Loading...
HomeMy WebLinkAbout1997 - 009128 - new residence PERMIT CITY OF ORONO PERMIT TYPE: 2750 Kelley Parkway- P.O. Box 66 , Permit Number Crystal Bay, Minnesota 55323 Date Issued: (612) 473-7357 0E/2E-,/ SITE ADDRESS: WEAR LA N P DESCRIPTION: NEW RESIDENCE Building Permit Type SGL FAMIY-NEW kuilding Work IypiR RESIDENCE , •- r“• ..t) ,Jou ..onstruction lype VN3 Zoning RR-18 rus 101 1 -- FAM . DETnCH REMARKS: sEPAArE F:RmITS 1,!EWIRED FOR PL8G, MECH, SEP-11C , FIREPI ACE, LAWN IRRIGATION AND STATE WELL PECTRICAL FEE SUMMARY: VkLUWIUN $17/ : 000 s e e 1 172 . 2S Plan Review $761 . 96 Surcharge Total Fe,.-a $2, 012 . 71 CONTRACTOR: APPi cant - ST . LIC: OWNER: CULSUN CONST 14740383 22S3 .:OLSON CONST INC 21470 EXCELSIOR 214"/O EXCELS: R ON .'7':S331 ExCELSIOR THE UNDERSIGNED HEREBY REQUESTS PERMISSION 10 MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF L_ ORONO ORDP%-iNt:ES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS . /PERMITEE SIGNATURE ISSUED BY:SIGNATURE 7/ Total Fee: $ , 6 I , "7/ Date Received: c,/2,,A Entered By: Permit#: (7/ CITY OF ORONO - BUILDING PERMIT APPLICATION All information must be submitted in full before plan review will be started. (please print all information) THE APPLICANT IS: (circle one) OWNER OR CONTRACTOR JOB SITE ADDRESS: 7 �, ZIP: OF OWNER: .,f,) PHONE: (home) y7 G'5,5.'3 NAME � � ti �� J�. ! / (work) 1‘.; < o 6.5 7 MAILING ADDRESS: ,2/ f �� , ('�'� is`" CITY: X&,,�-, ,ti ZIP: .,S'3 3 CONTRACTOR: (y, !S y y/ PHONE: ._5 A t '" CONTACT PERSON: S A /if MOBILE/PAGER: MAILING ADDRESS: CITY: ZIP: STATE LICENSE: # ipo2 `"_ ARCHITECT/ENGINEER: IJ t /47"-/ 14,L c- PHONE: E,' MAILING ADDRESS: ,' TY: ZIP: NAME: REGISTRATION# TYPE OF WORK: New '\ Addition Accessory Structure Move Remodel/Alteration Land Alteration PROPOSED WORK(describe in detail): A; (,Ci //c5 GL S STORIES: =r' SQ. FEET OF EACH FLOOR: 1 7.'?2 7,4.til ` y 'v1,44/w NO. OF BEDROOMS: GARAGE STALLS: ATT. DET. ESTIMATED CONSTRUCTION VALUATION (excluding land): $ / CC I hereby apply for a building permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of the City and with the State Building Code; that I understand this is not a permit and work is not to start without a permit; and that the work will be in accordance with t s=approved plan. APPLICANT'S SIGNATURE: s ' DATE: �,a. / /7!7 NOTE! Parade of Homes events require separate permit approval by Police Department and City Council 60 days prior to the event. Non permitted events will not be allowed. 9 Sec.13.04 RIGHTS OF SUBJECTS OF DATA Subd. 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section. Subd.2. Information required to be given individual. An individual asked to supply private or confidential data concerning himself shall be informed of: (a)the purpose and intended use of the requested data within the collecting'state agency,political subdivision,or statewide system; (b)whether he may refuse or is legally required to supply the requested data;(c)any known consequence arising from his supplying or refusing to supply private or confidential data;and(d)the identity of other persons or entities authorized by state or federal law to receive the data. This requirement shall not apply when an individual is asked to supply investigative data, pursuant to section 13.82, subdivision 5,to a law enforcement officer. The commissioner of revenue may place the notice required under this subdivision in the individual income tax or property tax refund instructions instead of on those forms. Subd.3. Access to data by individual. Upon request to a responsible authority,an individual shall be informed whether he is