Loading...
HomeMy WebLinkAboutRes- 4915 (Final) , g, 0.iti. CITY of ORONO ,s, '121 1 RESOLUTION OF THE CITY COUNCIL Final Version 1-29-03 A RESOLUTION GRANTING PRELIMINARY PLAT APPROVAL AND GENERAL DEVELOPMENT PLAN APPROVAL FOR PLANNED UNIT DEVELOPMENT NO. 4 FOR DAHLSTROM DEVELOPMENT, LLC - FILE #2789/2840 WHEREAS, the City of Orono is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS,the City Council of the City of Orono(hereinafter"City Council")has adopted land development regulations for the orderly,economic and safe development of land within the City; and WHEREAS, Dahlstrom Development, LLC ("the Developer") has an interest in pi 3perty located at `2550' Wayzata Boulevard and legally described as: Outlot B, Willow Properties Addition, Hennepin County, Minnesota, except Parcel 201 and 201a Minnesota Department of Transportation Right of Way Plat No. 27-57. (hereinafter the "Property"); and WHEREAS,the City Council has considered the application by the Developer for development by the Planned Unit Development (PUD) process of the Property; and WHEREAS, on August 26, 2002 the City Council adopted Resolution No. 4852 granting General Concept Plan Approval for the proposed development, which approval included the following elements: 1. Rezoning of the portion of the Property north of Kelley Parkway from RR-1B Single Family Rural Residential District to RPUD Residential Planned Unit Development District for construction of 167 residential multi-family dwelling units on a portion of the site comprising approximately 41 acres. Page 1 of 18 , , O O � .cO CITY of ORONO if �' ? Q ~ RESOLUTION OF THE CITY COUNCIL �ESII04 NO. 2. Creation of two commercial outlots on the remaining 10 acres to be rezoned and developed at a later date. 3. As part of the residential development, construction of Kelley Parkway as well as construction of municipal sewer, water, and storm sewer systems to serve the proposed development; and WHEREAS, the applicants have submitted a Preliminary Plat and General Development Plan for approval by the City Council; and WHEREAS, the Orono Planning Commission on November 19, 2002 pursuant to public notification held a public hearing on the application for Preliminary Plat and General Development Plan approval, at which time all persons wishing to comment on the project were provided the opportunity to comment; and WHEREAS,on November 19, 2002 the Orono Planning Commission voted 7-0 to recommend approval of the General Development Plan,including the proposed rezoning to RPUD, the various elements of the Plan,preliminary plat approval for the entire plat,and final plat approval for the portion of the Plan designated as Phase 1, subject to a number of conditions; and WHEREAS, the City Council makes the following findings regarding the General Development Plan: 1. The Developer has provided a Development Plan for the residential portion of the development that substantially conforms to the Development Standards for Attached and Multi-Family Dwelling Structures for the RPUD District per Zoning Code Section 10.33, Subd. 5(G) and has demonstrated to the satisfaction of the City Council that all RPUD standards have been met or will be met,and has demonstrated where such standards are not met, and has satisfied the City Council that non- compliance with said standards is remedied in a manner acceptable to the Council. 2. The Developer has demonstrated to the satisfaction of the Council that the RPUD standard of 10% of the gross project area has been set aside for private recreational uses. The Developer has agreed to install a Tot Lot as one of the private park & recreation amenities of the development. Page2of 18 . -cl -t) 43 O O -4,,-..,,,, CITY of ORONO i:. ti ,,,.,.... t.�� 1"' I � r G~' - RESOLUTION OF THE CITY COUNCIL ikESH04 NO. 3. The Developer has provided a landscaping plan and a proposed `streetscape' for Kelley Parkway that has been reviewed by the City's consulting landscape planner and by the City Council and has been found to substantially meet all of the requirements of the RPUD District and is satisfactory to the City Council subject to conditions to be specified in this resolution. The landscaping plan provides for a "parkway" character through substantial landscaping along Kelley Parkway. 4. The Orono Fire Marshal has reviewed the General Development Plan and finds it generally in accordance with applicable codes and standards. The Plans include a provision for emergency vehicle access between Kelley Parkway and East Lane. 5. The Developer has demonstrated to the satisfaction of the City Council that the development as proposed is in compliance with all the wetland protection and mitigation requirements of the Minnehaha Creek Watershed District as administrator of the WCA regulations on Orono's behalf. 