Loading...
HomeMy WebLinkAbout2015 - 00214 - roofing CITY OF ORONO I I I I I NH I I II I I 111111111111111111111 * 20 1 S - 00 2 1 4 2750 KELLEY PARKWAY DATE ISSUED: 02/20/2015 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 2250 WAYZATA BLVD W PIN : 34-118-23-22-0019 LEGAL DESC : EAST WILLOW WOODS : LOT 000 BLOCK 000 PERMIT TYPE : MINOR ALTERATIONS PROPERTY TYPE : COMMERCIAL-BUSINESS CONSTRUCTION TYPE : ROOFING-OTHER ACTIVITY : 0/S BUILDING-UNDEFINED NOTE: RE-ROOF PUMPHOUSE CITY ISSUED PERMIT N/C APPLICANT MISC FEE 0.00 MUNICIPAL BUILDERS TOTAL 0.00 17125 ROANOKE ST NW ANDOVER,MN 55304- (763)421-8790 OWNER City of Orono 2750 KELLEY PARKWAY ORONO,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are reques ' conformance wi h the State Building Code.This permit may be revoke • me for c e ause. 10 A7/ /i Perm te- Signature Date Issued By Signature Date CITY OF ORONO BUILDING PERMIT APPLICATION FOR NEW STRUCTURES OR ADDITIONS A, Mailing Address: PO Box 66 Permit number: al S-002-1 Cf Crystal Bay,MN 55323-0066 Date received: 1-0 Street Address:' Received by: y �0k 2750 Kelley Parkway Plan review fee: p �G Orono,MN 55356 1kfSH0A Total Fee: rlY'�� Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us Otte(Ibt, This application form must be completed in full and all required information must be submitted. � l4/I� Incomplete applications will be returned. (Please print) err 7-1GENERAL INFORMATION 1-1b Job Site Address: 3 Wayzata Blvd,Orono, MN 55356 Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes x❑ No If yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking Is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: Municipal Builders,Inc. State License# N/A Expiration Date: N/A Phone: (cell) 612-232-7876 (office) 763-421-8790 Mailing Address: 17125 Roanoke St.NW City: Andover ZIP: 55304 Contact Person: Nathan Neubauer Applicant is: Contractor / Homeowner (circle one) Email and/or Fax: natePlmbi.com 763-421-1028 PROPERTY OWNER INFORMATION: Name: City of Orono C4 n0 Phone(day): 952-249-4661 Address: 2750 Kelley Parkway City: Orono ZIP: 55356 Email and/or Fax 952-249-4616 ARCHITECT/ENGINEER INFORMATION: Name: Bolton&Menk Phone(day): 952-R90-n569 Address: 12224 Nicollet Ave City: Burnsville ZIP: 55337 Email and/or Fax: sethpe@bolton-menk.com PROJECT INFORMATION: Description of protect: 1.Type of Project 2.Proposed Use 3.Structure Type 4.Sewage Disposal& New Construction Water Supply ❑ ❑Single Family with ❑ Residence El Addition attached garage ❑Garage/Accessory Bldg. ® Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑Relocation detached garage ❑Office/Commercial ❑ Private Sewer ®Other:(specify) Re-roofing El Multiple Family/Condo 0 Warehouse ® Public ❑ Storage ® Public Water "'Any earth movement may also require ❑Commercial ®Other(specify) MCWD review&permits. ❑ Industrial Wellhouse 0 Private Well Minnehaha Creek Watershed District(MCWD) ❑Other:(specify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.mi nnehahacreek.orq Estimated Construction Valuation (excluding land) $ 12000 STRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction a.Length(ft.)= 25'-011 Number of bedrooms= ❑Wood/Frame b.Width(ft.)= 25-8" Number of garage stalls: ®Masonry Areas in square feet Attached= El Metal ❑ Pole Bldg. c.Basement= Detached= ❑ ICF d. 1 St Story = 640 E On-site Prefab e.2'd Story= ❑Off-site Prefab f. 