the subject of stored data on individuals,and whether it is classified as public,private or confidential. Upon his further request,an individual who is the subject of stored private or public data on individuals shall be shown the data without any charge to him and, if he desires, shall be informed of the content and meaning of that data. After an individual has been shown the private data and informed of its meaning,the data need not be disclosed to him for six months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been collected or created. The responsible authority shall provide copies of the private or public data upon request by the individual subject of the data. The responsible authority may require the requesting person to pay the actual costs of making,certifying, and compiling the copies. The responsible authority shall comply immediately, if possible, with any request made pursuant to this subdivision,or within five days of the date of the request,excluding Saturdays,Sundays and legal holidays,if immediate compliance is not possible. If he cannot comply with the request within that time,he shall so inform the individual,and may have an additional five days within which to comply with the request,excluding Saturdays, Sundays and legal holidays. Subd.4. Procedure when data is not accurate or complete. An individual may contest the accuracy or completeness of public or private data concerning himself. To exercise this right,an individual shall notify in writing the responsible authority describing the nature of the disagreement. The responsible authority shall within 30 days either: (a)correct the data found to be inaccurate or incomplete and attempt to notify past recipients of inaccurate or incomplete data, including recipients named by the individual;or(b)notify the individual that he believes the data to be correct. Data in dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data. The determination of the responsible authority may be appealed pursuant to the provisions of the administrative procedure act relating to contested cases. DATA PRIVACY ADVISORY In accordance with M.S. 13.04, Subd.2, "Rights of subjects of data", we would like to inform you that your request for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or confidential information. You are notified that: 1. The information you furnish will be used to determine your qualification for the permit or license requested. 2. You may refuse to supply data, but refusal may require that the City deny the permit or license. 3. The information may be shared with other local, state or federal agencies to the extent necessary to process the permit or license. 4. If your requested permit or license requires Council action to approve, some information may become public. 5. You have certain rights under M.S. 13.04 (available upon request) to review private data on yourself. 6. Your full name is required to process this application or permit. Zer) Z) It/ (0/ / First Middle Last / ,l> g C'-Cx5/4/ tA1/6.7.' Address ,/ /- Acr.dfs;of <--5—? 3 / 2yC3 City State Zip Phone 72 6? L2 Cv � I understand my rights as stated above. -':nature CHECK OFF LIST FOR ISSUANCE OF PERMITS FOR OFFICE USE ONLY ADDRESS OR LEGAL: 55 Wc-g2 PID: DESCRIPTION OF WORK: N e S ZONING REVIEW BY: O. (I DATE APPROVED: G 2 ti-q 7 BUILDING REVIEW BY: mi1 _ DATE APPROVED: 6, -LY- FEES TO BE CHARGED: Misc. Fees Calculated By: PERMIT Yes j No PLAN REVIEW Yes r/ No SEWER CONNECTION STATE SURCHARGE Yes c./ No WATER CONNECTION INVESTIGATION FEE Yes No — PARK FEE SAC Yrs No SITEINSPECTION Number of SAC Units OTHER (specify) ZONING CHECK LIST