, together welt compatible tape.Innis ealenuan rows paradel Mat edge Replace 2. Masonry fax shell replacement is not mecnsafily negtred cosmetimtly speaking.
pbac'a&
-are ben-gnia,.J&'K the new loading vewixie Room 118 with its sad cumin including any that may have Mien away adjacent M Web cut,and Canada may choose this method it ease than spa rewas a 9 srudxxaby
door 116A,mus itlOn d re temporary on harm y Room 106;and final lighting and compact to 98 percent dry density.PaYslab back flush vAth floor in accordance required
fences for res part dthe
puking.Thea phew also includes relocation of telephone with Sher baring Structural drawings,or in Waeroe dared,to mono depth wwhat 3. At window]amts and Will.,hall maaany w misared M Wmitle a Sable,tush
demark locapat mlactim of row dram Nader wit 9nd HA,the unit of one mdewed was+er ad L-g 4,000 Psi armee Cut contra!lana not day at kdaiore surface for the Subsequent application of fro plywood Imm specified In Civ 06.
loading dock berth bebween gads H&:I and replacement of aclacent overhead door mere adjacent Slab lams 90 dvmgh the ratted ales Remove any masenry protrusions that would poretit the installation ofthe plynod
1189. O. DanalISon:Sw Drawings fa extent or mmdval requited In addition: 4. Perching qJW ty levo Shell be to an Ymhxha grade'level only.Patch So that emre
S Phwe 3-(Not In Contract)Remodel work to slaw use and occupancy Ara South 1. Cut portions Mhe nrnoved neatly;cut flat surfaces an sbaight Imes Dom sudacem neladvay Smooth and pairdabe,Ater which-open cracks or roles are -------------------
part of the building("lith at gndire H).TNS work would include the new baring a lager atmrauralmembsm ply abahg. IJw temnquesampatible with viably widentfrom a viewing chaeta of 5feet and mesony to a M red have
vespbuts with its doom,and final Hoang and finishes for this part of the building. Srbeequant patching patches protrusions or Indentations greater than''/.roan
2 Remove abandoned sump pump,pt and related werhead dsinhinn,fon the
01=0-ADON19TRATNE REQUIREMENTS loading dock tea gid H-6. DIVISION O6'METALS
A. Subm tteeL Submit M Cohere 101 Anthem(A].and/or Structural Engineer(SI as rated 3 Remove abandoned k-Rage caping if pia terms left behind.
below for review&approval,after review and coordretlon by Contractor. 4 Asbestos and Asbestos-Cordanrg Materials. If dswaeat-*Landlord Landlord Then OUN-METAL FABRICATIONS
1. Structural fabrication drawings,if any.(A&SI 0 au diard ed,remove completely,Wig paba tires compyingwith 29 CFR A. MiscelMnwus Maas. Sten Tubirg ASTM A500,Grade B cao4f wedsb c rat �I1�
2 Fnshwmplesfawrdd
selection. 1920.1101 and State m regula0atubing Steelseddha;AA36rA38M. CODE REVIEW:
3. Millwork Mtrcstioo aamrgS,it atewe
.[A&OI S Lwd43d Point: V dscoveed notify Landlord Then a authorized,remove S. Fmricatlam:
4. HVAC pane and calb twora in compliance with MN Entergy Code.[0&A] completely before recasting using procedures compAtng with 29 CFR 1926.62 and 1. Protective Pipe Sonatas-6 inch diameter,comes.filled stnl pipe bdlada
5 Plumbing fixture Schedule and catalogue sheaM[O&A] Sete and kdMregulwaa Exterior kagtlaa within permit Stan Shall extend 48 inches below grade ad be at EXSTING BUILDING CONSTRUCTION TYPE: II-B
6. Elecanodpara,stdwmng new and existing electrical work(0&Al N. Cushing: During caramrwan,keep won arca heeorwaae maenala,do",ad in 24 Inch diameter Sonctbe foundation Mnn.lntetawcadona an cdrerem slabs OCCUPANCY CLASSIFICATION: S-1 WAREHOUSE
7. Ugmng para and eahxteeora in compliance With MN Energy Coos.[O&A] rbtiert Remweternporay labels.Mena,and pore Fml Clemngira s an grade shad be fabricated wrote a 12 rich squam z;5 inch thick bow plate,fury 70.834 SF X 1 OCCUPANT/500 SF = 142 OCCUPANTS TaIOG,Jin imigde[anw ',1::1519¢iSWe)
S. Light fixture scradua and catalogs Maefa.[O&A] 1. (lean interim and mtem sumcw d M exposeview. welled o Wile pipe bifihi four expewwn bolt.and-nig M
floor oD fdm R.I.R.Mtn,vw>, !ilio-9:r W:titGS
9. Firestapping more it catalogue sheete[Aj 2 Polish traMpaent and glossy srfatea 54174 .wuniL..sw:h.c,nm
S. Schedule.Submit and update periodically throughout the project as waded 3. Vacuum dean carpeted other Soft surfaces:proorn clean other Boas. DIVISION 08-V4000 AND PLASTICS
4 Clean equipment,dean filters,arid clean wakan. PROJECT CONSISTS OF INTERIOR REMODELING OF EXISTING PAULSON&CLARK
01400-QUALrrYREQUREh4ENTS 5. Clean light tuba and lappa 06400'ARCHITECTURAL WOODWORK ENGINEERING,INC.
A. Gopal Compl Wee: Campy Wh MI o Mre codes,ardnancw,laws and tial 6. Broom own exterior proved ares;mid dean landscaped amt. A. Rough Carpentry.Provide heated wall docking beh xt kdet ram accessories gab WAREHOUSE SPACE.
requirements administered by the Authority Having Jurisdiction(AHJ). Rensw and I. Starting it ting Equip.wand Sysare: bars and dnhe u wall mounted!ars as remm(X ate in homer eemed below 2352 E.County Road J
abide by Owner's Ruw and Regulations. Rokrw plansand specifocanoheror t Before Haag verity that egtpment or syMen has bon popery installed, 1. Window Trim in Storage Amn-provide%Inch pyrcd prukkaa presw,ative Whim Bear Lake,MN 55110
discrepancies with compliance reqummenmand promptly declaw ronmmphintitems lubricated,and adjusted efimnteg conditions that might came,damage Verity crested,grade AC,around all rough masonry opersrgcs at windows.Fasted to Office:(651)407-6056
to ArdMea and Owner. UWpmpouMyaxnxdbaalawebeenmmbcwecOV. Venytatelednoal mawmyiamtsadaew•atimepammanMme me . PLUMBING FIXTURE COUNT: (FULL BUILDING CALCS) Fax: (651)407-6476
B. Flee CSM Compliance:Special attention gall be dreaded to to following compliance cmacteeaos,rear readings,and test resets agree with those required by.the 2 Well Pretecdon-provide Y Inch trick plywood walracoon7 on drywall persons Email:pae(apaulsmclark.pm
home equPmes or system manJwNnk, subject to cart impacts,whore indicated an the disuings. wass
1. NorCombuMibs Construction,Combsablw xml rot be incorporated Into the 2 Execute tu
e sat-up in accordance with mmaaurers instructionsinstrinstructions.o ,under witeviaon GROUP S-1 - WAREHOUSE
Work,union spebficaty allowed by the building code or AW.Return air plemms dappoplale.Cosgn-Bukerpemrset Whereappropate,reuirepesence DIVISION 07-THERMAL AND MOISTURE PROTECTION 70,834 SF X 1 OCCUPANT/500 SF = 142 OCCUPANTS
above susperimal ceilings stall be free of all continuities. add supeevisan of memtawurers representative.Operate far sufficient lime M
2 Fim-Rand Assembles:New and ekistingfire-restive aw blies won as fire Mdw,proper,functioning;test ate aquM fa proper opemtkrn Submtwrltain 07600-ROOFING 1 MALE / 1 FEMALE Steiner
rated parMom a.dahm summ
p be cpliaevaar h mrequirsdandlor existing U.L repoWp
t of s - . a.- Roof Cumd P
ngaracNrg: 1 FIXTURE REQUIRED PER 100 OCCUPANTS EACH v:.orbev.,,...t
fixing New Fire-Rated Assemblies stall Follow,the specified U.L listing 1. Remove sill rod penetrations,patch metal dec;,and roofing to nWort �+�tuMUVu�.�+M�.�•
