Loading...
HomeMy WebLinkAbout2008-00015 - repair & reconnect R CITY OF ORONO PERMIT NO.: 2008-00015 2750 KELLEY PARKWAY ORONO, MN 55356- DATE ISSUED: 08/116008 952 249-4600 FAX: 952 249-4616 ADDRESS 2725 WAYZATA BLVD W PIN 33-118-23-13-0019 LEGAL DESC CRYSTAL BAY BUSINESS CENTER LOT 004 BLOCK 000 PERMIT TYPE SEWER&WATER PROPERTY TYPE COMMERCIAL-BUSINESS CONSTRUCTION TYPE CONNECTI011 APPLICANT SEWER CONNECT/DISCONNECT/REPAIR 35.00 VOSON PLUMBING INC. WATER CONNECT/DISCONNECT/REPAIR 35.00 1515A5TH STS HOPKINS,MN 55343 STATE SURCHARGE SEWER&WATER 0.50 (952)938-9300 S.A.C. 0.00 Minnesota State License#:058091-PM TOTAL 70.50 OWNER RYAN COMPANIES US,INC. 50 SOUTH 10TH. STREET SUITE MINNEAPOLIS, AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due ca se. d 64 App is Permitee Signature Date I ued By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIIWD ABOVE. 07/03/2008 10:59 9529388910 VOSON PAGE 01/05 FOR. IT US£•011 City of Orono Date Received:' Pertatt r 3 A10 P.O.Sox 66 ;... �� � 2750 Kelley Parkway D 1n;.House'SAC;ljcoorniinatitia Form pomplete>1 Crystal Bay,MN 55323 wired (952)249-4600 Approved Dy(If Req;' ):. CITY OF ORONO—SEWER& WATER/GENERAL PERMIT ('Note:Some permits may require approval by the Building Official and/or Public Works Dcpm tMent') ALL P RWTS- Mnv he sub'c. t to rurthcr r•.view and Tali v vent be i.5ijped when th.n9plication is receive GENERAL INFORMATION' 1. You may apply for utility permits by mail or in person at the City offices. 2. Mailed in applications are subject to the postage and handling fee shown below. Permit cards will be sent by return mail within 2 business days. 3. Permits are not valid until you receive a permit card. 4. Work must not begin unless the permit card is available on the job site. 5. Utility connection permits may be issued to licensed contractors only. 6. Contact the Public Works Department(952-249-4600)for utility stub as-built locations. DO NOT EXCAVATE 1N ANY STREET AND DO NOT TAP ANY MAIN without express approval of the Public Works Department. Issuance of a permit does not grant this approval. 7. A11 work must be done in accordance with State Code requirements. 8. All work must be inspected before it is covered. Call(952)249-4600,24+hour notice required. TYPE OF,PERMIT Check Alf That Apply) ❑Residential(May Require Approval) E(Commercial(Approval Required) /1-�c�fr � 4New Connection ❑Additional Connect'on )6 Re-Connection ❑Repairs Disconnect Job Site/Ovvner In£oimatioin: e i +-u-t � + 2725 Wayzata Blvd West Site Address: Owner: Ryan Companies US Inc Mailing Address: 50 South Tenth Street Suite 300 City: Minneapolis zip: 55403 Home Phone: (612) 492-4000 Alternate Phone: Contractor-Information: Contractor: Voson Plumbing Inc Contact Person: Gary Address: 1515-A 5th Street South State 'License#: 67445 PM City: Hopkins Zip: 5?3g3 Expiration Date- /o)'3 I—a 008' r1 (952) 9389300 (612) 919-8020 Phone: Alternate Phone: 011/03/2008 10:59 9529388910 VOSON PAGE 02/05 rhq. .•.,,1• • .:. ..y... =o'r':='!: r. ,! 12, �� uo• •^. .,�iL;S"Hh SAC Charge(2007 Rate=$1,825.00) $ (SAC Charge must accompany all sewer permit applications unless prepaid) (Orono City Staff can determine if applicable) (If not prepaid,a sewer connection permit will not be issued) []i Sewer Connection/Disconnect 1 Repair($35.00/Per Stub) $ 3 ' C? Pipe size a inches;material sDR26 Schd 40 air tested; cast iron Water Connection/Disconnect/Repair($35.00Mer Stub) $ pipe size 9 312 inches;material "00 Schd 40 air tested; copper 1. SUBTOTAL of Permit Requested: $ 2. STATF-SURCHARGE $ .50 3. POSTAGE&HANDING(Only on Mail-In Applications) $ 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ U ADDITIONAL INFORMATION-WATER.METERS ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a sept. ■ WATER METERS must be set and sealed by Orono Water Department (952) 244-4600, upon completion of meter installation. The undersigned hereby applies to the City of Orono for issuance of a Utility Permit,agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all stateme made on this application are,true and correct. 07/03/08 Applicant: Date; �•t .i+.'s'A ..