Loading...
HomeMy WebLinkAbout1998 - 009992 - new residence PERMIT CITY OF ORONO PERMIT TYPE: 2750 Kelley Parkway- P.O. Box 66 B 1 I LL')I Ni, Crystal Bay, Minnesota 55323 Permit Number: 00°3°3'32 (612) 473-7357 Date Issued: 03/09/98 SITE ADDRESS: 2900 WEAR C I R MJ P. I . N. . 33-118-23-34-0007 DESCRIPTION: NEW RESIDENCE Building Perini t. Type SGL FAMILY-NEW Building Wort:: Type RESIDENCE SGC Occupancy Rn-:_ Con truc t.1 on Type ype` VN Zoning RR-18 Census Code 101 1 - FAM. DETACH :H REMARKS: SEPARATE PERMITS REQUIRED FOR PLUMBING, MECHANICAL, SEPTIC, F I Rr PLACE(i tl•=G) , LAWN IRI GA 1 ION, WELL (ST(SATE) , ELECTRICAL (STATE) . FEE SUMMARY: VALUAT ION $'2S0,000 Rase Fee $1 ,637 . 25 Plan Review $1 , 064 . 21 Surcharge 1125-0Q Total Fee $2, 826 . 46 CONTRACTOR: - Applicant - ST L lc .OWNER: A & T OEVELC'F`t1Ni 1475 .51= 8556 POST __ DWIGHT 19435 tit;I f I ELD f f 575 SUSSEX C C R _;Hti :`:,oic:ii tui 5E:31 ORONO MN 55356 ( ;1 47S-9615 47,5-9616 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGRE L, TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORD 4,N S 0 STATE OF MINNESOTA BUILDING CODE REQUIREMENTS . J APPLICANT'PERMITEE SIGNATURE ISSUED BY:SIGNATURE -�'���� • Total Fee: $ 4-/$o Date Received: Entered By: may. Permit#: 1- CITY OF ORONO - BUILDING PERMIT APPLICATION All information must be submitted in full before plan review will be started. (please print all information) THE APPLICANT IS: (circle one) OWNER O�TRACTOR� JOB SITE ADDRESS: - -- ZIP: S.S 5 S- a o o NAME OF OWNER: p` ' \ `Je"��'o } " PHONE: (home) `I q,'S (work) MAILING ADDRESS: -57 5 '-•- CITY: ON, ZIP: CS 3 C6 CONTRACTOR: PHONE: CONTACT PERSON: w �, �'-�, t- MOBILE/PAGER: .3 k't 1 MAILING ADDRESS: CITY: ZIP: STATE LICENSE: # ss s-s c. ARCHITECT/ENGINEER: PHONE: MAILING ADDRESS: CITY: ZIP: NAME: REGISTRATION# TYPE OF WORK: New Addition Accessory Structure Move Remodel/Alteration Land Alteration PROPOSED WORK(describe in detail): /Vt-/ STORIES: a Q. FEET OF EACH FLOOR: /Cc) NO. OF BEDROOMS: GARAGE STALLS: ATT. ESTIMATED CONSTRUCTION VALUATION (excluding land): $ ° I hereby apply for a building permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of the City and with the State Building Code; that I understand this is not a permit and work is not to start without a permit; and that the work will be in acc• •• . w.41 the approved plan. APPLICANT'S SIGNATURE: DATE: -2/4 /9 s-- NOTE! -NOTE! Parade of Homes events require separate permit approval by Police Department and City Council 60 days prior to the event. Non permitted events will not be allowed. 9 Sec.13.04 RIGHTS OF SUBJECTS OF DATA Subd. 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section. Subd.2. Information required to be given individual. An individual asked to supply private or confidential data concerning himself shall be informed of: (a)the purpose and intended use of the requested data within the collecting'state agency,political subdivision,or statewide system; (b)whether he may refuse or is legally required to supply the requested data;(c)any known consequence arising from his supplying or refusing to supply private or confidential data;and(d)the identity of other persons or entities authorized by state or federal law to receive the data. This requirement shall not apply when an individual is