6. The Developer has provided market study information confirming that the proposed residential units at the proposed pricepoints are marketable and will provide housing options generally needed within the Orono area. 7. The Developer has submitted a Preliminary Plat providing for the creation of Lots, Outlots,drainage and utility easements and public right-of-way dedications generally in conformance with the approved General Concept Plan. WHEREAS,the Applicants have agreed to execute Planned Unit Development No. 4 Agreement providing for the installation of certain public and private improvements as a condition of General Development Plan approval, which agreement will additionally documents the general and detailed conditions for use and development of the Property; and WHEREAS, the Developer has completed or has agreed to complete all other requirements of the Zoning Code and related Ordinances of the City including but not limited to: 1. Provision of evidence to the City of Minnehaha Creek Watershed District(MCWD) permit approval for the grading and stormwater management facilities plan for the development of the Property. Page3of 18 -• -. 0.4i- p NO . : ; CITY of ORONO v It Q RESOLUTION OF THE CITY COUNCIL 4 VP-JO� ESHD4 NO. 4 ' 2. Provision of evidence to the City of Minnesota Department of Transportation (Mn/DOT) drainage permit approval for construction of the regional storm water pond within Mn/DOT right-of-way,and ofMn/DOT permit approval for construction of public street, street amenities and utilities within the Mn/DOT right-of-way. 3. Payment to the City of Stormwater and Drainage Trunk Fees for the development of the Property in the amount established in the Development Fees Schedule attached hereto as Exhibit B. 4. Payment of Sewer and Water Connection Charges in the amount established in the Development Fees Schedule attached hereto as Exhibit B. 5. Payment of Park Dedication Fee in the amount established in the Development Fees Schedule attached hereto as Exhibit B. WHEREAS,the City Council,City staff and consultants have reviewed the plans for this PUD application and hereby specify approval of each Plan Sheet attached within Exhibit F and identify them as part of the official record for Planned Unit Development No. 4. NOW,THEREFORE,BE IT RESOLVED that based on the findings of Resolution No. 4852 and on the findings enumerated in this Resolution,the City Council of the City of Orono does hereby grant Preliminary Plat Approval and General Development Plan Approval for Planned Unit Development No. 4, subject to the following conditions: 1. General Development Plan Approval is granted subject to conditions established within Resolution 4852 and enumerated herein, and subject to the conditions to be established within the Planned Unit Development No. 4 Agreement and other pertinent documents. 2. RPUD Development Standards and General Conditions. a) The total number of residential dwelling units shall be 162 units including 62 Lofts units, 47 two-story townhomes and 53 rambler townhomes, as configured on the approved site plan, Sheet C2.1, Revised Site Plan dated 1-24-03. Page 4 of 18 (4k, 0.ilti , CITY of ORONO Y i RESOLUTION OF TH CITY COUNCIL ` ICES804 N0. b) Street lighting along Kelley Parkway adjacent to the property shall be provided by the Developer and shall be of a style,number,height and location approved by the City Council. Public street lighting along Kelley Parkway shall be installed and maintained by the utility company through a standard agreement between the City and the appropriate public utility company. Interior private street lighting shall be at a low level consistent with the surrounding rural residential character while providing the necessary level of security. Such lighting shall be of a style, number, height and location approved by the City Council. Interior street lighting shall be maintained by the homeowners association. c) Final decisions by the Developer regarding colors, types and qualities of building materials shall be subject to City staff approval, and shall be in conformity with the sample colors, types and qualities documented by reference in Exhibit C. Final building designs shall be reviewed by the Planning Director prior to issuance of building permits to ensure compliance with the architectural standards of the RPUD District. d) The separation distances between townhome buildings are acceptable as shown on the approved General Development