'A Story = 0 Other(please specify): g.Total Area= REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable III ❑ Permit Application ® 0 Proposed Building Plans ❑ III MN State Energy Code Calculations and Mechanical Code Requirements Form ❑ ® Survey(meeting all requirements) ❑ ® Stormwater Pollution Prevention Plan ❑ LI Hardcover Calculation(s) ❑ ® Septic System Site Evaluation Report ❑ Ili Access Permit ❑ ® Wetland Buffer Improvement Plan El Ea Engineered Plans for Retaining Walls 4 feet or above ❑ 13 Minnehaha Creek Watershed District Permit(s) ❑ ® Plan Review Fee ❑ ® Application Escrow&Agreement O El Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review coats in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested,a temporary Certificate of Occupancy may be issued upon receipt of a$10,000 escrow to ensure completion oft e.as-built survey and all site improvements. i . Applicant's Signature: e'`' Date: Z/13/) Owner's Signature: Date: PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS Address: 77 S CU/\'/71A`1b4 n?L_\J' Permit No.: Description of work: Ia ooE Date Rec'd: Septic review by: /1/1/4 Date Approved: Zoning review by: it//A Date Approved: Building review by: Date Approved: 2-19 -7-01°7 Grading review by: Q N//9' Date Approved: Zoning District: Zoning File#: Reso #: Reso Date: , Zo 'ng: Lot Area: SF/AC Width: Lot Coverage: SF % Survey ubmitted: ❑ Yes 0 No Date of Survey: Revised date(?): Proposed tbacks: Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side N Defined Height: \ Peak Height: FFE: FFE minus 6 feet= (Existing Contour) Perimeter(linear feet) = \ 50% = L.F. below grade #of Stories FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: The distance between the lowest proposed The distance between the top of START WITH floor(of the basement or crawl space)and START WITH slab and the highest point of the the highest point of.,he roof. roof. If you have a... `,, If you have a... • GABLE OR HIPPED ROOF • GABLE OR HIPPED ROOF(no (no windows): Subtract half windows): Subtract half the distance the distance between the between the highest point of the roof highest point of the roof to to the low point of the corresponding SUBTRACTION gable or hipped roof the low pointof the corresponding gable or (BASED ON • GABLE OR HIPPED ROOF(with' SUBTRACTION hipped roof ROOF TYPE) windows): Subtract half the distance (BASED ON • GABLE OR HIPPED ROOF between the top of the highest ROOF TYPE) (with windows): Subtract window and the highest point of the half the distance between roof the top of the highest • ALL OTHER ROOF TYPES(flat, window and the highest mansard,etc):No subtraction. point of the roof •SUBTRACTION Subtract the distance between the ALL OTHER ROOF TYPES � (flat,mansard,etc):No (BASED ON basemenUcrawl space floor and the subtraction. EXISTING highest existing grade adjacent to the ADDITION Add the distance between the top GRADES) foundation OR 10 feet(whichever is less). (BASED ON of slab and the highest existing EQUALS Defined building height EXISTING grade adjacent to the foundation. GRADES) EQUALS Defined building height Shoreland Distric MCWD Permit Average Lakeshore Setback Bluff Met? 0 Yes No