HomeMy WebLinkAbout1992 - Engineering Invoice • -rt A:at a4LO.
Otto G.Bonestroo.P.E. Howard A.Sanford.P.E. Thomas R.Anderson,A.I.A. Kenneth P Anderson,P.E. Karen L.Wiemeni.P.E.
Rosene.PE* Keith A.Gordon.PE
Donald C.
y D.Kristofitz.
Bonestroo Robert W.
Joseph C.Ande Idk PE. Robert R.Pferferle.FE. Thomas E.Angus.PEE Mark A.Seip P.E. F.Todd Foster,PE. E
rvin
Richard W.Foster.PE.
Ismael
artinez.FE.
Rosene Ricahard E.Turner.PEE David 0.Loslota PE. M INP.Rau.FE Gary Daniel. R.Marren,PE. Keith P.E.
Edgerton.P.C.PEShawnustafson.P.E.
II
Anderlik & Glenn R.CookPE. Robert C.Russek.A.I.A. Agnes M.Ring.A.LC.P Daryl K.Kirschenman.P.E. Cecilio Olivier,P.E.
VI
Thomas E.Noyes PE. Jerry A.Bourdon.PE. Thomas W.Peterson.PE. Philip J.Caswell.PE. Charles A.Erickson
Robert G.Schunicht.PE. Mark A.Hanson,P.E. Michael C.Lynch,P.E. Mark D.Wallis,PE. Leo M.Pawelsky
Associates Susan M.Eberlin.CPA. Michael T Rautmann,PE. James R.Maland.PE Miles B.Jensen.PE. Harlan M.Olson
*Senior Consultant Ted K Field.P.E. Jerry D.Pertzsch,P.E. L.Philip Gravel III,PE. James F.Engelhardt
Engineers & Architects
October 1992
City of Orono 5 S / ,, j ��Q�
P.O. Box 66
v v G'��� NSf-��
Crystal Bay, Minnesota 55323
Re: File No. 139.00
General
Invoice Na A2212()
For Engineering Services Rendered September 1, 1992 through September 30, 1992
Attend Council Meeting on Sept. 4, and Sept. 30, 1992 $ 100.00
Review sanitary sewer basemaps with Mike
faffron on ,epi 4, 1992 Sr.Princi.al S ,
3.75
Attend meeting on Sept. 11, 1992 with Ron 4
Moorse, Jeanne Mabusth, John Gerhardson
Ac.:-
and Developer of TH 12 property Charles
James Sr.Principal 2.0 Hrs. @ $77.75 155.50
Review, inspection and prepare letter re:
Paul Boyke lot division Plat #1762 Proj .Engr. 3.5 Hrs. @ $52.00 182.00
Review, inspection and prepare letter re:
Woodhill Country Club Plat #1763 Sr.Principal 1.0 Hrs. @ $77.75 77.75
Proj .Engr. 3.5 Hrs. @ $52.00 182.00
Review, inspection and prepare letter re:
Austin Evans Bayside lot division Plat #1764 Sr.Principal 1.0 Hrs. @ $77.75 77.75
Proj .Engr. 3.5 Hrs. @ $52.00 182.00
Review, inspection and prepare letter re:
Cristofori Woods Plat #1706 Proj .Engr. 0.5 Hrs. @ $52.00 26.00
Prepare permit application requirements and
contact Mark Gronberg, attend meeting with
WS Engineer, DNR & WS, mitigation plan and
prepare letter to revise easements and
and drawings Plat #1720 Proj .Engr. 19.0 Hrs. @ $52.00 988.00
Inspection of Fox Bend Project Field Sup. 0.5 Hrs. @ $46.50 23.25
Meet with Shorewood on I/I problem Sr.Principal 4.0 Hrs. @ $77.75 311.00
Draft topo file from Horizons, Inc. Sr.Draft. 2.0 Hrs. @ $42.75 85.50
Attend meeting on Sept. 30, 1992 with MWCC
re: conveyance of facilities Sr.Principal 3.0 Hrs. @ $77.75 233.25
Drafting of contour maps Sr.Draft. 4.0 Hrs. @ $42.75 171.00
Mileage 48.18
Electro-Static Plot Printing 92.00
$3,012.93
All bills due and payable within 30 days.Interest will be charged at the annual rate of 12%after 60 days. Bonestroo,Rosene,Anderlik&Associates,Inc.
I declare under the penalties of perjury that I am the person making the within claim;that I have
examined said claim and that the same is just and true;that the services therein charged were actually
rendered and were of the value therein charged;that the fees therein charged are official and are such
as are allowed by law;and that no part of said claim has been paid.The effect of this verification
shall be the same as if subscribed and swum to under oath. by
Signature of Claimant
2335 West Highway 36 • St. Paul, Minnesota 55113 • 612-636-4600