�•�,.. w' r,M.ol.'rr� :a'i�i;�:.'ML`ti 01107/2008 15:01 9529388910 VOSON ORcINO 64�1 PAGE 07/09 MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY Division of Construction Codes and Licensing REPORT ON ANS Plans and specifications on plumbing: Crystal Bay Business Center II,725 Wayzata Boulevard,Orono, Hennepin County,Minnesota,Plan No.087584 OWNERSHIP: SUBMITTER(S): Voson Plumbing,Inc., 1515-A Fifth Street South,Hopkins,Minnesota 55343 plans Dated: June 3,2008 Date Received: June 18,2008, June 3,2008 Date Reviewed: June 19,2008 SCOPE: This review is limited to the design of this particular project only insofar as the o ge�tecf rn ato which Minnesota Plumbing Code,as amended,apply,and does not cover the water supply this plumbing system is corneeted. The review is based upon the supposition that the data on which the design is based are correct,and that necessary legal authority has been obtained to construct the project. The responsibility for the design of structural features and the efficiency of equipment must be taken by the project nt upon satisfactory disposition of any requirements included in this report. designer. Approval is contingeare special care should be taken to insure that the material and installation t °f rovedplans and speeiificati ns should with the provisions of the Minnesota Plumbing Code_ A copy PP p be retained at the project location for future reference. A set of the identified plans and specifications is being returnedtooson Plumbing,Inc. Enclosed is a copy of e the report and transmittal letter to be forwarded to prof INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830,no plumbing work anairy test covered prior to completing the required tests and inspections. Provisions must 7b5 2$0 subpart for �of�e code. at the time of the roughing tan inspection as outlined in Minnesota Rules,p art A manometer test,as specified in Minnesota Rules,part 4715.2820,subpart 3,is required at the time of the fimished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota when an installation for a state contract job,licensed facility,or project in an Department of Labor and Industry authority is ready for an inspection and test. To schedule inspections, area where there is no local administrative contact the state plumbing standards representative for your region,or call Jim Peterson at 651/284-5889. REQUIREMENT(S): e 18,2008,letter shows 1. Item No.3-4 of your Junthat you put a 3-inch full-size vent on the flammable waste le waste interceptor may not be used to satisfy Items Nos interceptor. Please note,the vent on the flammab . 3 and 4 of my June 13,2008,request for additional information. a. The flammable waste interceptor outlet is more than 25 feet from a vented drain. Therefore,the discharge line trust be provided with a 2-inch minimum vent pipe installed within 25 feet of the interceptor(see Minnesota Rules,part 4715.1120). This vent must not conmect with the vent serving the flammable waste interceptor. b. The submitted plans do not appear to show a full-size vent stack. l full-sizeart 4vent 52a(3-inch I)• This nunimum)must be provided for every building(see Minnesota Rules,p stack must be continuous in size from its base to its termini, he 3 lshould cl�is ick obe n the flammablmost remote e stack the location where the building drain leaves the building. interceptor may not be this stack verify that a code complying plumbing system will be installed. 0?I�T/2008 15:01 9529388910 VOSON PAGE 08109 Crystal Bay Business Center II Plumbing plan No.087584 Page 2 June 19,2008 2. The flammable waste interceptor shall be constructed in ac l dance with the Minnesota Plumbing Code, Minnesota Rules,part x4715.1120. The interceptor a. A minimum holding capacity of 35 cubic feet. b. At least 3 feet of depth below the invertof the discharge pipe. 18 inches On the Outlet' c. A water seal of not less than 3 t d the �ugh�roof The vent must rise vertically or d. A minimum size 3-inch vent m within 45 degrees of the vertical to a point at least 6 inches above the intereeptar. The vent shall be constructed of approved metallic pipe material. and be at least 3 inches in size. e. Drains that discharge into the interceptor shall be designed to drain dry, cessible for service and maintenance. f. The interceptor shall be located so it is readily ac ly when Periodic testing is 3. The installation of reduced pressure zone backflowpre�the isp # ovc authority. Testing int�ls done by a trained backflow preventer tester acceptable shall not exceed one year,and records must be kept. All devices must be tested after initial e.The assure that debris from the piping installation five yea=s. The installnot interfered with atiofunctioning£nkflow preventers must devices shall be overhauled at least on every be at least 12 inches,but not more than 6 feet above the finished floor or ground level. This is in reference to the RPZ connection on the water supply line to the irrigation system. 