Loading...
HomeMy WebLinkAbout10-03-2001 inspection = � CiTy0f ORONO Municipal Offices Street Address: Mailing Address: ` ESI; 2150 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 Owner: Mb(� CC\ �(0 u C\ Address: ),�14 s W m r C'.r L I City Ordinance 199 requires that each existing on-site sewage treatment system in Orono be inspected every two years. The on-site sewage treatment system at the above address has been inspected and appears to fall into the categories checked below. SYSTEM CONFORMITY (1-3): °CODE SYSTEM" An ISTS which meets all the location,design and construction standards ofthe current Orono Municipal Code. 2 "COMPLI:ANT SYSTEM" An ISTS which does not meet all the location,design and construction standards ofthe current Orono Municipal Code but does meet the three foot separation requirement,and which is not failing or an imminent threat to public health or safety. 3 'NON-COMPLIANT SYSTEM" A prohibited ISTS;an ISTS located within a designated 100-year flood plain,any ISTS which may or may not meet all the location,design,or construction standards of the current Orono Municipal Code and which is failing for any reason;and any ISTS with less than three feet of unsaturated soil or sand between the distribution device and the limiting Boil characteristics. TANK CONDITION(5-10): _ inspection indicates: Pumpout not needed at this time. 6 Tank must be pumped out this year (city code requires tanks to be pumped out every 3 years. Tank was last pumped 7 Solids accumulation in tanks is at a critical a critical level Tanks should be pumped out as soon as possible. 8 System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge. 9 Inspection risers missing-tanks could not be inspected. Inspection risers(4"dia.pipe)must be installed in each tank at nest pumpout If tanks have not been pumped out within the last three years,they should be pumped out now. 10 Inspection pipe is located directly over tank baffle(does not give accurate measurement of solids accumulation). If tanks have not been pumped out within the last three years,they should be pumped out now. DRAINFIELD CONDITION(11-14): 11 Drainlield is dry,no surfacing evident 12 Some evidence of surfacing,not critical yet 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector immediately.Repairs must be completed within 90 days. 14 Drainfield extent and condition unknown. COMMENTS: AorX S O KV rnp 'ru�.ICS \n eVc1- 5 o ane C) cam 0"JI aro 0� r�.oyr\r1 aro 4�T caC°+SS � o " Yh0.�C Date of Inspection Se tte p� System Inspector Not-: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be advised that this report does not guarantee or certify that an existing system will continue to function properly,but is merely an opinion of the adequacy of the system under current conditions based on the available