TOTAL PROVIDED 2 MALE AND 2
requirements exedly;orCOroata may substitute an alternate U.L Axed 01730-CLOSEOUT SUBMITTALS exismg assembly. FEMALE FIXTURES
9 t
assembly pr Section 01600.Note requirement forsubmiralof Tested&Uxed A. Operation and Names nide OsM: 2 Cut.new openings for HVAC,Plumbing or Electrical work In and accordance With 3614 Courts'Rood 101.ty .ate MN wS.aares'ca`p
m
Fire-shopping tshes.uwdaoudpenetmtera 1. Provide product information.prevetlemaintenance mcommendatiom, Owners requirements and Roof Cmaurart'sreromriensationsPawninand flaoi TWO (HIGH/LOW) DRINKING FOUNTAINS ARE PROVIDED (952)473-5650 wwwste
3 Fire Extinguishers,Portable fire extinguishers may beinpiece mthnthe promises. rnanufxtuefsreplaceadepaMlist non.and-ofrecornnenwxftable. watertight all new roof curbs,stack boasand pipe pendnbomper NRCA ONE SERVICE SINK IS PROVIDED Client
Irryare,an Im AHl aboultre read fix more,or difeert types of;fire extinguishers Iuarcenl8 and supplies rewmmendaWre.Replace balwt eve y. ORONO MINI-STORAGE. LLC
bwedupon the use and occupancy d the space. Provideekinang gultimmand 2 OpenEquipment Assemblies,and Systems:Prepare project-specific data. PHASE 1 COMPLETED
abireteper Section 10520and asdirectedbythe AHJ. nxtudingfunctio�descimUort,natalopewngcamaerisacs,Omaing 07800-FIRE AND WAOKE PROTECTION 8851 FLYING CLOUD DRIVE
C QuaRyCcntra: Pedp reguredfWdtestngaMlmpecWnrequm bycotl n conditions;dagraisand cow data Reperedduring dWeghthat shoxahow A. Flresroppigg; Seal spaces around Pon,conduila,and ducts that penetrate fire rated REFER TO EFA DRAWINGS ISSUED 4/16/2012
Spedfled. Subm wrmen report d eat teBVnspecdw;iroude cimpele deans ef system are intended to operate.Sequence of operation-stalled wring and wens;partitions,and goon Wig assemblies having equal or greater fire ming We the EDEN PRAIRIE. MINNESOTA
axxfitom,methods,and results Provide wpermeon of the Work throughout the cxsrd dagranm elemertbang penetratedwhen tesMd in acconledm WN ASTM E 814. ,Jed ary / U
poject M nese caVomarxe with project reguremerts,quality and wohumesnip: B. yyamnour. Execute in dapkate,rdsnze.and markRh applicable spececation manna that is UL Beed forthe speclho construction.type of penetration,and fire Bang.
Coordinate effectively mth subcorbadon,vendors,suppliers Owner and Architect M number, Protect Location
maaga ref rutip activities In■poewaW and organized manner. Marcam and 1. Cereal Warrant':Provide ore year wenarry or all Work performed. O/w0-JOINT SEALERS PHASE 2
-.M.an appaphmsafety program ataltimes. 2 ProductWarentres: PrudenmxtarturerscMroarowartarryanall products A. Seat the fdl wrgjartswshjointsealewhethersoindicatedondaWingsornot: _ SCOPE OF WORK ORONO METRO RV &
trmaferSch. 1. Jofrmbemmencatiradand caxaetopaammilk MINI STORAGE
01600-TEMPORARY FACILITIES AND CONTROLS 3, SpecrfiedWanedw:Pmwdaspemia mrxmsnspnffiedinindivioWSedwna 2 Conolamamceramctlleflaxing _ ____ .
A. TemporryUdiHim:Weower
Water,anew and electrical pam wettable far construction 3. Aroundwaxroompunbingrataea&bac plash a 2725 WAYZATA BLVD
,wc u wnntabukang,atOemmexpese. ExongwaNroanfskigewmaybeweQ DIVISION 02-SITE WORK 4 Jonnsbetween newarywauhmrg and eterordaaw
PmidowframORONO. MINNESOTA 55356
p
T in-provide temporary military Acuses fa co smcllonworkers.. B. At horta ra!surfaces use pouade type it avxsde:atan other safacss use mn-wg I I
S. Tai onry Conbols&Protection: Provkle ell co tura required o nuamin. 02200-SIZE _PREPARATION type,
Nexcessive dust new,vibration,and odor.PrwMe temporary proteaon against A Erosion Contra: Fordsobed Ste arms campy with City of Oronosediment and C. Appy continuous Wad of jam maser in rhe foaming locations dung imMlstion of I Issued For Date
weeder,ports,and theft as moewary Pmondm all tode,mesa;Iia aft.,required for armon control reCPAm bet forth a Orom City Code 79.7(o)(2). matenas sdebfled elsewlme: PHASE t
dwatuch npurpoaes Pmtwtempmrywwte&recydirgStorage and removal as 1. Around wdoa/wlndowfmm inexten"vol. 1 I COMPLETED ¢ CONSTRUCTION 04/22%2013
required to naintari sae in dean and odery condition;provide Ilds on conminere. 027W-PAVEMENTS 2 Between partition floor and using trecJa and adjacent construction
C.
Separate
m1��n iProductson vAr Il li lm�trtmthe
s aro°dem feasible. A. luck Biltmrm BasennDOOTnie,2 Irrrhos mOnnmuri8mcrkrew Tacit a. Under nexenriorit=.11ammon eM agacem anheln,cno,. -- --- - -- - I I w
01600-PRODUCTREQUIREMlf1T3 B. Cane P�ament:m�03300 OT rtsx,2irohea mnmun. D. E. For
AamLoWtl new Otherwise Indicated: �
Pdyu 25,single-
mh-seg,gexmde 1 I C D
A A selvaged. 9 Contractor
All prodxm tb ur new,r re-use,
recycling
a wtva e,ce C. Cure Cwt In pace awdm[a,&812 profile typwal,won dmpped'mwumabe'cuD elaeomemc mnf LJ corralling with ASTM C 927,Claes 25.singe-or PHASE 3 I FUTURE I I m
I
selvaged. r Cortraclor ease other pporbmtw fOr re+ue,(eyeing a wle�value, prorlee whew efferent. mgtl-componem,Ums NT,M,ate A Cita M malts axyareng matwab.
WrgtothoOwrer'tarenWnfw wiawandappwal. Usethesemebmndmma E. Interior SasMm: ( Q
product fa mcIt honoree d the Same item. Products shall W free of manAacmxers DIVISION 03-CONCRETE 1. Non-moving Joints Expand M View Acrylic latex,water-based Single part, _ _ __
rano lava Prawsa eu wartanties offered W manalwtaem and tie apecitsd. mumble"Mart,color o match a0janirg rrtatenels
S. SubsAWom: Subabludonto" a sale be dscosedmden 10 days d Notice to 03300-CAST4N4PLACE CONCRETE 2. Jammin"Mart,Foxe: Pbyuretarx+,pourable.emiturnerc aulan,complying •Q
Proceed SubsibAion r"wsft shall include a mason fa the request,.a detailed A. Scope: For concrete awodated uwth neceweddock Infillslab,patching conorae slam with ASTM C 920,Clam 25,eeigk-co ponent,Use T and M. Color o match IV Sheet Title
oopwaon of product characteristics to Watched product,and the pposm cost andor on grede at pumping remles Va. adjoining materials. >
0
scheduleat#utmerts S. Prepaelon: Cam Should be taken when demolishing existing els W so as not to 3. Masonry Caved Jaron:Same as exte r)am ewer specified ahwe 3 SPECIFICATIONS
I 0. Product Daivwy.!orale ate HwA g Repuir fs: TMmptirtandranee n damage vapor retarder,aany,below the ssD Pier platg s m pace,into smOwe 4. In Wer Amu,IrtolWng KitnJte m.Bare,and laclmr Roore: Srucgre gurable
v accordance with manufacture's instructions,inspect promptly,than delivery:ands by ca ital hes been Mutilated to 96%Osmanli the sate mehon replaced and compacted, rowing sealsrt,compying with ASTM C 920,Caw 25,Liken NT,M,and A with
method,Rea puavenl wiling and darnegS.State and poled In acprtlawe with and the also vapor raeae is patched ar-tight Fill below new slate shall be as mikfeweas WTkte
nmxtadurers
instructions,with pedmgug,seas,and labels tram;stow in manner specmed by the Structural Ergheec. 5. ConealedSmalamin Non-Mining Joins: BUO4aacrytcron-skiing, Project NWOSr Sheet Number
required to proem damage. C. Ircemeht non-araenirg weer.
