HomeMy WebLinkAbout1996 - 007804 - grading PERMIT
CIT% OF ORONO PERMIT TYPE:
2750 Kelley Parkway- P.O. Box 66 Permit Number: t t'='F-I f)i~.F I NEL
Crystal Bay, Minnesota 55323 t`it i7 +�4
Date Issued:
(612) 473-7357 04/18/q6
SITE ADDRESS:
2601 WEST LAFAYE T TE RD
JB
P . _ . N . . 21-117-23-21-0003
DESCRIPTION:
GRADING
User Permit Type LAND ALTERATION
REMARKS:
FEE SUMMARY:
Pa=;e Fee s 0 i�0
Total Fee %0. O0
CONTRACTOR: - Applicant - ST . LIC OWNER:
CONCEPT:E FST I_ANDSC:AF'IN{ ; INC . 147241F: 89q 7 OL'-:ON 1)tU J ,
3153 PRIEST LA 6804 CHEYANNE TR
MOUND t`MN 5,5364 EDINA NA MN 65439
: '
(61 ) 472-4118 471-9350
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS
SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF
ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS.
L_
/.
()
APPLICANT PERMITEE SIGNATURE ISSUED BY:SIGNATURE _.,14-y
Total Fee: $ ` C - C--A) DateReceived:
Date Approved:
Entered By: Permit#: , 6 ci
CITY OF ORONO - BUILDING PERMIT APPLICATION
ALL INFORMATION MUST BE SUBMITTED IN FULL BEFORE PLAN REVIEW WILL
BE STARTED
THE APPLICANT IS: (circle one) OWNER OR CONTRACTOR
JOB SITE ADDRESS: 9,6 o ► �a� t�- i ZIP:
NAME OF OWNER: )o O PHONE: (home) 1171 - 935
(work)
MAILING ADDRESS: 680,4 7r, CITY: 7A ,. o` ZIP:
CONTRACTOR: (2 c F.f �^- -- PHONE: 7L - L4 1 Sl
MILE PHONE/PAGER: 7S0 - 3`7 W
MAILING ADDRESS: 3 1 S P CITY: fou.--e( ZIP:
STATE LICENSE: # o as 3
ARCHITECT/ENGINEER: PHONE:
MAILING ADDRESS: CITY: ZIP:
NAME: REGISTRATION #
TYPE OF WORK: New Addition Accessory Structure
Move Remodel/Alteration Land Alteration
PROPOSED WORK(describe indetail): fi n. c
eptax a
STORIES: SQ. FEET OF EACH FLOOR:
NO. OF BEDROOMS: GARAGE STALLS: ATT. DET.
ESTIMATED CONSTRUCTION VALUATION(excluding land): $
I hereby apply for a building permit and I acknowledge that the information above is complete
and accurate; that the work will be in conformance with the ordinances and codes of the City
and with the State Building Code; that I understand this is not a permit and work is not to start
without a permit; and that the work will be in accor'ance with the approved plan.
APPLICANT'S SIGNATURE: �! _ DATE: 3 --19 - `JL
NOTE! Parade of Homes events require separate permit approval by Police Department and
City Council 60 days prior to the event. Non permitted events will not be allowed.
•
Sec.13.04 RIGHTS OF SUBJECTS OF DATA
Subd. 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section.
Subd.2. Information required to be given individual. An individual asked to supply private or confidential data concerning himself shall
be informed of: (a)the purpose and intended use of the requested data within the collecting state agency,political subdivision,or statewide system;
(b)whether he may refuse or is legally required to supply the requested data;(c)any known consequence arising from his supplying or refusing to supply
private or confidential data;and(d)the identity of other persons or entities authorized by state or federal law to receive the data. This requirement shall
not apply when an individual is asked to supply investigative data,pursuant to section 13.82,subdivision 5, to a law enforcement officer.
The commissioner of revenue may place the notice required under this subdivision in the individual income tax or property tax refund
instructions instead of on those forms.