Plan,with the majority being at least 15' at the nearest point with greater separation as the building walls diverge. Within each Phase of development,if any changes to plans result in separations less than 15', such plans shall be subject to review by the City Council and Developer shall demonstrate to the satisfaction of the City Council that suitable architectural styling, building orientation or other methods will be used to mitigate the lack of separation. e) Any revisions to building separations,hydrant locations or fixture sizes/types deemed necessary by the Orono Fire Marshal as required for fire-protection purposes shall be made by the Developer. f) The berm along the Public Works site east boundary may be extended eastward as shown on Sheet C2.3 to assist in establishing a buffer to the Lofts; however, any buffer walls, plantings or other improvements shall be located on the Lofts site as shown in the approved General Development Plan. The Developer shall take extraordinary efforts to minimize impacts on existing vegetation and enhance screening and buffering in the area northwest Page 5 of 18 . . o.4,. 0 0 r,„,,,, � '- _ CITYofORONO F ____ �� 0'��,. G~:, RESOLUTION OF THE CITY COUNCIL �4kESIIO NO. of the Lofts west building. The City's Public Works operation may be a 24- hour operation dependent on weather and other emergency situations. A disclosure regarding the Lofts buildings proximity to Public Works shall be required of Lofts buyers to help limit the expected complaints about City activity and noise from the Public Works site. g) All residential buildings including the Lofts shall have pitched roofs as shown on Sheets A1.2, A2.2 and A3.2 to maintain a rural residential character. Roofs for the Lofts units shall be low-pitched rather than steeply pitched to decrease the impact of excess building height. h) Developer shall submit proposed conditions for development of the commercial outlots to maintain the natural amenity values of the pond and protect the perimeter of the pond from encroachment by commercial development. i) Final landscaping plans shall be subject to the recommendations of Wallace Case as enumerated in his letter dated 11/6/02 as revised or amended per the Memorandum by Tom Kirby dated January 17, 2003. The pertinent Homeowners Association(s)shall be responsible for permanent maintenance of landscaping per the Landscaping provisions of the RPUD District. As a condition of the PUD No. 4 Agreement, Developer shall provide landscape performance security as required in the RPUD District standards. j) The following variance to the RPUD development standards is hereby granted: - Building height variance for Lofts building from 30' to 38' defined height (measured from final average grade at high side) - Building setback for rambler townhome Unit 27 to be 20' from the north property boundary and for rambler townhome Units 28-29 to be 10' from the north boundary where a 35' setback is the standard, as depicted on Sheet 2.1, Revised Site Plan dated 1-24-03.. Page 6 of 18 ev o CITY of ORONO '� tv,_ G RESOLUTION OF TF{E CITY COUNCIL L9kESH�4� NO. 4 A 3. Transportation a) Kelley Parkway shall be platted and constructed by the Developer as a two- lane public roadway with appropriate turn lanes per the design and specifications as shown on the approved design, Sheets C4.7 and C4.8. Appropriate traffic control and parking signage on Kelley Parkway shall be installed by the developer subject to the City Engineer's review and approval. Developer shall also be responsible for construction of public road improvements to Willow Drive as shown on Sheet 4.7 and other sheets. The City Engineer shall inspect all road construction at the appropriate stages to ensure specifications are met. The Developer shall provide a 12-month warranty on all street construction including utilities,sidewalks,landscaping and lighting. b) On-street parking will be allowed on the north side of Kelley Parkway only, within the 8'parallel parking`bump-outs'as indicated on the approved Plans. The final road design shall ensure ease of maintenance for snow removal. c) The interior street system and sidewalks within the common areas of the residential portion of the development shall be privately owned and maintained,with the exception of the Public Trail located along Willow Drive. The appropriate City standard private street and utility easements shall be required over all streets and utilities within the common areas. Maintenance of the private streets and sidewalks will be the responsibility of the Developer or an incorporated homeowners association. d) The interior road system