Zoning District: (1(Z-16 Fire Department: ( vvi (..4ICC Post Office: (on 5C.A-f e School District: ©f2-bAJO Lot Area: Sq.ft. t 9 0, O`1) Acres `I. 3 b Width 4167 3 2 Depth '-f I •51 Survey Submitted: Yes X. No Date of Survey: (y -1(0 -g 7 Proposed Setbacks: Front (Lake): 320 S Right Side: $ 6-27 N Roar(Street): .23 Left Side: l '1 2_ W Adjacent Structures: N I Pr Wetland: 1001 -- Building Height: Def. Hgt. I S' Peak Hgt. %'- Lot Coverage: N (A Grading: Staff Approval Date: ( - 7-(1 -1 1 By: , 0 Council Approval Date: /s i Septic: Staff Approval Date: (.( 2`f- By: S L.-) Zoning File: # N (A Resolution: # — Resolution Date: —Shoreland District: No Avg. Setback: Bluff Setback: Lot Coverage: Existing Proposed Hardcover: 0-75' 75-250' 250-500' 500-1000' Hardcover Variance Required: Yes No Date of Council Approval: REMARKS(in house): 26 BUILDING REVIEW CHECK LIST UBC: f2`3 _CONSTRUCTION TYPE: 'Vt Sq Footage $ Per Sq Ftg Basement /7 ?Z x $3.V{ = 22,C31 •lfl 6 1st Floor 1-7 3 Z x (0°!•31 = 12 010`-14-i2- 2nd Floor WI& x = 19 092.06 Garage —10$ x I 0.31 = x = TOTAL Estimated Construction Value: $ 5-7 000% Inspections Required: Work Requiring Separate Permits: Site p( Plumbing Fire Hardcover Removal of Mechanical Water Connection ( Footing D( Septic Sewer Connection or Framing x Fireplace pc Lawn Irrigation Oc Insulation (Masonry) Other Gc Wall Board (Mfg.) oC Well (State Permit) pc Final Grading/Filling Electrical (State Permit) Other REMARKS (IN HOUSE): REVIEW BY OTHERS: DATE: Access: Existing New Access Approval: Date By: REMARKS(TO BE NOTED ON PERMIT): 27 • COMM. NO. DFP Planning & Design, Inc. 4797 HWY 10 NE Arden Hills, MN 55112 612-636-6889 Minnesota State Energy Code Calculations Based on Chapter 5 of the Model Energy Code 1992 Edition -- Adopted 1/1/95 Owner: AUTEY RESIDENCE COMM. NO: 970186 Site Address : Contractor: COLSON CONSTRUCTION Phone: Bldg. Class : Al Al for Single Family/Duplex A2, residential < 3 stories Over 3 stories Other GENERAL INFORMATION Note: The section designations ("Section A" , "Section B" etc. ) are for convenience in calculations only, and are not related from one set of calculations below to the next . 1 . Bldg. Walls Perimeter x Wall heights, = Area ground to eave Section A : 108 11 .04 = 1192 .32 Section B : 36 15 . 62 = 562 .32 Section C : 36 19 .87 = 715 .32 Section D : 0 0 = 0 Gross Wall Area = 2469 .96 2 . Building dimensions Floor or Ceiling Length x Width Area Section A 56 30 = 1680 Section B : 13 4 = 52 Section C : 0 0 = 0 Section D : 0 0 = 0 Total floor or ceiling area = 1732 3 . Rim Joist Perimeter = 180 Floor joist 2 by (8" , 10" , 12" or 16") ) : 18 Rim Joist Area = 270 4 . Doors Area: 49 .8 Thickness (inches) : 0 Perimeter (feet) : 0 Type of construction: 5 . Total door' s perimeter: 0 6 . Windows Manufacturer: SCHERER U factor: 0 .32 State approved: YES Type Height x Length x Number = Total (inches) (Inches) of glass SqFt units CASEMENTS 36 20 1 5 CASEMENTS 60 20 7 58 .33 CASEMENTS 60 24 2 20 CASEMENTS 60 26 2 21.67 CASEMENTS 36 28 6 42 FIXED 16 24 6 16 FIXED 60 42 3 52 .5 FIXED 60 54 2 45 FIXED 30 66 3 41.25 FIXED 60 66 1 27 .5 0 0 0 0 0 0 0 0 0 0 0 0 7 . Window glass area (SqFt) = 329 .25 Type Height x Length x Number = Total (feet) (feet) units SqFt 8 . Patio Door: 6 .85 2 .5 4 68 .5 9 . Atrium: 0 0 0 0 10 . Fireplace area Width: 0 Height: 0 Total Sq Ft = 0 11 . Exposed Foundation Height area A: 0 .67 Perimeter area A: 180 Sq Ft area A = 120 .6 Exposed Foundation Height area B: 0 Perimeter area B: 0 Sq Ft area B = 0 12 . SqFt U factor U x A Gross wall area 2469 .96 minus Window area 329 .25 0 .32 105 .36 Patio door area 68 .5 0 .47 32 .2 Atrium area 0 0 0 Rim joist area 270 0.041 11.07 Door area 49 .8 0 . 