Subd. 3. Access to data by individual. Upon request to a responsible authority,an individual shall be informed whether he is the subject
of stored data on individuals,and whether it is classified as public, private or confidential. Upon his further request,an individual who is the subject
of stored private or public data on individuals shall be shown the data without any charge to him and, if he desires, shall be informed of the content
and meaning of that data. After an individual has been shown the private data and informed of its meaning,the data need not be disclosed to him for
six months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been collected or created.
The responsible authority shall provide copies of the private or public data upon request by the individual subject of the data. The responsible authority
may require the requesting person to pay the actual costs of making,certifying, and compiling the copies.
The responsible authority shall comply immediately,if possible,with any request made pursuant to this subdivision,or within five days of
the date of the request,excluding Saturdays,Sundays and legal holidays,if immediate compliance is not possible. If he cannot comply with the request
within that time,he shall so inform the individual,and may have an additional five days within which to comply with the request,excluding Saturdays,
Sundays and legal holidays.
Subd.4. Procedure when data is not accurate or complete. An individual may contest the accuracy or completeness of public or private
data concerning himself. To exercise this right,an individual shall notify in writing the responsible authority describing the nature of the disagreement.
The responsible authority shall within 30 days either: (a)correct the data found to be inaccurate or incomplete and attempt to notify past recipients of
inaccurate or incomplete data, including recipients named by the individual; or(b)notify the individual that he believes the data to be correct. Data
in dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data.
The determination of the responsible authority may be appealed pursuant to the provisions of the administrative procedure act relating to
contested cases.
DATA PRIVACY ADVISORY
In accordance with M.S. 13.04, Subd.2, "Rights of subjects of data", we would like to inform you that your request
for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or
confidential information.
You are notified that:
1. The information you furnish will be used to determine your qualification for the permit or license requested.
2. You may refuse to supply data, but refusal may require that the City deny the permit or license.
3. The information may be shared with other local, state or federal agencies to the extent necessary to process
the permit or license.
4. If your requested permit or license requires Council action to approve, some information may become
public.
5. You have certain rights under M.S. 13.04 (available upon request) to review private data on yourself.
6. Your full name is required to process this application or permit.
Ccrri c e "fr air
First
fiddle Last
3' S.3
Address
City State Zip Phone
I understand my right as above
Signature .a
CHECK OFF LIST FORISSUANCE
E OF PERMITS
FOR OFFICE USE
ADDRESS OR LEGAL: 12.__6(3k w • L.A Foy c'.TTS PID:
DESCRIPTION OF WORK: GR�4VtN(o
DATE APPROVED: 3•2-1-9 6
ZONING REVIEW BY: DATE APPROVED:
BLTLDL?G REVIEW BY:
FEES TO BE CHARGED: 6 to
Misc. Fees Calculated By:
PERMIT Yes CONNECTION REVIEW Yes No 1----- SEWER
STATE SURCHARGE Yes No WATER CONNECTIONP FEE
SAC -Yes
INVESTIGATION FEE Yes Noo SITE liNSPECTION
OTHER (specuy)
Number of SAC units
ZONE G CHECK LIST
Zoning District: LA.-/13 Shoreland District: VCE-S
Fire Department:
st Office: School District:
Lot Area: Sq.ft.
Acr sWidth Depth
Survey Submitted: Yes _le_
No Date of Survey: ew F'w
Proposed Setbacks: Right Side:
Front (Lake):
Rear (Street): Left Side:
Adjacent Structures:
Wetland:
Building Height: Def. Hgt.
Peak Hgt.