shall be constructed per the specifications as shown on the approved plans, Sheets C4.7 through C4.11. Appropriate traffic control signage for all interior streets shall be installed by the developer subject to approval of the City Engineer.There shall be no parking on interior streets except at designated parking areas. e) The emergency-use-only connection between the East Lane cul-de-sac loop and Kelley Parkway shall be constructed, maintained and signed to ensure emergency vehicle access is maintained in all seasons while physically prohibiting general traffic use. Final design shall be subject to approval by the City Engineer. Page7of 18 (Iv ° 0 CITY of ORONO � ti )1 � _4 p~ RESOLUTION OF THE CITY COUNCIL 4kEs0o4No. 4 f) An 8' wide bituminous surfaced public pedestrian/bicycle trail shall be constructed by the Developer within Outlots B, C, F and G in a curvilinear fashion as depicted on Sheet C2.1. This trail system shall be constructed in conjunction with Phase I of the development. g) An 8' wide bituminous surfaced public pedestrian/bicycle trail shall be constructed by the Developer within Outlot A along Willow Drive in conjunction with Phase 1 of the development to ensure that the area designated for trail use is not commercially developed. h) An 8' wide bituminous surfaced public pedestrian/bicycle trail shall be constructed by the Developer or his successors in ownership within Outlots A and D along Highway 12, connecting to the trails constructed in Phase I. The construction of the portions of said public trail adjacent to Highway 12 within Outlots A and D maybe deferred until a determination is made whether the Highway 12 boulevard area will be converted from a rural section to an urban section and/or until Outlots A or D are developed for commercial uses.. The trails along Highway 12 may be located within the Highway 12 right-of- way if a 20'separation is maintained from the traveled roadway of Highway 12, and if MnDOT approval is obtained. Portions of the trail may be located within the right of way of Kelley Parkway north of the stormwater pond.The trail shall provide a continuous connection along Highway 12 from the east boundary of the property to the west boundary; connection across the stormwater pond area may be along Highway 12 or may jog up to and back down from Kelley Parkway along the stormwater pond perimeter. i) The City shall be responsible for maintenance of the public trails upon their completion and acceptance. Public easements including a suitable shoulder width shall be granted over all the public trails not located in dedicated right- of-way. j) Sidewalks along both sides of Kelley Parkway shall be provided by the developer as depicted on the approved plan sheets, including 5' concrete sidewalks separated from back of curb by 8'to accommodate deciduous trees and landscaping in boulevard. Page 8 of 18 0 0 0 AI. ..e- CITY of ORONO 6, RESOLUTION OFT E CITY COUNCIL ikESBog' NO. k) All trails and sidewalks, whether public or private, shall be installed concurrently with the residential development phases and prior to occupancy of residential units. 1) Maintenance responsibility for the sidewalks within the right-of-way of Kelley Parkway shall be the responsibility of the Developer or the homeowners or commercial maintenance association(s). 4. Utilities and Stormwater Management a) Developer shall construct municipal sewer and water lines as shown on Sheets C4.1 through C4.6, subject to final design detail approval by the City Engineer. The Developer shall provide a 12-month warranty on all utility construction. b) The City will own and maintain the sanitary sewer and water mains within the development. The City will inspect these systems during their construction to ensure proper installation. Developer shall grant Drainage and Utility Easements to the City of Orono over all municipal sewer and water lines and facilities, including the rights of way necessary to maintain same. c) Applicants' architect shall submit final development plans to the Metro Council Environmental Services to determine the exact number of SAC units to be charged at the time of the issuance of building permits. d) Developer shall construct stormwater management facilities as shown on the approved plans,Sheets C4.7 through C4.12.The stormwater drainage system will be owned and maintained by the homeowners association. e) Developer shall construct a regional stormwater pond within Outlots B and C and within the MnDOT right-of-way per the designs and specifications as shown on Sheet C4.12, subject to Developer obtaining the appropriate permits for such use from MnDOT. The