Loading...
HomeMy WebLinkAbout08-07-1997 ret check for demo permit F /4) CITY of ORONO Municipal Offices Street Address: Mailing Address: 9kES110). 2750 Kelley Parkway P.O. Box 66 ___ Orono, MN 55356 Crystal Bay, MN 55323-0066 August 7, 1997 Mr. Jay M. Jasper Jasper Development 219 E. Frontage Road Waconia, Minnesota 55387 Re: 372 West Lake Street, Orono, MN Dear Mr. Jasper: In connection with the above property, it is our understanding that you no longer are interested in obtaining a demolition permit. Therefore, we are returning your check in the amount of$140.50. Sincerely, C:f4a(QAMOA--- Lyle Oman Building Official LO/ch Enc. Telephone (612) 473-7357 • FAX 473-0510 S. a CITY OF ORONO APPLICATION FOR DEMOL98 FIIT P.O. Box 66 (2750 Kelley Parkway) Crystal Bay, MN 55323 MAR 0 6 1991 SPECIAL CONDITIONS & HOLD HARMLESS AGREEr i F uRoh,' General Instructions 1. You may be required to obtain other permits, i.e. burning, well abandonmment, etc. 2. Work must not begin unless the permit card is available on the job site. 3. A 24 hour notice is required for all inspections. Call 473-7357. JOB SHE ADDRESS: 372 West Lake Street, Orono. i•;:; Occupancy Type: XX Residential Commercial OWNER'S NA`M: Jay H. Jasper Phone: 612-442-5611 Mailing Address: 219 E. Frontage Road City: Waconia, MN CONTRACTOR'S NAME: Jasper Development Bus. No.: 612-442-5611 Mailing Address: 219 E. Frontage Road City: Waconia, MN Demolition if planned by means of: manual disassembly •. heavy equipment burning (by fire department) Permits Issued: # Burning Fire Department # Well Abandonment In return for issuance of said Demolition Permit, the undersigned owner hereby agrees as follows: 1. The structure(s) shall be kept enclosed and/or secured until such time as demolition is complete. 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless specific prior approval is obtained in writing for temporary use thereof. 3. Foundations shall be completely removed from the ground. 4. All demolition debris shall be completely disposed of off site in accordance with all applicable PCA requirements. 5. Water wells must be abandoned in accordance with State Health Department regulations. 6. Inspection required when all debris has been removed, before backfilling. 4 1 7. Within 5 working days of superstructure removal, a final inspection shall be requested. The site shall be left clean and clear of all debris, with any excavation filled with earth level with the adjacent ground elevation (except when such excavation is to be used as part of a new building and such new building is actually under construction). 8. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, employees and assigns from and against all claims, damages, losses or expenses, including attorney fees, against the City, its agents, employees and assigns arising out of or resulting from the demolition described herein as performed by the property owner, his employees, agents, subcontractors or assigns. PERMIT TYPE AND FEE CALCULATION t $50.00 -Principal Structure .3 $30.00 - Accessory Structure / F c; 1. Subtotal of above permit requested $ Vo 2. State Surcharge $ .50 3. TOTAL PERMIT FEE (add lines 1-2 above) $ /`-/O The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. APPLICANT'S SIGNATURE: )\ Date: 5---.5 .9 (— , , -> __,oil'- OWNER'S SIGNATURE: �� Date: - ,) f) i \r'l APPROVED BY: `�7 Date: - 7