HomeMy WebLinkAbout1996 - no permit/stop work DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. COMPLETED �' 1- 96- / 2 'Oc'
ADDRESS 2 ( tv l-4-i
OWNER CONTR.
TELEPHONE NO.
DESCRIPTION
01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLJNG
02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
• 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
• 05 FINAL 14 SEWER HOOK-UO 06 PROGRESS
07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT
Q 07 DEMO—FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
W• 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION REMOVAL
• OWNER/CONTRACTOR TO MEET OU:_YES NO
j)
• COMMENTS• C_ 2- L
W
IWZ(42( )1,14457- /SSv'-eca
cc
.-wer(kx,.J
6 e 1 ( ArS 0-00
cc
d
W 0 WORK SATISFACTORY:PROCEED L PROJECT COMPLETE
CC ❑ CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
• ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS.
INSPECTOR WILL RETURN C PHOTO TAKEN
OP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
OwnerlContra v
`,iL
Inspector
White Copy/Inspector's File Canary Copy/Site Notice