4. If a water softener will be installed,then please note,that the floor drain to receive th�6 0,subpart 4• er softener discharge must be individually vented in accordance with Minnesota Rules,part 5. Changes in direction in drainage piping must be made by appropriate use of wyes and bends. Sanitary tees are not allowed where the direction of flow changes from either vertical to horizontal or horizontal to horizontal(see Minnesota Rules,part 4715.2410). 665, 6. PVC plastic pipe used for the drain,waste, and vent system shall azcto l5 with 0600) Solvent we d joints in PVC D2949 or F891 (see Minnesota Rules,part x4715.0570 through p color to the a and cement(see and CPVC pipe must include use of a primer which is of contrasting A1P Minnesota Rules,part 4715-08 10,subpart 2). 7. Plastic pipe must be installed in accordance with Minnesota Rules,part 4715.0580(1)and part 4715.0600. Above-grade horizontal runs of plastic waste and vent pipe cannot exceed 35 feet in total length. Above- grade vertical stacks constructed of plastic pipe may exceed 35 feet in total height only if an approved expansion joint is used. 8. The cast iron specified on the submitted plans as an optional material for the drain,waste,and vent must meet the quality standards specified in Minnesota Rules part 4715.0570 through 4715.0600. No quality standard is specified for this material- 9. No material is specified for the rainwater leaders. Verify that pipe materials e 60.to be used for the rainwater leaders will comply with Minnesota Rules,parts 4715 8h 10. Disinfection of the potable water system must include the following(see Minnesota Rulcs,part 4715.2250): a. The pipe system must be flushed with clean,potable water until no dirty water appears at the points of outlet; (J-00�712008 15:01 9529388910 VOSON PAGE 09109 Crystal Bay Business Center U Plumbing Plan No.087584 Page 3 June 19,2008 b. The system must then be filled with a water chlorine solution containingatleast 50i parts mer milionlion of chlorine and allowed to stand for 24 hours;or a solution containing PaP Of chlorine and allowed to stand for threeh urs; a lmust be flushed with clean potable water until no c. Following the allowed standing �system cblorine remains. 11. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. This includes all portions of the storm sewer located within 10 feet horizontally of the building or water service piping. NOTEM: 1. The scope of this project consists of the construction of a new shell building. The plumbing installation includes a trench drain,a flammable waste interceptor,a floor drain,hose bibbs, an irrigation system, and interior roof drains. 2. This facility will be served by new municipal sewer and water service nn ons The site utilities for this project are reviewed under Plan No.087547. 3. The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepared the plans may use the plans for construction. If another plumber is contracted to install the plumbing,:they must submit their own plans and specifications for the project. 4. The Minnesota Plumbing Code is available on our website at:www d011 state A I I su I(P-11 Mbim.h 1. Authorization for construction in accordance with the approved plans may be withdrawn if construction is not undertaken within a period of two year's. The fact that the Plans have been approved does not necessarily mean that recommendations or requirementsknowledge lc�g�will oot be made at n cme later , time when changed conditions, additional information,or advanced Approved: �Marise A.Widmer Public Health Engineer Plumbing Plan Review and Inspections Unit 443 Lafayette Road North St.Paul,Minnesota 55155-4343 6511284-5887 MAW:jat cc: Project Owner Voson Plumbing,Inc. Mr.Lyle Oman,Building Official File