Loading...
HomeMy WebLinkAbout2004 - Sanitary Sewer Assessments 1 O CITY of ORONO `S ti Municipal Offices Street Address: Mailing Address: ��9 46) Street 2750 Kelley Parkway P.O. Box 66 kE88� Orono, MN 55356 Crystal Bay, MN 55323.0066 October 26, 2004 Dear Project Area Residents; Sanitary Sewer Assessments 1. Assessment Amount and Time Period. The assessment amount adopted for your property is$6,4000.The assessment will appear on your 2005 tax statement and is for a 15-year period 2. Interest Rate. The interest rate applied to the assessment is 6.25%. 3. Initial Prepayment Period. The final date for full or partial prepayment of the assessment without interest is Monday,November 30th, 2004. 4. Future Prepayment Periods. Beginning in 2005, and every year thereafter, the remaining outstanding assessment may be paid off in full before November 15th, or interest will be charged through December 31 of the next succeeding year. Senior Citizen Assessment Deferral Owners of homestead property who are 65 years or older may apply for a deferment of the special assessment if they meet the income criteria set forth in City Council Resolution#2864. Sanitary Sewer Connection Information The new sewer system is available for connection by property owners. The property owner is responsible for the sewer connection between the service stub,at the property line,and the house. The sewer connection must be completed by a licensed plumber, and the plumber must obtain a City sewer connection permit before beginning work. The connection permit fee is $35.00. The City does not make recommendations on specific plumbers to use for sewer connections.It may be prudent to obtain quotes from several contractors for this work and to also verify contractor references and previous experience. Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us - a The Sewer Availability Charge (SAC) must be paid to the City before the plumber can be issued a sewer Connection permit. This SAC fee is submitted by the City to the MCES(Metropolitan Council Environmental Services) and helps finance the cost of the reserve capacity built into the MCES sewer interceptor system for new sewer connections. The 2004 SAC fee is $1,350 and this fee has been increasing by $50 each year. The SAC fee must be paid in the same year that the sewer connection is completed. A pressure sewer system was installed in this neighborhood which requires the purchase, installation, and maintenance of a grinder pump. Progressive cavity grinder pumps that are capable of pumping at a constant flow rate over widely varying pumping head conditions are required for connection to this pressure sewer system Environment One (El) brand pumps are the most common and widely used pumps for these types of pressure sewer systems. The plumber will need to provide the City information on the type of pump used when obtaining a sewer connection permit to ensure that the correct type of pump is installed. Thank you for your assistance in this matter. Please contact me at 952-249-4621 should you have any questions. Sincerely; 0--/ZA Greg Gappa Director of Public Services SEPTIC SYSTEM INFORMATION THIS ITEM HAS BEEN STREET ADDRESS /g'T �/ ST �jgrvj AP-2) MICROFILMED LOT /y BLOCK / SUBDIVISION F;)/e/v1 47 2cN MONTH AND YEAR TESTING DONE ITEMS ALREADY COMPLETED /k,.) NEED TO COMPLETE BEFORE ISSUING BUILDING PERMIT - ,:, BORINGS PERC TESTS 0 SYSTEM DESIGN SITE PLAN O OTHER SUBDIVISION FILE NO. 37 DATE THIS SHEET FILED 7-/3 -ce2_ BY-'. /� l