asked to supply investigative data,pursuant to section 13.82, subdivision 5, to a law enforcement officer. The commissioner of revenue may place the notice required under this subdivision in the individual income tax or property tax refund instructions instead of on those forms. Subd. 3. Access to data by individual. Upon request to a responsible authority,an individual shall be informed whether he is the subject of stored data on individuals,and whether it is classified as public,private or confidential. Upon his further request,an individual who is the subject of stored private or public data on individuals shall be shown the data without any charge to him and, if he desires, shall be informed of the content and meaning of that data. After an individual has been shown the private data and informed of its meaning,the data need not be disclosed to him for six months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been collected or created. The responsible authority shall provide copies of the private or public data upon request by the individual subject of the data. The responsible authority may require the requesting person to pay the actual costs of making, certifying, and compiling the copies. The responsible authority shall comply immediately,if possible, with any request made pursuant to this subdivision,or within five days of the date of the request,excluding Saturdays,Sundays and legal holidays,if immediate compliance is not possible. If he cannot comply with the request within that time,he shall so inform the individual,and may have an additional five days within which to comply with the request,excluding Saturdays, Sundays and legal holidays. Subd.4. Procedure when data is not accurate or complete. An individual may contest the accuracy or completeness of public or private data concerning himself. To exercise this right,an individual shall notify in writing the responsible authority describing the nature of the disagreement. The responsible authority shall within 30 days either: (a)correct the data found to be inaccurate or incomplete and attempt to notify past recipients of inaccurate or incomplete data, including recipients named by the individual; or(b)notify the individual that he believes the data to be correct. Data in dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data. The determination of the responsible authority may be appealed pursuant to the provisions of the administrative procedure act relating to contested cases. • DATA PRIVACY ADVISORY In accordance with M.S. 13.04, Subd.2, "Rights of subjects of data", we would like to inform you that your request for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or confidential information. You are notified that: 1. The information you furnish will be used to determine your qualification for the permit or license requested. 2. You may refuse to supply data, but refusal may require that the City deny the permit or license. 3. The information may be shared with other local, state or federal agencies to the extent necessary to process the permit or license. 4. If your requested permit or license requires Council action to approve, some information may become public. 5. You have certain rights under M.S. 13.04 (available upon request) to review private data on yourself. 