HomeMy WebLinkAbout2009 - CO City of Orono
CERTIFICATE OF OCCUPANCY
This Certificate is issued pursuant to the requirements of Section 110 of the
International Building Code certifying that at the time of issuance this structure
was in compliance with the various ordinances of the local jurisdiction
regulating building construction or use. For the following:
Building Address: 70 WEAR LA S
PIN: 04-117-23-21-0019
Legal Description: Rolling Meadows 4th Addition
Block 001 Lot 002
Zoning District:
Permit No: 2009-00351
Work Activity: Single Family
Construction Type: VN
Occupancy:
Occupant Load:
Fire Sprinkler: N
Applicant: Gordon James Construction
Applicant Address: 5159 Main Street E
City,State,Zip: Maple Plain, MN 55359-
Owner Name: Jason &Joni Pfeiffer
Owner Address:
City, State,Zip: Crystal Bay, MN 55323-
FOR YOUR INFORMATION
For any police,fire or medical emergency-Call:911 Posting of your assigned street number is required
In purchasing a new home, file for your homestead at the City offices.Register your address for voting,drivers
license and automobile registration. City water and sewer is billed quarterly.Septic inspection fees are billed
annually.Permits are required for any additions or alterations on your property or for construction of any garages,
deck, dock or other accessory structure.
Special regulations prohibit any excavation,filling,grading,dredging, tree removal,or construction of any kind
within 75 feet of any lakeshore or within 26 feet of any wetlands.
4
Zoning Administr. •r Date
/ I 17 09
Building 1`i icial Date
v , 2335 Highway 36 W
St.Paul,MN 55113
Tel 651-636-4600
Fax 651-636-1311
www.bonestroo.com
December 3, 2009 Bonestroo
Ms. Melanie Curtis
Planning and Zoning Coordinator
City of Orono
Post Office Box 66
Crystal Bay, MN 55323
Re: 70 Wear Lane
File No. 000139-09000-2
Building Permit No. 2009-0351
Dear Melanie:
We have reviewed the as-built plan for 70 Wear Lane dated 11-30-09. The plan shows
grading related to the construction of a single family home with an attached garage.
We have the following comments with regards to engineering matters:
• The as-built drawing shows that the lowest opening of the home was
constructed approximately 0.3 feet lower than planned. This decreases the
planned freeboard from 1.7 feet to 1.4 feet. The emergency overflow elevation
at Somerset Lane is 986.8.
• The as-built grading plan shows that the design contours and drainage patterns
were successfully constructed.
If you have any questions, please call me at (651) 604-4894.
Yours very truly,
Darren Amundsen
Cc: Tom Kellogg