Construction Sequence
1. INSTALL SILT FENCE ON DOWNSTREAM SIDE OF PROPOSED INFILTRATION
BASINS.
2. REMOVE EXISTING PIPE TO UPSTREAM SIDE OF INFILTRATION BASIN.
3. EXCAVATE INFILTRATION BASINS TO MINIMUM VOLUMES.
4. LINE BASIN WITH EROSION CONTROL BLANKET AND MONITOR BASIN DURING
THE SPRING DURING SNOW MELT AND SPRING RAIN EVENTS TO ENSURE NO
EROSION IS OCCURING.
5. ONCE WEATHER ALLOWS, REMOVE EROSION CONTROL BLANKET, PLACE
BIORETENTION SOIL AND PLANT RAIN GARDEN PLANTINGS.
6. REMOVE SILT FENCE ONCE FINAL STABILIZATION HAS OCCURED.
X
_ 1
100`
VALVE CONTROLLED
DRAT tLE�TULET
W/- IP -RAP \
RECORD DRAW/NG
INFORMATION IS FURNISHED WITHOUT
WARRANTY AS TO ACCURACY. USERS
SHOULD FIELD VERIFY LOCA 77ONS AND
ELEVATIONS, FINAL GRADES CAN BE
CHANGED BY EROSION OR BY HEAVY
CONS7RUC770N TRAFFIC.
E
Vicinity Ma
Basin Parameters
West Basin
Top Basin Elevation -988.00 Minimum Area: 1,714 sf
Bottom Basin Elevation - 986.75 Minimum Area: 979 sf
Minimum Side Slopes: 4:1
Minimum Volume: 1,655cf
East Basin
Top Basin Elevation -986.00 Minimum Area: 1,287 sf
Bottom Basin Elevation - 984.75 Minimum Area: 655 sf
Minimum Side Slopes: 4:1
Minimum Volume: 1,220cf
THIS DRAWING IS TO OUR KNOWLEDGE
AN ACCURA 7E RECORD OF THE
PROJECT AS CONSTRUCTED.
ROBERT OLSON
PROJECT MANAGER
WESTWOOD PROFESSIONAL SERVICES, INC.
NOVEMBER 12, 2015
RECORD DRA WING
CONFORM/NG TO CONS TRUC T/ON RECORDS.
BY ROBERT OLSON DATE 11/12
WESTWOOD PROFESSIONAL SERVICES, INC.
RAIN GARDEN CONSTRUCTION SEQUENCING
1. Install appropriate temporary erosion control devices to prevent sediment from leaving or entering the practice during construction.
2. All down -gradient perimeter sediment control bmp's must be in place before any up gradient land disturbing activity begins.
3. Perform continuous inspections of erosion control practices, especially after each rainfall event.
4. Install all utilities prior to setting final grade of bioretention device.
5. Rough grade the site.
6. Complete, stabilize, and vegetate all other site improvements.
7. Construct and vegetate bioretention device following stabilization of contributing drainage area. Ensure that critical elevations, such as underdrain invert, top of media, top of mulch, and invert of overflow structure (if present)
are correct.
8. Remove temporary erosion control devices after the contributing drainage area is adequately vegetated.
GENERAL NOTES
1. In the event that sediment is introduced into the bmp during or immediately following excavation, this material shall be removed from the practice prior to continuing construction.
1.25' - Ponding Depth, Drainii
in Max 48 Hours
Infiltration Basin
IYV11- VV11 It.IV V�GV .J IA /y14VV
Soil Type: Lester Loam
Hydrologic Soil Group B
Infiltration Rate: 0.35 in/hr
-MixB
er
Not To Scale
Grading Legend
- -
- - --
PROPERTY LINE
-
LOT LINE
= r'-980
-980.
