HomeMy WebLinkAbout1995 - stop work- must remove dock DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED / ,..s._,-
PERMIT NO. COMPLETED (o Zl--0.0
ADDRESS eS I/ 0 L("I-7
OWNER CONTR. ll
TELEPHONE NO. /�) ,(��
3: DESCRIPTION 5--- v rp `�' o
LU 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
h 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
• 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
44 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
Q OWNER/CONTRACTOR TO MEET YOU:_YES_NO
• COMMENTS:
4.1
t. c. 0 • /.3 0 04---
cc
0
cc
a ,� 4� u
0
Lc2 ii- 0400ed INvvivviedr\a4--eiei 4
c,
1....
u.,
bt11,
f'D o
1)
.... Ci v C� n� Fri c6 � s'
y g9�
d
W ❑WORKS ISFACTORY:PROCEED ❑ PROJECT COMPLETE
CC ❑CORRECT WORK&PROCEED U ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
0 BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN
\ / INSPECTOR WILL RETURN
,�(STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED
/❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
1
Owner/Contractor on sit \ I�' `it�,
Inspector. )rt). CE GE
White Copy/Inspector's File Canary Copy/Site Notice
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. COMPLETED 4' 0 0 �i ii l'SO
ADDRESS3Ocl LA e• 1—a.Le 30?
OWNER C. Y'el 'P-1 1 CONTR.
TELEPHONE NO. r
DESCRIPTION
W 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y
Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
• 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
IL 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
q OWNER/CONTRACTOR TO MEET YOU: YES NO
o COMMENTS: 6._ ,-,
gr
Lu l'e-0 — 1--7-1— (ii; ,,( out-PQ.
cc
-1--�\� '' j� Gtr O 1 ��
O
4,
41-tc)(0 --__ _ ----r_i=r—oLAT- 01,_--
cc
cd.)
k.
1lA,
W v(l cc
z �� O Qr vt
Lu
47Z- 7A5?
°
W El❑WORK SATISFACTORY:PROCEEDPROJECT COMPLETE
CC ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
UO BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑, PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
Owner/Contractor o tte-
Inspector. `a c., U G, 1
White Copyllnspector's File Canary Copy/Site Notice