regional pond is intended to accommodate stormwater runoff from the development as well as for the entire upstream watershed. The regional stormwater pond shall be maintained by the Developer during all phases of development,after which the Stonebay Community Association shall be responsible for maintenance. In the event that MnDOT approvals require that the City be responsible for maintenance of the regional stormwater pond, the aforesaid Association shall accept the financial obligation for such maintenance. Page 9 of 18 rv. °1V0. t CITYofORONO ,sk • , ', `.; I , G~ RESOLUTION OF THE CITY COUNCIL 9kESHO4v NO. f) Developer shall provide record plan sets for all utility construction in a timely manner. 5. Wetland Impacts a) Orono's 26'wetland setback requirement(Zoning Code Section 10.55,Subd. 8) which disallows filling, grading, dredging, excavation, hardcover, temporary or permanent structures,obstructions,septic systems,wells or other construction, is in effect on the site. Final grading and site plans, Sheets C3.1 through C3.10 and C2.1, indicate those locations where grading or filling within the 26' setback is necessary to accomplish the Plan. b) A variance to Section 10.55, Subd.8 is hereby granted to allow the minimal filling within the 26'wetland setbacks where buildings abut the 26' setback line as shown on the approved plan sheets. A wetland setback variance is hereby granted for encroachment ofbuildings,retaining walls,roadways,trails and hardcover within the 26'wetland setback as depicted on Sheets C2.1 and C3.8 through C3.10. c) The City specifically acknowledges that 1.05 acres of City protected wetland are to be filled or otherwise impacted as part of the project. The Developer shall comply with all requirements of the MCWD in regards to mitigation and protection of wetlands on the site. 6. Grading, Erosion Control a) Erosion control shall adhere to "Best Management Practices for Protecting Water Quality in Urban Areas". b) The Developer shall comply with all conditions enumerated in the Erosion Control memo by Bonestroo &Associates dated October 3, 2002. c) All erosion control measures as required by the City and the MCWD shall be in place, inspected and approved by the City Engineer prior to commencing excavation on the site. d) All such erosion control measures shall be maintained in working order prior to,during and after the project until released by the City Engineer, subject to weekly inspection or as necessary until the site is revegetated. Page 10 of 18 . .. 43 o � 0 ,:- CITY of ORONO >' Yi" O p� RESOLUTION OF HE CITY COUNCIL ESS e) Due to the Phasing of the project and the resultant lengthy period of time the site will be under construction,the Developer shall as a condition of the PUD No. 4 Agreement provide an escrow(amount to be determined)to cover the inspection costs of ongoing erosion control inspections. f) The Developer shall obtain all necessary permits (including but not limited to NPDES,MCWD and MnDOT permits)from the appropriate agencies for erosion control prior to commencing excavation on the site. g) In the event that the Developer's NPDES permit requires a Best Management Practices Plan, such plan shall be submitted to the City prior to commencing excavation on the site. h) The construction limits shall be clearly marked with adequate fencing to prevent any construction damage or disturbance of any trees and vegetation outside of the construction limits area. Prior to commencing excavation on the site,Developer shall identify trees to be preserved,shall mark them on a site plan, and shall take extraordinary measures such as fencing, signage, etc. to ensure they are not disturbed. 7. Housing Affordability. The Developer shall participate in the City process of establishing and implementing a program regarding housing affordability. The Developer's participation shall include contribution of resources which may, at the discretion of the City, include one or more of the following: - Contributions of capital in an amount to be determined; and/or - Creation of affordable units within the Stonebay Project; and/or - Contribution of manpower; and/or - Contribution of professional expertise. 