HomeMy WebLinkAbout2011 - 00149 - demo •
CITY OF ORONO PERMIT NO.: 2011-00149
2750 KELLEY PARKWAY
ORONO, MN 55356- DATE ISSUED: 03/04/2011
(952) 249-4600 FAX: (952) 249-4616
ADDRESS : 2875 WEAR CIR
PIN : 33-118-23-34-0004
LEGAL DESC : UNPLATTED 33 118 23
: LOT 000 BLOCK 000
PERMIT TYPE : DEMOLITION
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : DEMO- PRINCIPAL STRUCTURE
ACTIVITY : 645-SINGLE FAMILY HOUSES(ATT&DET
NOTE: HOUSE ORIGINALLY LOCATED AT 2900 WATERTOWN RD.
NOTE:
1. FOUNDATIONS/ALL DEMO DEBRIS TO BE REMOVED FROM GROUND&DISPOSED OF OFF SITE,PER PCA REGULATIONS.
2. WELLS MUST BE ABANDONED.
3. INSPECTIONS DONE BEFORE BACKFILLING.
NOTE: A 24-48 HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS. CALL(952)249-4600.
SEWER MUST BE DISCONTINUED AT THE CITY SERVICE BY QUALIFIED CONTRACTOR BEFORE DEMO PERMIT IS ISSUED.
CHECK TO MAKE SURE THIS PERMIT HAS BEEN PULLED BEFORE ISSUING THIS PERMIT.
APPLICANT DEMOLITION-PRINCIPAL STRUCTURE 75.00
MILLER TRUCKING & LANDSCAPE STATE SURCHARGE DEMO 5.00
491 LABEAUH AVE NE
HANOVER,MN 55341 MISC FEE 0.00
(763)498-8342 TOTAL 80.00
OWNER
GUIMOND ET AL, SHARON R
2875 WEAR CIR
LONG LAKE,MN 55356-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
` not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
/ / f/ 1
Applicant Permitee Signature Date Issued y Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF ORONO PERMIT NO.: 2011-00149
2750 KELLEY PARKWAY
ORONO, MN 55356- DATE ISSUED: 03/04/2011
(952) 249-4600 FAX: (952) 249-4616
ADDRESS : 2875 WEAR CIR PERMIT APPLICANT:
PIN : 33-118-23-34-0004 MILLER TRUCKING&LANDSCAPE
LEGAL DESC : UNPLATTED 33 118 23 491 LABEAUH AVE NE
: LOT 000 BLOCK 000 HANOVER, MN 55341
PERMIT TYPE : DEMOLITION
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : DEMO-PRINCIPAL STRUCTURE
ACTIVITY : 645-SINGLE FAMILY HOUSES(ATT&
HOUSE ORIGINALLY LOCATED AT 2900 WATERTOWN RD.
NOTE:
1. FOUNDATIONS/ALL DEMO DEBRIS TO BE REMOVED FROM GROUND& DISPOSED OF OFF SITE, PER PCA
REGULATIONS.
2. WELLS MUST BE ABANDONED.
3. INSPECTIONS DONE BEFORE BACKFILLING.
NOTE: A 24-48 HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS. CALL(952)249-4600.
SEWER MUST BE DISCONTINUED AT THE CITY SERVICE BY QUALIFIED CONTRACTOR BEFORE DEMO PERMIT IS
BUILDING INSPECTION RECORD
48 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS.
CALL FOR INSPECTIONS WEEKDAYS:
INSPECTION TYPE DATE INSPECTOR INSPECTION TYPE DATE INSPECTOR
FINAL
INSPECTION COMMENTS:
IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL
WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT.
THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.
-70,
City of Orono Fp jt C�TY USE ONLY
P.O.Box 66 Date Received: q 1 Permit# a O{l- t�df
'
� `2750 Kelley Parkway
i '!. Ij Crystal Bay,MN 55323 Amount: S SAC Credit:
• 1,c, (952)249-4600
Homeowner(s)Signed: ❑Yes
Resolutions(if any)Signed:0 Yes 0 None Required
Zoning Disclosure Signed: 0 Yes 0 None Required
CITY OF ORONO- DEMOLITION PERMIT f�E�!�1 �®
(All permits must be approved by the Building Official and/or Zoning Department) V
0
Job Site/Owner Information: MAS 2011
ciry of ORON°
Type: ® Residential n Commercial• 6713 75 l/t),Lah 00 de
Site Address: %1 r 5� `
Owner: Mailing Address:
City: Zip:
Home Phone: Alternate Phone:
Contractor/Applicant Information:
Contractor/App.: M tx —VC VAlfICS4V1r),SCap>L Contact Person: LaYry
Address: PO go' l51 State License #:
City: Nor-over Zip: SS 341 Expiration Date:
Phone: -1103 `Ac-16-te a- Alternate Phone: 1't3 .Q c\- 30`\1
SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT
General Instructions:
1. You may be required to obtain other permits, i.e.: well abandonment, sewer, etc.
2. Work must not begin unless the permit card is available on the job site.
3. A 24-48 hour notice is required for all inspections. Call (952)249-4600.
4. Sewer must be discontinued at the City service by qualified contractor before demo permit is
issued.
Demolition by means of: ❑ Manual Disassembly F1 Heavy Equipment ❑ Other
Permit(s) Issued: ❑ Sewer Disconnection n Well Abandonment#
In return for issuance of said Demolition Permit, the undersigned owner hereby agrees as follows:
1. The structure(s) shall be kept enclosed and/or secured until such time as demolition is
complete.
2. Demolition debris will be kept off adjoining property and/or the public rights-of way unless
specific prior approval is obtained in writing for temporary use thereof.
3. Foundations shall be completely removed from the ground.
4. All demolition debris shall be completely disposed of off site in accordance with all
applicable PCA requirements.
5. Water wells must be abandoned in accordance with State Health Department regulations.
6. Inspection required when all debris has been removed,before backfilling.
7. Within 5 working days of superstructure removal, a final inspection shall be requested. The
site shall be left clean and clear of all debris,with any excavation filled with earth level with
the adjacent ground elevation(except when such excavation is to be used as part of a new
building and such new building is actually under construction).
8. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks
must be pumped, crushed and filled with native soils. An inspection is required after the
tanks are pumped and before the tanks are crushed and filled.
9. The undersigned owner shall and hereby does indemnify and hold harmless the City of
Orono, its agents, employees and assigns from and against all claims, damages, losses or
expenses, including attorney fees, against the City, its agents, employees and assigns arising
out of or resulting from the demolition described herein as performed by the property owner,
his employees, agents, subcontractors or assigns.
PERMIT TYPE AND FEE CALCULATION
$75.00-Principal Structure
n $50.00-Accessory Structure (how many) (what)
1. Subtotal of above permit requested $ n
2. State Surcharge $ 5.00
3. TOTAL PERMIT FEE (add lines 1-2 above) $ (z3:3O�
The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees
to do all the work in a strict accordance with the ordinances of the City and the regulations of
the State of Minnesota, and certifies that all statements made on this application are complete,
true and correct.
Applicant's Signature: Date: 1- 2-A -
J
Owner's Signature: - - Date:
Approved By: L11 M%, Date: 3 2-0
(Building Official)
* Zoning Disclosure Required f, YES 1:1 NO
*This must be filled out by Zoning -� ent-For either answer,a Zoning Official must sign all applications.
* Approved By: ( / .I Date: 3- y`
(Zoning Official)
A AK_ I I .1 o bey\ ctelytd,i/sk ., No nekoi
Reset Form co( cmyvic.s (' 1 rt.