HomeMy WebLinkAbout2006 - requirement of septic system inspections :::„...:::_.„:„..,.,.....,
j, ® ;„
' , ofR 1
Municipal Offices
Street Address: Mailing Address:
-4-k.s 01-- 2750 Kelley Parkway P.O. Box 66
Orono, MN 55356 Crystal Bay, MN 553230066
To: The Current Owner of Address 6 0 2 3 CJo i3 cr H '1 i S
City Ordinance requires that onsite sewage treatment systems in Orono be
inspected on a periodic basis. The onsite sewage treatment system at the above
address has been inspected and the following is known about the system. A
sketch of the known components of the system is available for most properties at
the Orono City Hall.
Imminent Public Health Threat
Yes �
No 1,`
If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10
days of receipt of this notice. The septic system must be brought into compliance
within 90 days. Failure to do so will result in referral to the City Attorney for
legal action.
System Identif as Non-Compliant
Yes
No
If yes, system must be brought i ompliance by:
December 31, 2007
December 31, 2010
Other
Septic Tank(s) Pump out Needed .
Yes
No `✓--.-
The City recommends the septic tank(s) and/or lift tank be serviced and pumped
out every three years. City records indicate the tank(s) were last pumped out on
el- i 3.- ci;j . The tank(s) should be cleaned through the manhole and
not through the inspection pipes, this allows for proper cleaning.
Comments:
u,,,4...�‘A.,,24,..4....5,,. "yea=:�.}„% ,�'< y
Inspector: Date of Inspection, i r'�`
Telephone (952) 249-4600 . Fax (95%) 249-461,6
WV,W.c_.orOnO.M .S