8. Other General Conditions a) Monument signs as depicted in Sheets L7.1 and others may be provided by the developer at each entrance to the RPUD development site. The signage shall be limited to a development name and/or logo and street address on the monument signs. Any changes to the final design/materials of monument signage from those shown on the approved plans shall be subject to approval by the City Council. Page 11 of 18 ev.,\° 41.0 CITY of ORONO �A r::0 1 I�� Qer�p RESOLUTION OF THE CITY COUNCIL kESIO NO. b) Any design, material or specification revisions from the approved plans involving streets,utilities,storm sewer facilities,grading or the regional pond shall be subject to approval by the City Engineer prior to implementation of such changes. c) Any design, material or specification revisions from the approved plans involving dwelling unit design guidelines, architectural styles, building location, site landscaping, and other approved/required site amenities, shall be subject to approval by the Planning Director and maybe subject to review and approval by the City Council at the discretion of the Planning Director. d) Prior to release of the final plat, City Attorney shall review and approve the covenants and documents describing the creation,structure,rights,obligations and responsibilities of the various homeowners associations serving the development. The covenants shall include conditions of this resolution that have not been met as of the release of the plat, provide common access easements for each lot that receives access from a shared private street or driveway, and shall provide for maintenance of all common areas. 9. Preliminary Plat Approval. Preliminary plat approval is granted for the entire plat. Final plat approval will be granted for each Phase ofthe residential development upon submittal and approval of the required final plat documents for that Phase,including final engineering plans for all improvements. The required submittals for Final Plat Approval are as follows: a) Record plat drawings in the form of two (2) mylar copies (one copy for the City's records and one for filing with Hennepin County) and one (1) copy reduced to 1" =200'. Drawing to include: i. Lot lines platted per preliminary plat drawing by Landform, Sheet C5.1 as revised 1-24-03. ii. Dedication of "drainage and utility easements" over the common lots within each Phase ofthe residential development as the Phases are brought forward for final platting. Page 12 of 18 v 0 o o CITY of ORONO AY 14. 0'i 1_ C~ RESOLUTION OF THE CITY COUNCIL ` it'ESg04 NO. 4 9 1 5 iii. Dedication of 10' drainage and utility easements along all perimeter lot lines of Outlots A and D. Dedication of a 30' drainage and utility easement along the south lot line of Outlot D. iv. For approval of Phase I,dedication of 10'drainage and utility easements over the north and east boundaries of Outlots F and G, and along the west boundary of Outlot D. b) Legal documents required: i. Title opinion addressed to the City. All owners, mortgage holders or others with property interest indicated therein shall sign the plat and all other documents affected by such interest. ii. Certified copies of all recorded easements currently affecting the property. iii. Final copies ofMaster Declaration and individual Community Declarations pertinent to the phase being final platted. iv. Standard private road easement document over the private road ways within each Phase,granting the City the right to maintain said roads (may be incorporated into the Declarations). c) Final plat approval fees to be paid for each Phase: Final Plat Review Fee $250.00 minimum plus incurred legal, engineering, and planning consultant charges Document Filing Fees $220.00 minimum plus incurred costs 10. Development Agreement. General Development Plan approval is contingent upon the successful execution of a PUD No. 4 Agreement between the applicant and the City. Page 13 of 18 . p. 0,/ti o �,, o E ;0- CITY of ORONO �� 1 p RESOLUTION OF THE CITY COUNCIL �ESI30g NO. 11. Financial Guarantee. a) The PUD No.4 Agreement shall include a financial guarantee by the applicant to ensure the completion of site improvements. b) The City Engineer shall complete an estimate of improvement costs,including but not limited to public and private streets, curb & gutter, stormwater management facilities, landscaping, grading, erosion control, utilities, driveways and parking areas,trails,sidewalks,and retaining wall construction. c) Developer shall provide to the City a financial guarantee of 150% of the improvement costs prior to commencement of construction for each Phase. d) At no time during any Phase will the financial guarantee be reduced to to less than$100,000. This amount shall not be released until all improvements and obligation covered by the financial guarantee have been completed,including delivery of record plan sets to the City. 12. Upon the final approval and execution of this resolution and the Planned Unit Development No.4 Agreement,the City Council shall formally approve an ordinance amending the official zoning map of the City to rezone the portions of the Property north of Kelley Parkway to RPUD Residential Planned Unit Development, and amending the Orono Zoning'Code by adding language establishing Planned Unit Development No. 4 (PUD-4) to include all portions of the property. 