N 13.014
1. Stdad A0.1
� t. StanRestagtinSan: ASTM A 6tsrA 61sM,credo 60 /�� KEY PLAN �
NOT TO SCALE
I hereby certify that this plan,
specification or report ras prepared by
me of untler my direct supervision and
' unddeer the tars °f the State off
OMSION OB-DOORS AND WINDOWS- 3. C-Besoband Trim-Gabmrced.eard. 2 Radop Equpnen: Insists that reenact arMpmert bads can to suamilmlA' fnf am a duly Licensed rhite
ct
roof Moisture Roof panetre0on&W be paWWby WaGflearoofirg professional.
3 Dem Becanefa diarwlmmr bald Minnesota.
0810SMW0METAL000RSANO FRAABB OBa00-TLE gin: fisting rlg,apipnuf,zores,dStNxlonad. Edward A. Farr j//pray/i.
A. SOW Doors: A. Floor Tle: Color es scheduled an the dmwirga.Install over prepared concrete fact mrtrds. eecane fart=iar with Proposed omuparxy. PrdvldewV�
I. Gradix ANSI A250.B.-Level 2,prrysca performance Level a.Model 2..Seamen surface using TCA Hardbook Me8ndF113.dry-set a latex-poNaM owners bond met for new wank,filing into existing system as applicable. Stant ca utaborla end HARDWARE SCHEDULE DOLE
(18 gage).1 1/Inches thick with Standard gist sanded gout fully engineered HVAC drawings to Owren for approval priofto fabrication or
2. FactoryFisch: Interior-Prime leaned:Extertm&Wet Areas-Gaianzed B. WNUTlS, Color as unneduad an the dresengs.Install over prepared dry-11 surface ordering equlpnem. Data 4/19/2013 Reg.No.16362
G8WZ180 per ASTM A653. using TCA Handbook Method W243,thoeet with dyset a latex-pomana cement bond4. Warehousestorpearwmmnot require err mrdtiawg nealandverelation only. - I}. 111 I1 Protect Manager
3. Glazing.N sdreduk'd Provide Smm desr tempered glow at interior dare and 1 cast,with Standard grey merged gross. Ddwdn Klock area.Room 118,require carbon monar le classroom and whom.I
inch nick inrdaed and tempered cold glass units at extenor doom C. Tela TrInc Tlanndd Stdoma-caareluahunednsonmmiprade: Iraitle.80 make-up or Wet-per ado. s• m.
4. Fautc -papas and restorce for hardware ed in aocordence with Sunderd; degree comm-coved profile d mstai silo-err-square irmide comes. Outside 90 5. SupPIY air¢Buses-24 x 24,4 cera lay+n type,whoa cam.saw with as own g 31,Dae IVPs 115 be. x_�: zz x
ry ePeDrtl deg fg a DODPYRIrJIT 2013
mordrow with Doer Hardrsre Schede degree careers-btift-profile of matdMg We ler-buttjdrt Wee locating the joint on control dernier. Flex-duct mall be United to the led 5 R maximum d duct r,n. --
5. Install In amoMaricewith ANSI A250.6and ANSI A250.11. the eho"d of the two sed aOf &Was base-cava base Words d matching ale: Refurn err gnome in ceding amid be A inch aluminum eggSame parcel style. 3 - rt_ 1 hereby certify that this plan.
Btdoer. SDFrarrws: Fury welded and ground arlooth carrier type;2 bndh wide face 8. Load.themlostab w walls,away from dnect sudgrt,All thermostats Shall be - Jshu i -a s specification or report was prepared by
frame KnoakAPMh ff not Permitted. DOM-CEILINGS digital programmable,Honeywell VlmonPRO 8000 Commercial monies a easier. ---i- -- m9 or under my oirect supervision and
7. Locate all susiertded mechanical I1PE m �- _ -1--
1. Grads: ANSI A250.8,.gage as required b/Standard farts goods steel.doer A. Orlddupporbd Acoustbl CKlkgs: equipment over AISLES d them Storage areae that I am a duly Licensed Structural
for maintenance,Screw;n e,er locals,a 11PE Y pNnaes
Specified:provide enemas specified b/sandard. t. AconitalPanm: ASTM E12B4,type ell,pained miniere ober,24x 48x'/.inch, guipnrenlwa the orange kxtare tY-ppf - Engineer under the laws the State
2 Fedory Flneh: Ir w.Pnmepemed Edwor&WetAm".Gawanznd scared 24x 24 pa0ern,tegular prdft wetlefted wns color. Anrtstlong Cortege awmeeh' :LomU1Ck conular .waw of Minnesota.
GWIZ180 Per ASTM A653. Second Look
m USG Astro ObroaRm. - Pomw- b18Nii -m� -�- x ---- John Paul Paul Gills
3, Grdu all frames set into-a."-Me 2. Sumenson Systems ASTM C 835;15/16 inch wide doubly web Tse bar"am, OM>NON 13-E LECTRrAL seen M2B roc Y\L Icy f��
piaanNad www period gaMrezed Karl,hung from deck above with hangar wire amR L4a'6 W7 x
08200-WOOD DOORS deMgnad ler InlMnedaom Duty per ASTM C WE 18060-ELECTRICAL a"4r11Stl M9Re T Fro
A. Flush Wood Doors: A. Design l Burnt Btectrfce: DesigniSuNder responsible for nes,Electrical work requrad, __ Pwq adeno 1`-cis - Det¢ 4-19-2013 Reg.No. 21476
1. Grade. WOMAI.S.1-ACUatom Grade,"A''Goodeveneer. Padixims o omw-FLOOMNO pus arty repair/restaraOan requiedfar existing Squirmed,une , res, and control.
Standard: WOMAI.S.1-AHW4y .Ddy. AL Resllknt Bou: Provide 1/3 lnchrick nAba:4 Inch NO;matienrtleh;adores NO that the antro lwlkYng will befudy operational,in goodwonarg a0a and upto-rem
2Co stncaon:PC-5. h
. =bon mars0.with tooarera SMKIar premoded Wow*and Informs mnrere. coda, Work shall became usne d under the direct shpme oa registered Electrical.
3. Veneer Oak Cut Plan Wood Visser Matching Slip match invenew pieces; Selecttap W coved design fmuee overtmrd Surface fkdrig,a straight bow design far Engirser in the Kate at%misaoa,and Sall conform to applicable codem
rusting maecrang an faceuse,with carpeted floors. 1. Design:Became f=IW with existing balding systems,equlpem wavide mea, LEcslwle Pnhs�- -�- K __..___-.-._.-_...-_.._.-._...___....
4 Hardware Relddrcematt in Pond-wasm Mi ora Cores: Prondesmid B.Vinyl Competition Tile: Homogeneous,with color extending tlsuou tidmees pan SboerdderlbWdnardcmnrols Bemnefamiderwith Owner aattipefCy,uw
bloddng far des es. Thckrew.125 kxtl Provide tapered red"Kris o protect resident floor edgem not d ora epee,papalsi mneW uses. Provide eng rasing deogl fm new and ..._.._.__.__-_...._......._..._.._.................
5. TransperentFrtsh: Fadory nishS4 mfg's standard lacquer,clear blit-.-covered mnodeloO orKMnglm°exle8rgsyKe applcabN. SUGntlightingenergy WTfencE m
B. Wenexy w Sodd Core leen Ocom 5 yeaoo. C.Cefps: Nylon ober lNs4om orscuphaecHoop pile face conetucton CDldr a a calculations in co milia ce wdh MN Energy Code and fully eregosered Electrical
Ra__
Patternw scredled. diem-glee iretHatm drawings To Ovmer far sppnwa prim to labrcatlm or ordering equimient
DO=-OVERHEAD DOORS D- Liquid Flow Carol for 9eraga Areas: MuAi-coat Epoxy Coatg,by Taman Flees 2 Provide power to all repined HVAC a pipmen,fight futures est signs and coat -
A. Sec creel Overhead Dabs-(1xr Door Schedule far scoping) Coatings Ssedrawsg6 fm locators.If pDdat any indicatetl in storage AISLES;still We a$Mede0. Prwde anrenace poser oulW ft*LW A trA Wkengfor
1. Insulated aged Steel gage inside prepare the Mare ram With Steps 1 through 4 below(each Sep before apphoetlon d genal m sift ice and housneepirg.