INDEX CONTOUR
982
INTERVAL CONTOUR
CURB AND GUTTER
POND NORMAL WATER LEVEL
n n
A
SILT FENCE
sro
STORM SEWER
9
►
FLARED END SECTION (WITH RIPRAP)
war
WATER MAIN
-SAN
►
SANITARY SEWER
837.80
x
X
X837.80
1.,50
0'
E.O.F.
58 00
Q SB -19
0
Notes
RETAINING WALL
DRAIN TILE
BREAK LINE
GRADING LIMITS
ROCK CONSTRUCTION ENTRANCE
EROSION CONTROL BLANKET
TURF REINFORCEMENT MAT
SPOT ELEVATION
FLOW DIRECTION
TOP AND BOTTOM OF RETAINING WALL
EMERGENCY OVERFLOW
SOIL BORING LOCATION
INLET PROTECTION
1. LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS
SHOWN ON THIS PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY
SITE CONDITIONS AND UTILITY LOCATIONS PRIOR TO
EXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY
IF ANY DISCREPANCIES ARE FOUND.
2. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF
"STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION AND
BACKFILL/SURFACE RESTORATION" AS PREPARED BY THE CITY ENGINEERS
ASSOCIATION OF MINNESOTA.
3. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL
AND SOD OR SEED. THESE AREAS SHALL BE WATERED UNTIL A HEALTHY
STAND OF GRASS IS OBTAINED. SEE LANDSCAPE PLAN FOR PLANTING AND
TURF ESTABLISHMENT.
4. ALL SLOPES SHALL BE GRADED TO 4:1 OR FLATTER, UNLESS OTHERWISE
INDICATED ON THIS SHEET.
5. CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING
AND PROVIDE A SMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEEN
POINTS WHERE ELEVATIONS ARE SHOWN OR BETWEEN SUCH POINTS AND
EXISTING GRADES.
6. SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS &
GUTTER FLOW LINE UNLESS OTHERWISE NOTED, PROPOSED CONTOURS ARE
TO FINISHED SURFACE GRADE.
7. CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTS
AFTER THE SITE GRADING AND UTILITY CONSTRUCTION IS COMPLETED. THE
CONTRACTOR SHALL DISPOSE OF ALL EXCESS SOIL MATERIAL IN A MANNER
ACCEPTABLE TO THE OWNER AND THE REGULATING AGENCIES.
8. ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULES
INCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
(NPDES) PERMIT REQUIREMENTS.
9. ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN
INDEPENDENT GEOTECHNICAL ENGINEER. EXCAVATION FOR THE PURPOSE OF
REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS
REQUIRED BY THE GEOTECHNICAL. ENGINEER, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND
INSPECTIONS WITH THE GEOTECHNICAL ENGINEER.
1!!%�� -I
0' 50' 100' 150'
CITY OF ORONO
SITE PLAN GRADING PLAN
❑ APPROVED AS - 2xii - I
❑ APPROVED WITH REVISIONS
❑ DIM��-
BY_
DATE 1 3 401(16,
L=7, -j;", is • •
Westwood Professional Services, Inc.
3701 12th Street North, Suite 206
St. Cloud, MN 56303
PHONE 320-253-9495
FAX 320-253-8737
TOLLFREE 1-800-270-9495
www.westwoodps.com
De*mjod: RJO
Checked: RJO
RJO
Drawn
Record Drawing by/date:
Revisions:
RECORD DRAWINGS
I hereby certify that this plan was prepared by me or under my
direct supervision and that I am a duly licensed PROFESSIONAL
ENGINEER under the laws o'ff the State of Minnesota.
Robert J. Olson
Data 11/12/2015 Ucem No. 45023
Prepared for:
Wayzata
Country Club
200 Wayzata Boulevard West
Wayzata, Minnesota 55391
Rain Garden
Construction
Orono, Minnesota
Grading and Erosion
Control Plan
22W Wa�2q�' e)14W20 14-- 0 1-2.11A t, I -
Date: 11/11/2014
Sheet: 1 OF 1
0004273.00GDF02.dwg