6. Yourpivme is required to process this application or permit. i V /First Mi dle Last C 7 r S%,5je� c, _ Address r ) 31—CP City State Zip Phone I understan. y .i_• • as stat.i above. IT Sig..ture CHECK OFF LIST FOR ISSUANCE OF PERMITS FOR OFFICE USE ONLY ADDRESS OR LEGAL: `t•S w c.A tZ 1..46444-6 44. 44,1454 -- PID: "PID: z-ct , - DESCRIPTION OF WORK: /jEbs (2es ZONING REVIEW BY: 41.se, DATE APPROVED: 3.3-4 f3 BUILDING REVIEW BY: DATE APPROVED: 3- 3 FEES TO BE CHARGED: Misc. Fees Calculated By: PERMIT Yes ✓ No PLAN REVIEW Yes v- No SEWER CONNECTION STATE SURCHARGE Yes i, No WATER CONNECTION INVESTIGATION FEE Yes No v- PARK FEE SAC Ycs No ' SITEINSPECTION Number of SAC Units OTHER (specify) ZONING CHECK LIST Zoning District: QR•/6 Fire Department: (,onri(M Post Office: Co-`J j lAtce School District: ( OR t-3 Lot Area: Sq.ft. 81,12- •V.',V.', Acres 2-o o Width Z S •I9 Depth 3.(0.13 Survey Submitted: Yes pC No Date of Survey: 12 •2.`(-9 7 Proposed Setbacks: Front (L-ake): _ 14 Right Side: G:11; �► Rear (Strcct): 1 1 0 Left Side: 1 6./.13 Adjacent Structures: NIR Wetland: A) / Building Height: Def. Hgt. 2-1' Peak Hgt. 3Z' Lot Coverage: /if(/4 Grading: Staff Approval Date: 3-3- ct t3 By: , � Council Approval Date: Septic: Staff Approval Date: 3-3-9"g By: '' Zoning File: # Resolution: # Resolution Date: Shoreland District: Avg. Setback: Bluff Setback: Lot Coverage: Existing Proposed PI' Hardcover: 0-75' 75-250' 250-500' 500-1000' Hardcover Variance Required: Yes No Date of Council Approval: REMARKS(in house): 26 BUILDING REVIEW CHECK LIST UBC: IZ -3 CONSTRUCTION TYPE: \//J Sq Footage $ Per Sq Ftg Basement x = 1st Floor x = 2nd Floor x = Garage x = x = TOTAL Estimated Construction Value: $ z So,000 Inspections Required: Work Requiring Separate Permits: Site . o. Plumbing Fire Hardcover Removal dC Mechanical Water Connection X Footing a Septic Sewer Connection D( Framing cc Fireplace oC Lawn Irrigation Insulation (Masonry) Other k Wall Board pe— (Mfg.) oc, Well (State Permit) 0. Final Grading/Filling pc Electrical (State Permit) Other REMARKS (IN HOUSE): REVIEW BY OTHERS: DATE: Access: Existing New Access Approval: Date By: REMARKS(TO BE NOTED ON PERMIT): 27 ENERGY CALCULATION OWNER: Pi\�• �r5• V-/(r. L5 SITE ADDRESS: • CONTRACTOR: DATE: PHONE: DETERMINE WORKING SQUARE FOOTAGE OF EACH: 1. TOTAL EXPOSED WALL AREA g-1511 .7.. sq. f t. x "U" -1 \ = 2. TOTAL ROOF/CEILING AREA '\• k sq. ft. x "U" ‘ O Zjlo = 3. TOTAL EXPOSED WALL AREA CALCULATIONS: Total exposed wall i1d-"\. 4O sq. ft. area above floor a) Total wall window area: \.)c\\=,\ . glazed 715. 1 \ sq. ft. x ..U.. -61(0 _ \�2_�lZ glazed sq. ft. x "U" _ b) Total door area clLP -15 sq. f t. x "U" 7-4- = Z3.O j • c) Total atrium/sliding door area: c%C \ • glazed ^ 40_07— sq. ft. x "U" = \ B .4-\ A10\ . glazed 5('D 41f0. 07— sq. ft. x ..U.. - 4v41 = 11 -(0\ d) Total fireplace wall area cq. ft. x "U" _ e) Total wall framing area (average 10%) —S\`'‘ •13 sq. f t. x "U" O'1 = f) Total net wall area above floor (insulated) 7.