I 2D 9aN Pmet,2 bdh finished whit,m Van cid 22 a•Outlets:Wall outlets,Kali be Standard duper,unlew clnerme noad 2D amp,
pealwide formed
s"thifsecureactort townde,jonts arh heperng(exlerbr): epoxy Mid Cost),andasf1m. pyin eta ami. 120 volt,maned vel' ITdil" -...._.
3 inch wide ass steer beck aeerxrmd o maswryjert�wm heavy duly ball Z Sn-den o Prepare Moor. rlhEaa/,15 inures abwemetloor,with Stninmiw See faceplate,faLapae roof mta`a
rod"a v4hesl gt Field
imam headroom
room cle operation;wwNon-stripping all4 2 Cmxeorec MPE odor s Cl.-. and gray outlet decree.
mdsedopertrq, Fed trseNreflwtlnmmclesrrCe fa proper profile. 3. Posner Eoo-MPE Color 3 Wgtkg:Phase lcarhpeted Inducing general hose,Illuminator,throughout the
2 Me"adunas Way-Oafton m Overhead Dom Corp; 4 Bove Coat:EcuPT Topcoat o NI mads. ooSt of Oa.WYdrg Prwxle mea,permermerS lining in Phew 2;all inwnpierxa .
3. Door Opw.W Ekcblc,Y..HP raramm,sued per oriented
me far & Mid Comm,Eco-MPE Gassed Epoxy, with MN Energy Code far"rig power usage:
"moderate"dtytse. 8. (OMIT THIS COAT). a.Room 118:Flooreseem tragm-24 x 48 inerA hirged amyl..mins.T8 lamps. _Loll a0lTs L_hbw.
4 Cmtrola:Standard 3-baton lgrpownSopwal switch on made,next tlaor. D.Storage Stu ligpttrg-Hi-KBdenry fluaescem ablpligtargwith mYemas and ^nw.we �- x
S Operation:Aumnetc dosing operation after pe-detMnred pedm of time OWN-PAINTS AND COATINGS wire cage tang protectors;Controlled via mo6wsemaa ora sensor K each end -- .
(programmable);with wary(emxw to prevent dosing upas a vehicle under a A. ImMor Opaq"GHtlng$yams: of each group,Ugfts shall area M site a we-dete-cad tae period kis. gmE iii_pelcra,e = x. x
within 5 fear of the door opening.Pravda durable warm mining ten Seconds pnorto, 1. Concrete Masonry: programmKle vis lighting am"parol.Light eorad panel Seel aim slow'all ore ---
aft during if*afire alltoMatC tlasirg operator,that warns of door closing;such a. Smggws Alkyd Enamel Fimh: ard'all off mous swltcnng Locate lights above sew any,not abort storage
audible alsnnaoMd Shall be herd exthin 50 fast of the door,but no further than lW 1) BlockFiler One coat high performance base block filler. lodes,attached to underside of roof joists,spaced to achieve 21 fomcanesat
R Alamshall notswd when doors operated from ON,pah-button control:In the 2) Undermt One coat later Shemel uderaosterante ficar level;mirt r- . w coF
snot that avehicle isvethinthe safety delerLw2mle idMtifiedabove etnetwr
limed 3) Finish: One coatni- alkyd irterlor weasel. aWashroomdghang:Cmtinboncw"lgtt/mhaLetfmtM oo,».a aP[+unR.
ausona6c coming,"aurin snail soul corarsu dusty,but the door shat not clas 2 Gypsum Wallboard d.Switches:S'vigle-pole quiet toggle lige switch controlling washmoms Light •-Ise _ __----
util the venule leaves the wrest lore. a Eggsired Acrylic Er anal Frrien: control paw operation fm Storage area lighwg. 136,001 NPE I r•h �-
OETW.HARDWARE 1) Rimer One cos/Kar inenCr Pnrrer. E�-wn
A. GM IRgidnmmrh: FYwdemm nerdwMWUtiwwN deor,whema 2 Finish: Tmo ml iinlamr relmel: 16700-COMMUNICATIONS [ser-�seawvwr iux _I�_
ilae try ) L P+nea eBd----�
aanzabl ecow a cat o tuoy wrsd dens ortreelr intense purpose and mmpiywith 3. Hmbw Meal Formes,a Enamel
Meals: A. s eephoae and Dass Own Owren Stull crake all
low v mem hor seeing,Peng and dela IT. rm--
I
m
applicable metes a Smigow Acrylic BemISt fRnsR serviced the fxernses.Owner is responsible for aY kN voltage wring fxAkg wires o 1YPEY
1. Typical Material and Flnen:Seen otromium parted(628),complying With 1) Rimec Ore coat later interior mete or wood Primer. outer Iodabona cadet devices and faceplates that math the color of me mlc l dev ow. ryPE 1-ika.rx: .
ANSUBHMA A158:18. Rates,Protective Trim,and Push and Pull Bas:Solid won 2) Finish: Two mea semigose Isar sl[erdr enMrel. Plenum rated cue is required above suspended ceilings,a erposed;cprdut Day be rasp u uwnsv �Y �t K
ssbnew steel. 4. ZireCoated More; regered in open ceding I warehouse areas by Oyer.Elactiman shall pmvde power
2 Fxe Door Hadwere: UL listed and abated except hues read not be labelea. a. Semlgoss Alkyd Enmhe Frmre outlets a Owners eauprem Paries es redeem. At each pare ad den ouslet rwEx j ra seem I- �.-_K
B. Krlyog. Ke(to exibrg loving Women;veiny with Owner Key locks differently and.in 1) Primer One ms gaNanrzed metal prima: electrician Shall provide rough-consisting of 14=(2x 4 or 4 x 4,par Owner)and
goupo based w OwrerS ifatrlecaand 2) U dercoat Ore ma alkyd inamr ewwnei underwriter. mnduftShia up to 6 inches above cel irS with a plastic ousting protecting f open end TYPE 2 r swso T x x
C. BultHinges: FfvtrbdcMe,fWl mom,compiying mthANSiIBHMA A15e.1.ANSI 3) Firth: One mat semlgdes agrd imenor enanal. d conduit Cmrdrate l w stage secu7tV mhrg/cKrwit mug m meth Oonrer,or
numbering system m used Dray to indicate configuration;campy with all mguirements d each exterior door.
Standard and of Specification. OPAMON 10-SPECIALTIES
1. Dinamofs: Cmplyirg wth ANSI/BHMA A158.7:sizesas recommended bf DOOR AND FRAME SCHEDULE
rrmudadua hx appiki tar. l V4 i,,M tack doors.rrl-4.1/2 imh by ll/2 10280-WASHROOM ACCESSORIES PROJEC:Orwro Byre setslaMe Pmts 11014
mdL A. Toilet Paper Dlsp-- Sem.-...d rill cat,Stainless Kam.
No. Welded an
para n xo s
aL W
112 30'x r4' F SCRO 2 He I
2 Matedol: Steed,plaeswahspmOodfinMp
. Exceom
n for exterordm and 1. Bobrick 8.4.388,on Saler 113 311'x7-0' F scwo 2 w
do
.to- rs m wet it-# s or-or armee was%peci iod finish(Plated a S. Paper Tows Dlpuser: Rammed,C-tdd towels,stinew Seel.
nabommiI a Konn eKeel. 1. Bobrlck B-3S9,or sirtilar 1H 4-0'xrV F HIS 2 Far
3. Grade: C°wswith dowm-Grade 1,heavy weight bald bearing.Interior own C. Mrmr- Surface rnourmed;Saokw steel edge funs,will bottom shat. 1181 M74'x74r F HA VY 4 Fal 5�¢0'vASiON PANEL
with=cloaca-Grade 2,Standard/weight,am4ncow bearing, 1, BOW*B-292 or similar
OVERH610 DOOR(VERIFYEXISTING OPN(I;
O. Lacb am LaDtnSs:Cylindrical w Interior doom;=rose style on externa loon. D. Liquid Scop Dispersion Sulam rtCsttes o woo;seinen Stwl. 1188 160'x 12d 011 SR 3 STL SEE
la3t10
E Est DNlras: trot racial this project). 1. Bolock 841 1Z or,rmlar.