Avg. Setback:
Bluff Setback: Lot Coverage:
Existing Proposed
Hardcover: 0-75'
75-250'
t� 250-500'
iti
500-1000'
Hardcover Variance Required: Yes No Date of Council Approval:
Grading: Staff Approval Date: Bv: Council Approval Date:
Septic: Staff Approval Date: By:
Resolution: # Resolution Date:
Zoning File: #________ '
RE�I-IARKS (in house):
26
BUILDL'rG REVIEW CHECK LIST
UBC: A///9 CONSTRUCTION TYPE: __-_—_—_j____- _____-----
Sq Footage S Per Sq Ftg
Basement
1st FIoor z
2nd Floor x
Garage x =
x
TOTAL
/1InsEstimated Construction Value: S_______ /1-----
Inspections
pections Required: Work Requiring Separate Permits:
Plumbing Fire
Site Water Connection
Hardcover Removal Mechanical
Septic Sewer Connection
- Footing Lawn Irrigation
Framing Fireplace Other
(Masonry)
Insulation (Mfg.) Well (State Permit)
Wall Board Electrical (State Permit)
DC Final Grading/Filling
Other �—
REMARKS (LN HOUSE):
REVIEW BY OTHERS:
DATE:
Access: Existing
New ___._
Access Approval: Dace
By:
________
REMARKS (TO BE NOTED ONPER:V :
27
Concept Landscaping Inc.
3153 Priest Lane,
Mound, MN 55364
City of Orono
att Lyle 3/16/96
Permit Request---Dr. Doug Olson 2601 West La Fayette, Orono
Clean-up and enlarge run-off storage area
The Olsons presently have an existing water run-off sediment pond on their property (see
sketch) that collects run-off water coming from Ann Mathews, Paul Ekholms, and Brad
Blankenships property. The water fills the sediment pond and slowly seeps into the
ground. The project was built many years ago and the drainage ditches going to the
sediment pond need to be cleaned out and the sediment pond probably drains slower now
than when it was built. However, Blankenships have a beautiful natural woods that is
continuously being flooded out due to lack of proper drainage and storage. Also, Olsons
yard gets flooded.
We propose to properly clean out the ditches, and enlarge the pond (see sketch). The
excess soils will be graded level in the yard, so there will be no soil removal from the
property and less than 100 yards of soil will be adjusted. The yard will be resodded as
necessary.
Sincerely
James H. Smith, Pres.
.011‘w
dr--, ..c` .,
. 5. ! . ar-. . . . • • . . . Ott .. L
A k ic
P /
3+
0 . -
1- / (k, ) I . e
,' 0 ycy I \. •• .
to
w o ! ti \ t•t\ Q 3
NO O ti ,I Vraci VI
. vt......r )
adi
h ‘ , Tho
W 3
• I K .
. •;- M
Y
I '
.,). \N\ . ..il
44* 1 4 , S
It '7
t ..
1 1)
44.re.__ \
• • 04 \
r
• . .. — • �~
s. .Z's.
A 4! f
0
o�
s1 2 r ':/'''. 1-‘
i ' ♦y i
2 4t o \ r'/ :1
2 Q' //&; '
V1 ct
.c I 1 ( •;
Q
2 1 ( iO
o 4
i
QBE , 1 � : ovr.,.G2 4w
- j
z\ --1,...._0 I \I
111.
t 41 Jfrao
/
c. r/ it . 1
._.___---,
-i
•V j .
it 4
1
I
•
•
Bot'NOARY SuRvey Foe.: ,
� M,2. D. O ANDREAS
Prepo-co' By_ •
Sc!-/DELL 0 MAOSON, INC.
Eny/nee-s� •vPY� ETON� N %,na
� \ M�NN
LAKE \ 111
M°►Ter``• \
-, --�'1
• U \:,
N
M _op
\' \� Ll'�
.
1
li
T !!t T \\ \ I •-O.nef.. /7m m.r,f found...•.._...-__._. -.
� • \ \ •-Aar.•/so Mao m..a,..nenJ:.A
�U i/�
Ietp •.
7 •
1(�� I Mnby certify Mat this is a true and correct npnw+tat(on of•survey of
the boundaries of,
•�fedt Trouts C and 1,Registered Land Surv.y'No. 131,files of Reg(atrar of nit's.
Carroty of Menneptn.
Subject to a perpetual right and easement for drivevey purposes over said tract f.
/ Md of U.Location of all buildings, if•••••7. th.reon,and all vfaib/.encroach-
,- Rents, if any, from or on said lard. As surveyed by a.this 1411,day of July,
If 1971.
1'' I IO-/✓ ✓-
7.�. - J .