-5611 sq. ft. x. "U" ,04- = 1 \'S • \O g) Total rim joist area 404\--..10 sq. ft. x "U" = 0-1`:\ Total foundation area (exposed) 10 sq. ft. h) Total foundation window area sq. ft. x "U" _ i) Total net foundation area " above grade ` i'S,\O sq. ft. x "U" ,Ob = 1\ b TOTAL a) thru i) = 44D5 V 10 If item #3 is the same as, or less than item U1, you have met the intent of S.B.C. Section 6006 (c) 2. '4.,.7.7rAL EXPOSED ROOF/CEILING CALCULATIONS: , : Total exposed roof/ceiling area \lo -\ 7--r sq. ft. j) Total skylight area sq. ft. x "U" _ k) Total roof/ceiling framing area (average 10%) \ko-L. \Z- sq. ft. x "U" ,C)4' _ . `\"� 1) Total net insulated roof/ceiling area \Ar5°1. \Z sq. f t. x "U" DZ— = Z\ • \ b TOTAL j) thru 1) = Z"l ,L2(o If total of #4 is the same as, or less than #2, you have met the intent of S.B.C. Section 6606 (c) 1 . ALTERNATE BUILDING ENVELOPE DESIGN To utilize the total enevelope system method, the values established by the sum of items #3 and #4 shall not be greater than the sum of items #1 and #2. 1 . + 2. _ 3. + 4. _ • CERTIFICATION I hereby certify that I have calculated the "U" factors and "R" values herein and that the building here described meets or exceeds the Stant of Minnesota Energy Conservation Act. a4tC (Signature) 1 (Date) • CONSTRUCTION R VALUE 4 ® WALL FRAMING SECTION: ( 1 INTERIOR AIR FILM . 0 . 68 E '` (2 1/2" GYPSUM BOARD 0 . 45 (3 5 1/2 INCHES SOFT WOOD 6 . 87 ,,./ ; ® (4 25/32" FIBERBOARD SHEATHING 2 . 06 6. ( 5 SIDING 0 . 81 - sem a ( 6 EXTERIOR AIR FILM 0 . 17 � iTOTAL R = 11 . 04 -' - 1 ',--,<..c : ��im U = 1/R = . 09 STUCCO SIDING BRICK WALL SECTION ( INSULATED) : ( 1 INTERIOR AIR FILM 0 . 68 . ( 2 1/2" GYPSUM BOARD 0 .45 ( 3 FIBERGLASS INSULATION 19 . 00 H� , . -c?"e ,(' . (4 25/32" FIBERBOARD SHEATHING 2 . 06 S _ ..j; i (5 SIDING 0 . 81 ( 6 EXTERIOR AIR FILM 0 . 17 TOTAL R = 23 . 17 i z-' 6 U = 1/R = . 04 • RIM JOIST SECTION: =-."I ( 1 INTERIOR AIR FILM 0 . 68 - ;'•. 2. ( 2 6" FIBERGLASS . INSULATION 19 . 00 ( 3 1 1/2 INCHES SOFT WOOD 1 . 89 (4 25/32" FIBERBOARD SHEATHING 2 . 06 (5 SIDING 0 . 81 ( 6 EXTERIOR AIR FILM 0 . 17 1I TOTAL R = 24 . 61 U = 1/R = . 04 '; FOUNDATION SECTION: (1 INTERIOR AIR FILM 0 . 68 i (2 12" CONCRETE BLOCK 1 . 28 :, , ` (3 RIGID INSULATION TO FROST 10 . 00 ---,, (4 EXTERIOR AIR FILM 0 . 17 ,,-, , ( 5 1 -- ( 6 ni TOTAL R = 12 . 13 • p. U = 1/R = . 08 S I ; i ,, s; 111'10 ;. 111 °I. ifr ;. .;Lii..6 f.- - I , CONSTRUCTION R VALUE CEILING SECTION ( INSULATED) 1 INTERIOR AIR FILM 0 . 61 2 5/8" GYPSUM BOARD 0 . 56 3 12" BLOWN INSULATION 44 . 00 4 EXTERIOR AIR FILM (STILL) 0 . 61 4 TOTAL R = 45 . 78 U = 1 /R = . 02 5V10, CEILING FRAMING SECTION 1 INTERIOR AIR FILM 0 . 61 2 5/8" GYPSUM BOARD 0 . 56 ' W3 6 1/2" BLOWN INSULATION 20 . 17 4 EXTERIOR AIR FILM ( STILL) 0 . 61 5 5 1/2" SOFT WOOD 6 . 87 TOTAL R = 28 . 82 U = 1/R = . 04 7 74V • \NN ‘ . . . • 1 � 1 , \k. DJATE CITY OF ORONO CALLED IN / TIME INSPECTION NOTICE SCHEDULED _' -/7/9 3 a PERMIT NO. '79q2.- COMPLETED U1 ADDRESS cif 7 OWNER CONTR. Kid TELEPHONE NO. 'l75 -951 DESCRIPTION - L7 lV 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING .r4,-.9,7,.., `'� J 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS I LATION a�/ ''- 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD ' 12 WATER HOOK-UP 17 SITE INSPECTION Q 55 FINAL 14 SEWER HOOK-UP 06 PROGRESS • 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT • 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 14.1 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO o COMMENTS: w a CC O a O U. W CC 12 W W CC WORK SATISFACTORY:PROCEED L PROJECT COMPLETE CC L7 CORRECT