F. CyU,.drirar L,oa.s. : ANSIIBHMA A156.2 Grade 1,SeMag.ND-cones,Rhodes L Orb Bas: SWlhien steel,l Y.inch dartNton,-up finsn all three: 11EC 4f1'x r4. F HN 2 IW INSULATED EXTERIOR frl0,O Qc a TM
hr®v„wmye Orevv d:ee51 b4'LvahO
I.Y.doom 1. Slob of aocm0le later Bubnick 11-58W 99 x 42,haiZ°nal. 4•Pnmf.hq
O. Mortis Lrechsen: ANSVBHMA A156.13 Gide 1,Sdtega L-woes Oe Iwon design. 2 Side a aacnsole toilet Bobrick B.68D6.g9 x 18,vertical. 5414a .ni6r.xr:n,«+w
IL Closet: SuncemmaWtMB,Compl irgwm ANSUBHMAA156.4. 3. Ba*cfamemetletaetBoWckBMW.99x36,nxpataL ROOM FINISH SCHEDULE PAULSON&CLARK
1. Functional Feetuesre
: PROJECT:OMet°Self Storage
a ExtentDoor: Grade1;holdepw:aWtomlagustbleto=ngforced15 10820-FIREPROTEC7gNSMLALTE3 ENGINEERING,INC.
percent(PTAIA)sews tome required for surf;adjustable hycmulic bad heck A. Fire FJDingusirere•. Rating and slzing of such requen d by local Flro Chid. NO. RDOMNALE Room UK I MOMWALL WALL a WALL WEST WALL CFJONO NO 2}52 E(.a�unl Road 1
(PT4D);adjustable°eayed Scow closing(PT4F); Wit-factory dead sop at 1. Prancera cabinet for w enrg mShaa Y
90-110 degrees(PT4G);hydreacflud Nibble for use at upto mime 40. 2 Rwide mdng a'em throughoutwrit as moven on the par a as m Wmd by do %-F D IPow Z EP Val Pill PTI PT1 PTt PTI 1,3 White Bear Lake,MN 55110
degrees F:mixxit adjustment a repacenem. AHJ.
b Irtmor Oeor Gide 1;adiretwW tlydmulc tadwhwk(PT4D);aajiasble B. Coldness: Eromelm steel hens and dor,with ersamodNSHN catered,white. °FOffice:(6)) fi056
111 Hast/Phos 2) EP VB1 PTI W1 PTI PTi PTI 1,3 Fdx: (65l)4U7-6476
delayed man domeng(PT4F). Surface r cu ed with locked door with breakaway ease access,labeled in red Sized o
Email:pa;(aplmismlclark.mm
2 Casing Farce: Aa pedfred m ANS 34!(158.4/m ate required.rd. ft required extsgaSrer 112 MeoY Tdst(PAese 2) Q1 Cil Pf3CT1 PIT
1 PT3Ci1 PT3LT7 ALTs BO' 1,2
3. Interior Door Closer Sstes: Doors ova 34irxtss and uP o 38 inches wide- Size
IILDoor w3gsfdasaroupo481mlwsmde-Size1V. Ooomover481nches OMSION IB-MECHANICAL 113 WomsfaTGW(Phm2) CTI CTI Pi3Cr1 P7 PT3CTI PT3iCT1 ACTT 70' 1,2
wide or&Cjed o Karg drafts-Size V m A,wnclaver s suitable. }'
4. F_MenorDoorCTceerSizes: Ocas°va30-himaMpo36incFaSwide-Size 164W-PLUMBING FIXTURES AND EQUIPMENT 114 IariNRoang'hne2) EP V81 FIi PTi PTI ACTI Bbl /,3 sterner -
IV. Ddmswa36irctasamupto42ind-.w L-SizeV. Doorsover42inches A. Oesign/Build FIumblag; DeeigrV9aderresponsible for neWplumbing work required (.oI1Sfi11CtfOL1.SCI'VlCESr$1C.
wide or unusually wuvY Walt-Sins VI. plus arty mpasI resoraam required far exieang fixtures and Piprg so that the Star l.LL Se
5 Moulting Onturge(pulpsobddoor,udew olhonwiw sx5cate0: Where dote bukalg will be fully operational,in good wofdlq order and up o current codes. Supply 118 Lrdng Dad EP AT PTl PTt I PT1 I PT1 PT1 1.3 3614 C°urny Road IOW.W%1MN.MN 5539t.
woud los exposed im m�mmr a other pubacapme,moot on ro code,regaroless additional fbdhxes Islas required to mxe ode,out do not ams form es a sham an the
ddoor swing.UseMwnot Project asteteapderble mowings. Work shall bed"wow one mrectsupavawdaregstemRimibing
195a)e73-S6St�.com
B. Covin: Maafm
auasmntladfurlrgularstyle. Engineer in"Sate d Minnesota ROOM FINISH SCHEDULE.NOTES Client 0 wwWs
I. D-Stops: ANSUBHMAA156.18Gradel,vdthmrsamedorinmrspm°us i. Wodwtsideofthe Pnerrwa: Ifsp*,waste mvetpiping extends beyonathe ORONO MINI-STORAGE. LLC
fasanm.. Flom Sops-Come type(LD2140mLO2160). Wall Sops-RouMmrwer sue am.redtyLanalinadvance oeaKinganngaccess toadjacent i SATINPNMFlNISH ORONO
CLOUD DRIVE
t4ramr(LO2100). Provide door Sop fa S6851 pecies every door leaf: spa , THswork Trey neve o bo done Bring mnew ws
busrne
J. PtabmtPeHar&t a ' ANSI/EHMAA156.S Kick Paw-36 increehighx l inch 2 Trerching.Minmtae slab oratg Rao o Semon 03300 forcancMe Web 2 FLOOR STOrEAT HEIGHT CHANGE RIOIA CONCRETE FLOORTO CERAMIC TILE,MADWM SLOPE 120
narowerthanwdhdda°r. Edgsg-'C"darmelpmfhefmleadogdD etlge patching canirmafwmwumreisNabangrace,awhchtrMmingisallowed, EDEN PRAIRIE. MINNESOTA
pooectaL full height of door Provide Irick paw on"I...an.-doom,lana°, or a a is a stutual floor sum,in which ossa trending is NOT Slowed Coordinate 3 NNYL SASE AT(sYPSUM WAL1BlYRD ONLY
doom doom.and doom wear can trafia IS anticipated.. per tbme through Structural Nabs with Amsted.
X. Asbages&Coordllmtors: Steel,UL Meted and labeled;use on fire-rated double 3. Rod Perms°ro:Cocrmrsts with Section 07500 fa rod patching} 4 PNM INTERIOR HNORAILINGSCOLORPT2 Project Location
door 4. PVC piping is n aowad unless specifically aufcnzed by Owner
M. Smoke SWs: CampaeNonDumbiiULRatedandlabeledforungnflwmted. 5. /Wfcturehe"end dwm wall be in compliance wmapplicable codn. 5 H17ARDYELLOW SAFETY PaNTONCURAS.(4)COLUMNS,AMA 70'STRPATTOP OFLOADING 000KAREA ORONO METRO RV &
door;pwde a interior fi-ted doors,wardroom mor,-dor doors and door & Rn Drarege: Add additional rod drays pads recommendatonsmraretl MINI STORAGE
base,deferent eroirwmatK mndtme. witinthe Owrers Roof Report. °R ' MINI STORAGE
BLVD
7. Damdmon/Abe domont m exmialg pstmag:Remove all plumbing won shown,
as=-GLAZING inducing supply and dram ppingmoving any much Mum tothe extent reasonably ORONO. MINNESOTA 55356
A. De mUw PolymW FBm:3M Feser GMm-Amdepmyederfllm;pattem:Matte amewite.(s:ansa up floor slab only to rmwe under-slab wntary dram
Crystal BSIH2MACR.For use on etlging adeno windows In Storage ares: ping).