• U yj • Land Surveyor.,Minn.Reg. No.4.734
4 Ii
SAF \
, . �,
Form for use with Minnesota Rules part 7670.0475,Subp.2
1 & 2 Family Residential"Cookbook"Method
(
SITE ADDRESS City
240/ 1,1t- 7- /A l� & City
le
BUILDER / Oak
11 ,4/1 (k�jtber gifi-Dg5 ')• 1 . 96
Minimum Criteria:
Rim Joist R-I9 insulation Foundaton Windows: insulated glass. 1R"air space.wood or vinyl frame
Entr) doer\ I1 inch solid wood with storm or better
STEP l Window & Door Area STEP 2 Calculate area as a percent of wall
Total Window & Door Arca in Sq. Feet Box A(window & door area)divided by Box B (total
WINDOWS (including foundation windows): wall area)times 100 equals the window and door area
Dimensions Qnty. Area as a percent of wall area(Box C).
(r'-0° x I'- G'' I 23. 1 BoxA 139�•l
1- ()'
x �' 1 32 I BoxB 6202 5 x 100= 2/,� C
Z' J' x 6-O' 2 20
21 (^, x 5, �,. ' Z 2 STEP 3 Design Features
( 4'4_-- x '-n„ 1 22,5 ASSEMBLY OPTION
6,1-0" 3( 6.2—'-OP 2 d FRAME WALL:
ep !" x 5,_(),, I X2,9
2/-- (0'• x �J / /3, 6 STANDARD FRAMING x
61-0" x 1-6,'' Z (.G ADVANCED FRAMING
21-0" X =0e' Go CAVITY INSULATION I R- /6 I
2'-6," x ( O ' /3 _ 14�
DOORS: SHEATHING:
LESS THAN R-Sp(
(/O" x e'-n'I I 46 R OR MORE
/\
I-0" x I- f I I �G WINDOWS(except foundation windows):
ID' 0'' x (5,.. 6'' I VIMU-FACTOR I U-G ,_�
Total Area of ( xii NM
Window& Doors
From the table,determine the maximum percent window
Total Wall Arca in Sq.Ft. & door arra for the design options selected and enter the
Wall Total Perimeter Height Arca value in box D below:
27.5 - 9!-O" 23/75
319 KY-6" 3 19p 2.0 D
- 9' 0" (-25
10 Box C must be less than or equal telex D
Total Area ZS?.�B
of wall
V
ti
Form for use with Minnesota Rules part 7670.0475, Subp.2
1 & 2 Family Residential"Cookbook"Method
SITE ADDRESSII // City
•
.2-70 / A
L/ /AfAfl1 gni) (2267io
BUILDERDate
/��F Joilar 1-3),(4,,xs -7• I. qG
Minimum Criteria:
Rim Joist: R-19 insulation Foundaton Windows: Insulated glass, 1/2"air space,wood or vinyl frame
Entry doors: 1'/4 inch solid wood with storm or better
STEP 1 Window & Door Area STEP 2 Calculate area as a percent of wall
Total Window & Door Area in Sq. Feet Box A(window & door area) divided by Box B (total
WINDOWS (including foundation windows): wall area) times 100 equals the window and door area
Dimensions Qnty. Area as a percent of wall area (Box C).
-b x (v' O'' IZL BoxA x 100=
x V-O" 42
BoxB C
-v" X G'-n" I 34
x STEP 3 Design Features
x �� �,, ASSEMBLY OPTION
G ' G x ('-0" 3 11-7 FRAME WALL:
'0'' x G '-D' 1 q�
STANDARD FRAMING
x
X ADVANCED FRAMING
X CAVITY INSULATION R-
X
DOORS: SHEATHING:
LESS THAN R-5
�, o„ X �, g„ 4
R-5 OR MORE
X WINDOWS(except foundation windows):
X _
Total Area of U-FACTOR U-
Window & Doors A
From the table, determine the maximum percent window
Total Wall Area in Sq. Ft. &door area for the design options selected and enter the
Wall Total Perimeter Height Area value in box D below:
3j9 /p'-O” 3196,b D
G'25, o
(amt ) MO. 6
Total Area Box C must be less than or equal to Box D
of wall B
V