WORK&PROCEED L ISSUE CERTIFICATE OF OCCUPANCY W • L CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT L CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN INSPECTOR WILL RETURN 1 L CITATION ISSUED STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next i pection 24 hours in advance.473-7357 Owner/Contr. • •n s e Inspector. White Copy/Inspector's File Canary Copy/Site Notice DAT TIME CITY OF ORONO CALLED IN „W./ /9, INSPECTION NOTICE--e16 SCHEDULED 'Y// /9f moi, PERMIT NO. / COMPLETED "t (4 ADDRESS pZ.C/d /_a-,-,1- t L Th OWNER CONTR. lt TELEPHONE NO. /7t2.3----9S/5 _ E DESCRIPTION /1 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 0 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS • 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP IL 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL • OWNER/CONTRACTOR TO MEET YOU:_YES_NO COMMENTS:_k_111 O Jeck CC (, CC W CC CC O W. WORK SATISFACTORY:PROCEED C PROJECT COMPLETE ❑CORRECT WORK&PROCEED L; ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY (iO BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN INSPECTOR WILL RETURN C CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next insi4ction 24 hours in advance.473-7357 Owner/Contracto o Inspector. White Copy/Inspector's File Canary Copy/Site Notice ATE TIME CITY OF ORONO Q Z CALLED IN /7 7 rizY INSPECTION NOTICE (,i Ci I SCHEDULED 'e/ V/d 7..3 PERMIT NO. COMPLETED ADDRESS • OWNER CONTR. TELEPHONE NO. >> - DESCRIPTION Ltt, 01 OTING _ 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING RAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 1U09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO aCOMMENTS: ll Sear-alk loctcL +0 uvvd-a \Ickc. c ik. ` oc 1&f ffu.s ses a s s� cc ?co-c-- S o a �2 "� i ce + wa -" (AK/cgit Wed 1 ale- 1 Qvci-i c Q z W cc j W• ❑WORK SATISFACTORY:PROCEED C PROJECT COMPLETE CC 'CORRECT WORK&PROCEED E ISSUE CERTIFICATE OF OCCUPANCY • ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY • BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. r- PHOTO TAKEN INSPECTOR WILL RETURN r CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contracto n te: Inspector. White Copy/Inspector's File Canary Copy/Site Notice TE CITY OF ORONO CALLED IN DA�_ ``� © TI v3lE 0 INSPECTION NOTICEG'G�l SCHEDULED 1S _T/j K CS(0 nd PERMIT NO. ( COMPLETED ADDRESS cP,?0 O W ‘2-e4-7(.--- - OWNER CONTR. A ,g7--- TELEPHONE NO. `�`1 -7S — l S-7 S DESCRIPTION W 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL =.. 12 WATER HOOK-UP 17 SITE INSPECTION 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS i` • ■ ••-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP ct IL 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO o COM ENTS: c 4 W C o t E ss>.. ._ . 4 bo Lc' _ to:(7 :§cI i 4., .. 0.: . 3 try?at 70,4, c( OAP ‘ok oCcti.( 61\irrl W W c, 0 ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE CC W CICORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY 1Z ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY c BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. P- PHOTO TAKEN INSPECTOR WILL RETURN I CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the net inspection 24 hours in advance.473-7357 Owner!Contr qt r o ite: Inspector. .r White Copylinspector's Fi e Canary Copy/Site Notice