VCT112'x!2'M YLTILE CONGOLEUM ALTERNATES NALAA'MULTICOPDNRW
o B. New Plumbing Fixtures:Washroom ens to be v4ie ponmlen wall mounted on EP EPDXY(BATING SEE SPECIFlCATgd4 Issued For Date
DWA010N 00-FINISHES tartar.wan automat faucet(tempered w W,drannerer wry l ne PDP-UP N 1 7x7 CERAMIC TILE DAL-TILE KEYSTONES IaA3lA2m,Bl1FFSTWE RANGE valva Tempered wets awl to povided via wnY-mowted irslent'porn4-use' CONSTRUCTION 04/22/2013
08260-GYPSUM BOARD ASSEMBLIES. actrr m im neater Tants to bewhte porceleb,floor mooted NM tank NPs,
A. Non mW buring Strad Wait Framing and SafM Suspension System: ASTM C vett whom psetic Seat no,ria cwt_Urinal,it required,to be vine porcelain wall awes
845 govan0eci ase arrest.Stud saw and gage per ASTM C 754 at pedrg indicated mooted with adendad Ili design. Mop barn M be 00 InchSq=e x 6 inch telt rn CESAeecla.e fila xsvScotm uaa.VJaBUTPs[oNs a4nmssots
" fm msdl daadtlon d//120 a 5 p f.Fast m: ASTM C 1g02 SMCnlllrg cWlonrzz 0=mK wthwet moumedjar tmfauoet aaemNY(H+Cwatw)and
sefAapping eaeWs Irtaoation wadmnply with ASfMC 754 3 n Iwt g rubber hose--so me,faucet sPo use ream smidoc m-dne heetenr 1 /'STRAIGHT RUBBER MATCH EPDXY FLOOR COLOR
8. Oypsum Board: ASTM C 1396C 1398M;518 krJL beveled edge,Type X typral, for the fixture also.Drinking fountains to deeledre dllled water type,dual hreght VB2: 4'COVED RUBBER JOFPSTOMTE 1119-80ME WHITE'
aI Use moldy dm board when applying to Inside raw of wuna walla;and tine backer foraooesstlay complace,stainless Kee,heavy duty constriction.Wall tlydrarit
board beard well Dieshall be frost-roof se horate with med
Na !tool vows operation.
ypALlB
C. Osum Board Assembles: cerwu
les: 9 Rllesorr All watef piping inuring rod drays,wear Supply,waste and PT1 PAINT WHTE AS SELECTED BY OWNER
^I 1. Ful Haight Partes: One ley.,Wpsm boom ea=de d 3 5/8 inch studs 24 vert Rpi1g ssd be fully IneWaed wertmeed to prem any possible condensation
iclw sti
o.c.with full depth acouc/thermal Insulation,n,Rto deck above,use tilduP:whether the piping is new or exong.Contractor"I irowta Piping Prior PT2 PAINT-SATIN BEWMCORENHC174'LANCASTHtWHTEWAMY
srp4rck dmficcow head track fa moa deck above-peck deck flow faramaw to fact Cock prang No that the mrdaadn can be peened a that come time. PT3 PANT-SATIN BEH WORE#1464 UG117 PEWTFA' Sheet Title
$ Rnd Res icaeoarmn. 1 7,,T CERAMIC TILE COL-TILEKEYSTOWSUWAAZEBD MkFSTOWRANGENDf56
3. Flue-ResstNeearaaro:/Isco WhervflBe rated castnuct owe-hou rated 18800 HVAC
D• Gypsum ttoAc�1.'ories: A. DeslggnrBa���Dara �neMi�R.m � U,dpiL SPECIFICATIONS AND
ary and BBB SCHEDULES
$ 1. FmshsgSVsWm-ASTMC475/C475M,ready+nedmrfo4msWjuincompound, the entire building will be hely operations,in good workingaobr and Up current codes -1 2x4TYESAHIGRID SEE SPEOFIGTONS,ARM9TRONG,USG fOj ECt N�Ef se tEEt Number
flnM t°ASTM C 640,Lwe!4,typical. Sc,ewe-ASTM C 1002. Work suero be done der the drect spervisoel of a registered Mechanical Engineer in
2 PmusDc IweraatOn-ASTM C 665,preformed,hidcn4K unlaced,full depth of stud one Kea of Mimeses. MISCELLANEOUS
cavity. 1. Project shall comps/with ft Sem+aaed category d Ire Energy Corks. His JHDLLOW METAL FRAMESAND WOR PANELS AND INTERIM FACE OFOJERHEAD DOM,COLOR TO MATCHADJACENTSCHEDULED 2101OR 13.014 /L O.2
I /'1
I hereby car tory that this plan,
spa ton Or report Was prepared by
H I J K L M me Or ender my direct supervm,on and
- ELECTRICAL PANEL TO REMAIN Mat 1 am a duly Licensed Ar-,I.C1
under the taws of the State of
OR BE REPLACED AT THIS LOCATION
28'-5' 28'-6' 35'-8' 35'-3' Minnesota.
z ato
Edward A. Farr
y
wDate 4/19/2013 Reg.No.16362
n w
Project Manager
I II
O II CDDebT 2013
n
EXIST RAIN WATER I RELOCATE her
EXIST EXIST ELEC SERVICE II 1 hereby certify that this plan.
LEADER ELEC PANEL ON CONC CURB
COORDINATE tl epecdicatwn or report was prepared by
µ LOCAi ION WITH II me Or under my direct supervision and
PROVIDE CERAMIC N 21 LL o EXIST ELEC OWNER REMOVE EXIST I it --- that f am a duly Licensed Structural
LILE WAINSCOT OR 21-i P PIPE GUARDRAIL gineeMinnesota.er the laws the State
Or
GLASS BO AT MOP �! J�oh^nPaul GBI
SI .PROVIDE REMOVE TEMPORARY Y�L
3'MOPHOOK NOTE: PARTITION
ABOVE SINK VERIFY PARTITION s 112 112 NEW WATER4.192013 21478
LAYOUT TO ENSURE = COOLERS
NEW FLOOR MTD REODate - Rag.No.
COMPLIANCE WITH 1 �+
UIRED CLEARANCE u
MOP SINK IN FRONT OF TOILET11 FB Q rm�r
ti
114 5 6 4= � �� p 11n sTnaar,F n (PHASE 91
SEE DETAIL 6/A3.1 FOR
V � ..__..._.._.____....._..__.._.....___...___.._..___....
N-21-i 3 WI ' PROVIDE INSULATION FOR ALL _.._.....__.—...._....._.
VERTICAL SLIP BRACING / 1lII/NN'N' OVERHEAD WATER SUPPLY AND 119 MEN'S roll FT
111 AT TOP OF WALL TO If ROOF GRAIN LINES
REMAIN t1/ 113_WMMEN_S....IIlILE.I.._...__.__.___..._..
3 ' 114 111 11 lTY ROOM
5- NOTE: DPROVNDEUILD ELECTRICAL
OUTNDTSVAC NOT S:
N
4 ALL SANITARY LINES n/ IN ROOM 114
a, 7 �r 6. TO BE VIDEO SCOPED l� -PROVIDE SERVICE DUPLEX OUTLETS
;e 11 F2 AND RECORDED FROM IN CORRIDORS.COORDINATE LOCAT
'a SOURCE TO CLEANOUT WITH OWNER
W. AT WEST WALL:
-INCLUDE LOCK BOXES FOR T-STAT - --""----`
113 _ EXAMINE ANO/OR DEFINE
T13 ANY ISSUES WITH -,L — — — - .___....___..
PATCH AND REPAIR
DNDERSLAB LINES r� I
VJ(� `j �3`(� �-,�•{ -- ---------
CONC BLOCK IN SPF 5
SEVERAL LOCATIONS. TYPICAL INTERIOR TOILET WALL 7'-2' PROVIDE GWB DIRECT !
N-27-T GLUE 0 EXIST CMU WALL (% /
VERIFY IN FIELD ON 3 MOLD RESISTANT GYP BO ----
ON 3 1/2' (OR 6')METAL STUD ON NORTH WALL RM 112
WALL TO DECK.PROVIDE CEMENT PLUS NORTH AND EAST �`
WALLS RM 113 J v
BD AT ALL CERAMIC TILE WALLS /' -- --
WITH VAPOR BARRIER '3
PHASE 2 CONSTRUCTION PLAN N� / — ------
.7 SCALE: 3/32'=1'-O' _ _. _.__. - 0 _ 2 4 __-8
FIXTURE AND ACCESSORY REQUIREMENTS WITH MOUNTING HEIGHTS AND FINISHES /l
REMOVE EXISTING
DOOR FROM FRAME
PROVIDE INFILL
4- -I, PAINT A fFccORIFc c.HFDIOF 0 PARTITION --'—""— """-'_..___.._...._.....