14 6 .97 Fireplace area 0 0 0 Exposed Found. 120 .6 0 .08 9 .65 * Framing area 246 .996 0 .095 23 .46 equals Totals for net wall : 1384 .814 0 .043 59 .55 Totals for gross wall area: 248 .26 * Framing area is 10% of gross wall area 13 . Gross wall area x factor below = U x A per code Factor is .11 for A-1 single family & duplex .23 for A-2 and other residential .23 for other buildings .28 for over 3 stories Factor is: 0 .11 BTUH = 271 . 6956 MUST BE > OR = 248 .26 (calculated above) 14 . Gross ceiling area = 1732 15 . Ceiling framing area (10% of ceiling area) = 173 .2 16 . Joist Area (10% of ceiling area) = 173 .2 17 . Net ceiling area (Gross ceil . area - Joist area) = 1558 .8 18 . U ceiling: 0 .021 x Net ceil . area = 32 .7348 19 . U framing: 0 .024 x Joist area = 4 .1568 20 . Total of item 18 x item 19 = 36 .8916 21. Gross ceiling area x factor below = U x A per code Factor is .026 for A-1 single family & duplex .033 for A-2 and other residential .06 for other buildings Factor is: 0 .026 BTUH = 45 .032 MUST BE > OR = 36 .8916 (calculated above) , U VALUE CALCULATIONS , %, 2 X 6 / BUILTRITE . R VALUE U VALUE i Inside air film .68 WALL r ji, • Interior wall .45 (Wall) U = 1 = SECTION :404/ Insulation 19.00 R AI Sheathing 2.06 .043 :� Siding .67 Nil Outside air film .17 • ._.....:-.1) -1 , —1) r ' It TOTAL 23.03 . . Y , • it — Inside air film .68 ` 1 .45 STUD s 1� Interior ;wall SG('rION II Stud - 66.50 (Framing) U = 1 = '' R ;� Sheathing 2.06 11 • Siding ..67 .095 1i Outside air film .17 R TOTAL 10.53 Interior air film .68 • III Insulation 19.00 RIM JOIST Z 111 1 k inch soft wood 1.88 (Rim Joist) U = 1 = � I l i' Sheathing . . 2.06 RI Exterior wall covering .67 .041 Exterior air film .17 ' 1 R TOTAL 24.46 • r" ' Interior air film .68 l '►' Insulation 10.00 Foundation (12 " Block) 1.28 (Foundation) U = 1 = • R :•• Exterior air film .17 t .R TOTAL (x.13 •_ 1\1.--i. • CEILING WITH VENTED ATTIC SPACE ABOVE R VALUE R VALUE SING CEILING • 0.61 Air Film 0.61 • 36.00 Insulation 44.00 111 4.38 Joist 11109110 �•, .56 Ceiling .56 0.61 . Air Film 0.61 - 41.55 Total R 45.78 .024 U = R _021 • CATHEDRAL CEILING R VALUE R VALUE FRAMING CEILING imi un II P , / . 0.61 Inside air film 0.61 .56 Ceiling .56 14.375 Joist(Spacer) ■ �-- - � - Insulation 33.85 -- t- --- - Air Space .50 .67 Roof decking .67 .06 Felt .06 .44 Shingle .44 0.17 Outside air film 0.17 16.88 Total R 36.86 .059 R = U .027 Window infiltration .5 cfm/lineal foot of crack Residential door infiltration 0.5 cfm/square foot or door and minimum code requirement Non-residential door infiltration 11.0 cfm/lineal foot of crack Ub 12" concrete block no insulation = .781 R 1.28 double glass = .52 triple glass = .31 All exterior walls and ceilings must have a vapor barrier (0.10) perm max.). Vapor barrier must be on the inside (heated side) of wall. Vapor bariers of the polyethelene thin film have no R value. DATE TIME CITY OF ORONO CALLED IN 3/- /?"-7 INSPECTION NOTICE 'I/,� SCHEDULED r,7:l /9'] / 6) PERMIT NO. COMPLETED f I ADDRESS =� �_ • �' OWNER &z,-( CONTR. TELEPHONE NO. `7,L/- - DESCRIPTION tt 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FIWNG ct 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS <-1V1 INc1 iUW 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Q • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION = 05 FINAL 14 SEWER HOOK-UP 08 PROGRESS 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT Q 07 DEMO—FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP • 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL -1 10 PLUMBING FINAL 28 CEDAR SHINGLES 36 FOUNDATION REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO o COMMENTS: cc W cc 0 0 Il W W W Ir WORK SATISFACTORY:PROCEED PROJECT COMPLETE C C ORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY W D ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C3 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 OwnerlContrac \ o sit Inspector. 