13. Upon approval of this Resolution the City Council shall direct the Mayor and Clerk to execute other documents required by this PUD rezoning,including but not limited to the "Planned Unit Development No.4 Agreement",all subject to approval by the City Attorney. 14. Minor changes in the location,placement and height of structures may be authorized by the Development Review Committee if required by engineering or other circumstances not foreseen at the time the final plan was approved and filed with the Zoning Administrator. 15. Changes in uses: Changes to the approved final development plan deemed by the Planning Director to be significant maybe made only after a public hearing conducted by the Council. Any changes shall be recorded as amendments to the recorded copy of the final development plan. Page 14 of 18 iv. CITYofORONO I\‘ .. ti IA l � + ,- I ps RESOLUTION OF THE CITY COUNCIL <4 )°I' gam 4 9 � $ESHO NO. 16. If substantial development of Phase 1 has not occurred within one year after approval of PUD No. 4 as set forth in the Planned Unit Development No. 4 Agreement, the City Council may declare the approvals granted within this resolution and within said Agreement as null and void. Approvals for any future Phases for which substantial development has not occurred within four(4)years after the date of approval of PUD No. 4 as set forth in the Planned Unit Development No. 4 Agreement, may be declared by the City Council as null and void. 17. The approvals granted in this Resolution shall not become effective until such time that the Developer successfully completes purchase and provides evidence suitable to the City Attorney of ownership of the Property. 18. The approvals granted in this Resolution shall become effective only when all conditions of approval requiring actions by the Developer have been satisfied. Page 15 of 18 dit. o . o =is. CITY of ORONO ql V 4G� RESOLUTION OF THICK ` Y COUNCIL VI/CESg04 N0. 4 Adopted by the City Council of Orono this 27th day of January, 2003. ATTEST: ijeta_44; 4e^ 'Linda S. Vee, City Clerk Barbara A. Peterson, Mayor De eer(On 4 tobehalf of Dahlstrom Development Corporation LLC) STATE OF MINNESOTA COUNTY OF HENNEPIN The foregoing instrument was acknowledged before me on this (-7-day of J4l u f:ry ,2003 by Barbara A. Peterson, Mayor of the City of Orono, a Minnesota municipal corporation and said instrument was executed on behalf of the City. • LINDA S.VEE NOTARY PUBUC-MINNESOTA '' lAy Canunssbn Expires Jan.31,2005 Notary Public STATE OF MINNESOTA COUNTY OF HENNEPIN The foregoing instrument was acknowledged before me on this 9 day of -1 aet 2003 by Linda S. Vee, City Clerk of the City of Orono, a Minnesota municipal corporation and said instrument was executed on behalf of the City. r-777;388=*li r_... - ? NOT!,7PUEUC-MI\P:E"OTA � ���G'l�C i My Crr:m.:z.:on Expires J-: Notary Public Page 16 of 18 .v. 0 00 `A...A .\� ..,;,?::5 4, CITY of ORONO v.. . i , ~ RESOLUTION OF THE CITY COUNCIL 410ESI-104 N0. 41 9 !. STATE OF MINNESOTA COUNTY OF HENNEPIN On this 3i S day of A,,v„0 v-�.( ` r , 20_ , rn Y,e2�_ t' . D h) S� `�'Y1 r personally appeared before me, J eve roper who is personally known to me V whose identity I proved on the basis of 1V\N D L. whose identity I proved on the oath/affirmation of , a credible witness and who executed the foregoing instrument, and acknowledged that he/she/they executed the same as his/her/their free act and deed. . RACHEL DODGE k NOTARY PUBLIC-MANE.OTA q i; ,r 1.1y Commission Expires Jan.31,2005 ; �k'c�L. 1- ; Notary Public STATE OF MINNESOTA COUNTY OF HENNEPIN On this day of , 20 , personally appeared before me, who is personally known to me whose identity I proved on the basis of whose identity I proved on the oath/affirmation of , a credible witness and who executed the foregoing instrument, and acknowledged that he/she/they executed the same as his/her/their free act and deed. Notary Public Page 17 of 18 ‘ip. 0.44 CITY of ORONO 1,,, k, i, ..dfi:;); G RESOLUTION OF THE CITY COUNCIL 41kESBD.V" NO. LIST OF EXHIBITS Exhibit A- Preliminary Plat Drawings (Sheet C5.1 dated ) Exhibit B - Development Fees Schedule Exhibit C - Schedule of Approved Building Materials Exhibit D - Phasing Plan Drawing Exhibit E - Retaining Wall Sample Photo Depiction Exhibit F- Approved Plan Sheets Reference Page 18 of 18