PAINT WILL SLAB$TIgJCTURAL NOTE
PMxI �• v Ie•B.B. ' (D-AP-1—SER �' WILL E
XISTING 0&PESS®LOADING
n D00( FILL T.WAINSCOT TPAFER TOWEL OIBPENBEP ISCONaETE
c' @ NEW
WITH
°alE:N'r Y O A mrd BGR 1-1-111 ;I 1E�5 POUNDS PER CUBIC
s .r.BASE - , c.r.ensE YARD. CONCRETE MIX TO BE 4,000 PSI �•r�
a e How. C
Q 5 I 4 MAXIM,.M VERIFY E%TENT
A TE 8 0.50 MA%MAI.M OF FLOOR AREA REMOVE TEMPORARY
LAVATORY MIRROR ACCESSIBLE ACCESSIBLE. M1 ACCESSIBLE
ACCESSIBLE. O LottFi PMEp HOLDER wA CENfM RATIO.3EE 7/A3.1 , TO BE LEVELED INFILL TEMPORARY
WATER CIL SET WATER CLOSET WATER CLOSET WATER CLOSET
F1 F2 F8 F9 F8 F9 ARTITION
Fal TROLEXIS AWT Ca45TAUCTION.
SEE NOTE OPERABLE
PMTS OF DISPENSERS SHALL BE IO vt'GRIN Bw INORIZCNTKI A ATM P 3�PUMP 8 _ •a�l '- -_` I
1J——__
- - LOCATED IN AN AREA R INCHES MINIMIM ANp I - _____
36 INCHES MAXIMUM FROM THE REM MALL.D IB'GRAB BIR(VERTICAL) I I
I INC.MINIMUM ABOVE THE SEAT ANO 1-1r2 INCHES O CUT CMU 4'
_
MINIMUM BELOW THE HORIZONTAL'"19 BM. OPENINGS I I 1 w",w T�vv(7mw 1)51'Hiyy.NNY.S(:
DISPENSERS SMALL NOT BE OF A TYPE THAT 12) THUS I -4- 55iµ Mm„ m .w i�A�nm.hux�
ee JUS!\ CONTROL DELIVERY OR DOES NOT ALLOW
v E `LINE OF CONTINUOUS PAPER FLOW. I It 1
vfWRET�. HIOHEST \ / JO
DEVICEEQUAOILL I T ' I PROVIDE GWB ON PAULSON&CLARK
DISPENSEf —
R N-03 \ /
DEVICE \ / SPACING AS I CONTR EXISTING METAL ENGINEERING,INC.
•- •- SIM STUD INFILL ry
\ _ / SHOWN _ I _ I 2352 E.County Road 1
12'-4'1
ACC.v,siER STD.WATER FIRE EXTINO. PAPER TOWEL HMD SOAP DISPENSER \ / I Wlllre lBear IakB,MN 5$1I0
GOOIER COOLER CABINET DISPENSER DRYER (WALL UNIT) A1.1 I I II
\ / I Office:((657)4177.617$6
F16 17 F18 F22 F23 F24 >•J
— — \ / CJ -Fax: (651)407-6476
3 WASHROOM ACCESSORIES.MOUNTING HEIGHTSI ------ - I:a11alt
v / pac(avaulsonclark.com
2 D MOLITION SHOWN DASHED:
.I
SCALE: i/4=1 -0' \ / CMU WALLS,DOORS AND FRAMES
TOILET AND URINAL FIXTURES
\ / TOILET PARTITIONS Steiner-
WATER HEATER CAnswic ion SeMm,Inc
VERIFY HEIGHT \ / HAND WASH LAVATORY
A10 DEPTH \/ CJ SERVICE SINK I N 3814 COUTRY Rrlad 101.VVRY hfihl 55391
OF FRAME FOR /\ WATER COOLER 1952 7 473-5650
waw.slemlerrs.min
EXISTING CMU / \ Client
OPENINGS — — —
NEW PARTITION ORONO MINI-STORAGE, LLC
< N // \\\
PTYPE ROVIDE PLYWD PROVIDE I OPENING 6-C DE X 8L HIGH 8851 FLYING CLOUD DRIVE
N-o3 EDEN PRAIRIE, MINNESOTA
StM / \ CJ TO a'AFF ON 11 LEVEL FLOORS AS REO'D
RM 118 SIDE
0
/ \ LRELOCATEXIST Project Location
GE-MARK "I E%ISTING F[RE ALARMry ORONO METRO RV &
WINDO OPENINGS W/SEE DET' 4/A3.1 AND PANEL WATER SERVICESPECIFICA IDNS PND IRRIGATION MINI STORAGE
04000,F.3 CONTROL
q' 15'-8' \ A3.t ))6400,8.1 2725 WAYZATA BLVD
/ Oeeao ORONO. MINNESOTA 55358
2' µ N 2' 2 z' -
ne8
FRAME TYPE 2 FRAME TYPE 3 FRAME TYPE 4 o o L - Issued For Date
a 35'-6' 34'-1' w CONSTRUCTION 04/22%2013
NEW BOLLARDS EACH SIDE COLUMN GRID COLUMN GRID
REBUILD STOOP PER"'Do
a NE 0
DOOR FRAME TYPES FOOTING ;ING CMU 0 ENING SEE DETAIL
AI SCALE: 1/4'=1'-O' 5'0'
NE SIDEWALK I
W TH ROLLED REMOV EXISTING RIVE AND CURBING
CURB I (SHOW DASHED). INFILL DEP ESSED
-I 20'-0' TRUCK DOCK APPROACH WITH BITUMEN PAV NG
ENSUR POSITIVE LOPE AWAY FROM BUILDING
e
r-T PROW[ NEW CUR AND GUTTER Sheet Title
CONSTRUCTION PLAN
— - - - -
1 RUCTION PLAN
Project N Sheet Number
PHASE 2 CONST
N
SCALE: 3/32'=1'-O' 0 8 16 /�32 13.014 A 2,1
I hereby certify that this plan,
specification or report was prepared by
H I J K L M me dr under my direct supervision and
that I am a duty Licensed Architect
under the laws of the State of
Minnesota. //11
Edward A. Farr
Date 4/19/2013 Reg.No.16362
Project Manager
7t
O f I I hereby
zola
hereby certify that this plan.
specudor report was prepared by
me orr under my direct supervision and
that I am a duly Licensed Structural
Engineer under the laws the State
1 a of Minnesota.
1 �Johrn—�Pa�ul G—illen�.
III Y\LI'�1Q�
Date 4-19-2013 Reg.No. 21476
3 :
k
I --—_...- ----'
110 STORA(,F 0 (PHASE I
I j 1
17FST1H " . —__ ..._ __.....
_.. - 011 FT ._.........._....
11a4 url
1.1 I IT TIFlLS_IO.ILEL
rry RnnrA
I I I I
r
3 -- -- ._.. ----
I I
� I
{
1
s.
i
� I I I � -(7wc„u.nr�va�ta,.. &r:vszrl;suwo
.,. f.'c1t.Pixo-t,Minmsm 4 9:2u6'Vk�eS
g 59114 nilur.an:kci.n
PAULSON&CLARK
y ENGINEERING,INC.
2352 E.County Road 1
White Bear Lake,MN 55110
OtRc0
:(651)407-6056
Fax: (651)407.6476
Email:pac(upaulsrxtclark.-no
S
I Steiner
Construction Services,lnc.