0- White Copy/Inspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE, v SCHEDULED O 1 4411. PERMIT NO. NOTICE(-,/ ADDRESS L.2 ,C�!'l'/l �L�--�� OWNER �0 /�'�Fl/7 f CONTR. -C.0-6`2 -v- TELEPHONE NO. 7 C DESCRIPTION 01 FOOTING / 11 RI MECHANICAL �W � � y_� 18IXCAV/GRADING/FIWNG `2 FRAMING 13 MECHAN L FINAL 19 LAKESHORE/WETLANDS • 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION = 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT Q 07 DEMO—FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP • 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 28 CEDAR SHINGLES 36 FOUNDATION REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO o COMMENTS: cc a O cc 0 W cC W W cC �dRK SATISFACTORY:PROCEED � PROJECT COMPLETE CORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY O 11 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT ❑ CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN INSPECTOR WILL RETURN C]STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED G INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contractor o�n . Inspector. White Copy/Inspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN `P 9 INSPECTION NOTICE SCHEDULED PERMIT NO. 9/ 62 COMPLETED ADDRESS 67-5-- �e-ct�� OWN ERC® ( y 42tdiz- CONTR. TELEPHONE NO. 2 d,c- 616, 3 7 DESCRIPTION tit 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 02 FRA I 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Z 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT J W 07 DEMO—FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 28 CEDAR SHINGLES 36 FOUNDATION REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES NO o COMMENTS: cc cc OK-423s FOCikir- a6 cc cc cc • ORK SATISFACTORY:PROCEED PROJECT COMPLETE [ CORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY W • Ci CORRECT WORK,CALL FOR REINSPECTION TEMPORARY 0 BEFORE COVERING PERMANENT LI CORRECT UNSAFE CONDITION WITHIN HOURS. r- PHOTO TAKEN INSPECTOR WILL RETURN O STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED G INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473'7357 Owner/Contractor o t . Inspector. White Copy/Inspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NO IC SCHEDULED 10'11- 5 ) I 1--3o PERMIT NO. it1- 46 COMPLETED 1 d` 1'7-51 `!•.';15 ADDRESS �� W E R l:J14N c-7- OWN ER OWNER CONTR. GLSoi'l TELEPHONE NO. 41'7 LI —03 8 DESCRIPTION IL 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FIWNG ct 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION _ &PFINAL 14 SEWER HOOK-UP 06 PROGRESS F' 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT v `cL 07 DEMO—FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v LUMBING FINAL 28 CEDAR SHINGLES 36 FOUNDATION REMOVAL OWNER/CONTRACT TO MEET YOU:_YES_NO C3 COMMENTS: cc a cc 0 • O. css.._,—e C.—cD 0 us W cc Q W Z W cc O RTRK SATISFACTORY:PROCEED JECT COMPLETE 0; L CORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY W O CI CORRECT WORK,CALL FOR REINSPECTION TEMPORARY 0 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN INSPECTOR WILL RETURN O STOP ORDER POSTED.CALL INSPECTOR -- CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 OwnerlContractoisit Inspector. C White Copylinspector's File Canary Copy/Site Notice