3614 Counry Road 10 1.WAylete.\Rt SM91
Mal 473366o __%elr m.corn
Client
I ORONO MINI-STORAGE. LLC
8851 FLYING CLOUD DRIVE
EDEN PRAIRIE, MINNESOTA
Protect Location
j 3 --- ORONO METRO RV 8
MINI STORAGE
i ( I 2725 WAYZATA BLVD
J.
i i { ORONO. MINNESOTA 55356
o Issued For Do to
$ L CONSTRUCTION 04/22%2013
R
Sheet Title
LOCKER PLAN
-- 1 PHASE 2 LOCKER PLAN (REFERENCE ONLY - LAYOUT PROVIDED BY JANUS INTERNATIONAL) Protect NProtect N=er Sheet Numer
N
SCALE: 3/32'=1'-0' 0 8 16 32
13.014
/k 2•2
J A
1 hereby certify that this plan,
specification or report was prepared by
UNDERSIDE OF SLAB EXISTING WALL that rlunderaam 0uldy direct
censetlr Ar chitecvision �
CONTINUOUS SEALANT UNDERSIDE OF SLAB it.EXISTING EXISTING Minnesota laws of the/S�tat�en���-of
BOTH SIDES STRUCTURAL BACKING- wlNDow MXALTLERIOR Edward A. Farr _r�(�I�V""'
(SEE FLOOR PLANS) %RC
CEILING AS SCHEDULED EXISTING DOOR TO WINDOW FILM r Date 4/19/2013 Reg.No.16362
REMAIN:CLOSE DOOR• Project Manager
CEILING AS SCHEDULED REMOVE HARDWARE AND SEALANT
SEAL 3/4'PLY WD---
35/8:MTL.STUDS SILL.PAINTED CCOPrB1�T p1a
AT 24'O.C.
3/4'PLY WD SEALANT f hereby Certify ep that this plan.
PLAN 5/8'TYPE%GWB 2 1/2" MTL. STUDS specification or report was prepared by
VIEW BOTH SIDES PLAN AT 24" O.C. PAINTED that / am a duty Licensed Structural
GOT I BATT INSULATION me or under my direct supervision and
N-21-r =MOLD RESISTNAT GWB.PLUS VIEW 5/8" TYPE X GWB of Minnesota.
CEMENT BOARD AND VAPOR BARRIER f Minn unser the laws the tate
AT CERAMIC TILE WALLS 2 1/2" GLASS FIBREJohn Paul Gille�
BATT INSUL. - (N-03-I) 7 I
CONTINUOUS SEALANT q TYPICAL EXTERIOR LOCKER WINDOW DETAIL Date 4-19-2013 Reg.No. 21476
BOTH SIDES AND BELOW INSULATED METAL STUD
TRACK CONTINUOUS SEALANT WALL w/ 5/8'GYP BD SCALE 1 1/2' = 1'-0'
AND VAPOR BARRIER,MIN 6' __....
ACTUAL, 5" NOM. 1/ ACTUAL• 3" NOM. 16 C7 GA STUDS•16'OC,
PROVVIDE VERTICAL SLIP TRACK
AT TOP SEALANT
L/240 Hr.umrt 1 HR RATING: L/---/HT.L[M[TS NCN RATED
N-27 N-21-? N-03 N-03-[
25 GA. =13'-6" GA.
=WP 1200 N/A ASSEMBLY _---------�--_--
N-21- �• LL-
20 GA. 15'-6' UL•=1419 N/A STC =N/A STEEL STUD TTP
SEE PLAN FOR TYPE
1 PARTITION TYPE 1-21 DETAIL 2 PARTITION TYPE N-03 DETAIL
SCALE: 1 1/2'=1'-0' SCALE: 1 1/2'= 1'-0' AS REO'D94D
WALL TYE
w
EXISTING WALL "a ...._—_..—___—.—...__.._._....._._
STUD
BLE
X31 TYPICAL EXTERIOR DOOR INFILL AT ALLJAMBS ---
/-�E7oR rtaaF SCALE: 1 1/2• 1'-0' SEALANT - -
/ JOIST
HOLLOW METAL
FRAMES TYPICAL
- - - SEE SCHEDULE FOR
DOOR TYPE
\.. ......... ............................ ...
5 TYPICAL INTERIOR HM FRAME DETAIL
SCALE: 1 1/2' = 1'-0' -
EXISTING SLAB TOOL JOINT AND
NEW 6'SLAB 3/8'x 2'SAWCUT JOINT. AND WALL FILL WITH SEALANT
IDTdtE,OF W LL PAS TO REMAIN
EA B.SM ANTI: 6O N WALL ECTONE ON GRANULAR CUT WITHIN 8 HOURS
9aE to IN 1W0 OIAECTgNS BASE AFTER SLAB PLACEMENT, NEW 6'SLAB
rw A JOST BINIOW CNOXO CLEAN AND FILL WITH
PANEL POINT ELASTOMETRIC SEALANT
X1/2'DIA%18'SMOOTH - ----- ---"--_-'-
• DOWELS a 16'OC.
Q e
lo I 1ST DOWEL LOCATED 24'
E7OSf CNN wALL FROM CORNER OF SLAB
.d . NFILL EACH WAY,BRILL
6' INTO EXIST CONCRETE
xS' I�xi3xgAt ,g AND EPDXY,GREASE
1/2'DIA X 2'-0'SMOOTH EXPOSED END
DOWELS•16.OC,
CENTER ON CONTROL APPLY BOND BREAKER
JOINT,GREASE o TO EXIST SLAB EDGE
moc uo rvar ,siva vn:
falm PmMc,Minn�i-a• T:•.Y:-W'Wf<v5
SS144 ni/nya:V�cr
NON BEARING CMU WALL BRACE 7 CONTROL JOINT DETAIL g SLAB EDGE DETAIL PAULSON&CLARK
NOT TO SCALE SCALE: 1 1/2' • 1'-0' SCALE: 1 1/2" =1'-0' ENGINEERING,INC.
2352 E.C mmy Road 1
White Bear lake,NLN 55110
Office:(651)407-6056
Fax: (651)407-(A76
70, 6
Email:pacgrbaulsonclark.wm
Steiner _ee .
Conshucaon services,roc.
3614 COUnty Pm d I OI.VA"ZaG1.N1N SSW t.
(952)473-SGW —_,e.bce can
Client
ORONO MINI-STORAGE, LLC
6851 FLYING CLOUD DRIVE
EDEN PRAIRIE, MINNESOTA
Project Location
ORONO METRO RV 8
MINI STORAGE
2725 WAYZATA BLVD
ORONO, MINNESOTA 55356
Issued For Date
N CONSTRUCTION 04/22/2013
Sheet Title
DETAILS
g Project Number Sheet Number
13.014 A3.1
DATE TIME
CITY OF ORONO Ooh q3 CALLED IN
INSPECTION N911 SCHEDULED �- 3
PERMIT NO. �5� PLETED
ADDRESS-
OWNER
DDRESS OWNER AE14ONE NO��
CONTRACTOR
DESCRIPTION Atltx
❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
H ❑ FRAMING ❑ MECHANICAL FINAL
Q El TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
v ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP
❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
2 OWNERICONTRACTOR TO MEET YOU:_YES_NO
COMMENTS:
cc
W
a
J
QC
0
W
cc
Q
W
W
cc
J
d
LU/ NMK.SATISFACTORY:PROCEED AtfROJECT COMPLETE
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector.
White Copyllnspector's File Canary Copy/Site Notice
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NOP_2�?/ 00-34-3OMPLETED °l
ADDRESS
OWNER LEPHONE NO.-
CONTRACTOR
O.CONTRACTOR
DESCRIPTION �✓« ^ G% �'v
❑ FOOTING ❑ PLU I G FIN L ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MEC ICAL RI ❑ IAKESHORE/WETLANDS
h ❑ FRAMING ❑ MECHANICAL FINAL
O El TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATIOWREMOVAL
Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO
cam.,
COMMENTS-
LU
0
cc
0
U_
LU
cc
Q
2
W
Z
W
cc
W�Q WORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE
0W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
C1 BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor
lnspector,->� vv�_
101,
White CopyMspector's File Canary Copy/Site Notice
C a_i_ T TIME v
CITY OF ORONO CALLED IN ✓
INSPECTION NOTICE //� SCHEDULED _ AV
PERMIT NO.o��3-03V3 COMPLETED
ADDRESS a 7
OWNER TELE HONE NO. ��- g-373�i
CONTRACTOR 1
DESCRIPTION
❑ FOOTING ❑ PLUMB FINAL ElEXC V/ RARING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
O [I TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
OWNERICONTRACTOR TO MEET YOU:_YES_NO
C) COMMENTS:
W
CL
cc
J
O
O
UL
W
cc
Q
Z
W
Z
W
cc
OWOtpStC SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
U BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
1-1
❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (J52) 249-4600
Owner/Contractor on site:
Inspector. L2L
White CopylInspector's File Canary Copy/Site Notice