Permit Number: 0 Yes 0 No 0 N/A 0 Yes 0 No 0 N/A—see attached Setback: Stormwat Quality Existing Hardcover Proposed Overt District o Hardcover Variance Required CUP Required Tier(circle one) (��and sf) (%and sf) 1:1 Yes ❑ No ❑ Yes ONNo 1 2 3 4 5 Type(s): Type(s): N. Updated: January 2015 z:\forms\plan review checklist 2015.docx REMARKS (in-house): 2 wt 0 B u ve-- r• yY\ Al f e? Fees to be Charged YES NO Permit Plan Review State Surcharge Investigation Fee SAC—Number of SAC Units Other(specify) Square Footage $ per Square Footage Basement X = $ • 1st Floor X = $ 2nd Floor X = $ Garage X = $ Estimated Construction Value: $ 1 2 o � Orono Inspections Required Work Requiring Separate Permits Required State Permits ❑ Site 0 Plumbing ❑ Grading/ Filling 0 Well ❑ Silt Fence/ Erosion Control 0 Mechanical 0 Fire 0 Electrical ❑ Hardcover Removal 0 Septic 0 Water Connection ❑ Footing 0 Fireplace 0 Sewer Connection ❑ Poured Wall 0 Masonry 0 Lawn Irrigation ❑ Foundation Survey 0 Mfg. 0 Landscaping ❑ Foundation Waterproofing 0 Other(specify) ❑ Radon Rock Bed ❑ Framing ❑ Insulation ❑ As-Built Survey ,0'Final Other(specify) '('L/1(Z REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access: Existing: ❑ YES 0 NO New: 0 YES 0 NO OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED Updated: January 2015 z:\forms\plan review checklist 2015.docx or II \/Ow HLII t if �I b g__ = of _ N L O rk-,-{ _1r,=,, ILS' ' Q n� — L y rl 6. - — __ ROOS 0-'8) r4:1 O \\ _ ==,-- K-----2 _"--7. 7 O WELL HOUSE DEMOLITION ROOF PLAN ® 1 WELLHOUSE DEMOLITION FLOOR PLAN Eb p 4.02 p ---,' Linli DEMOLITION ROOF PLAN NOTES LEGEND O GENERAL NOTES DEMOLITION FLOOR PLAN NOTES LEGEND O ."=1.,,....,�oN�a.,� 1 wE�.-"--''.� g, v ."=1.7,==.------"--''''" :LL TaUCTIOLC .WALLA., vF.LAI,. = _A O HOLL ,ETAL . TO .. ,� FRAME ..REo 10M_.EXTERN.C,NW�. REMAIN z EXISTING .0.E. o.MEo.OPREUSE : E .,°.o , M =a oA FIESOITDOVW107 =E, ,..S.,C UNTER....SE...ETST.,. o „EXI.T!.WATER,-E.TEaTOBERE,Wo.SAVE FORa.LOC,TO, COMMENCINGTO :�WORK QUESTION EXI.n ..0iSEAM NUM_ AFRAMING TowEM4. ; .,,. ,MST,.TOWEL DISPENSER BEREMOVED .,SI=PS C E SIT=40Mg W"'C INTER.PFI CwWALL OREMAN.PREPARE WALL TOSE SE.YED•Will FACES OF WeEZRZO„ZDVIDUAL MAYAN.Wall.MECUN.,,UCT ,,OSET FOR,M,.... EXISTING FLAMED CONCRETE CLIPS'FOREMAN ,' 1 $ 7 MST.CAME,'TOSE REMOVED r=IV',.TMWEaE.oM� F .O. XF��..,'' REFER" s4.i a Ili a 4 ..,IS,.G DONNSPOUTTOREWINII-VEaIFN.,0fATKN,= WILKyS Iry7F-07,;, .Ee... �'�µ: u BOLTON ffi MENK, INC. • w �' ORON ,MIILIESOTA 31.EE. ^' =pT� WATER TREATMENT FACILITIES IMPROVMENTS ,..,,Y T..,.TORw_.� ,o,.ALL RIGHTS RLSERVED • __ �,. Consulting Engineers ^�. �. Surv-TTPrn.HA eyors e ,,�,. 4.02 EXISITING HWY 12 WELL HOUSE MON PLA ATIONS- ARCHITECTURAL DEMOLITION PLANSLITHIN IA. ] il PLAN CHECKED BDATE 2.-14 - Lots 0. `9 0 Min , PUMP o 0 00 ❑ RWPoDE ® O IF ❑ 7 9 WELL HOUSE PROPOSED ROOF PLAN ® WELL HOUSE PROPOSED FLOOR PLAN 4.03 .>�, �o p 1 . �o F 1 �� PROPOSED ROOF PLAN NOTES LEGEND O GENERAL NOTES PROPOSED FLOOR PLAN NOTES LEGEND NEW TRPM.sUaTIO.SASE OVER EXISTING PRECAST CONCRETE PLANK gi ALL;oN=TaUCTPn SEALL COM,WIAI.1 PPUCABLE W..CODES.ORDINANCES.. 1„,1.7 E4;.R,� OP4,Sria-MT. ,o,ENONCORROSIVE•REFEA,a ANEVOR EXISTING COPPTCMS.TNE C SHALL CONTACT TNE OWNER P.RESOLUTION 1.10. NEW PO,...ET EUNN,L.E NG WORK D.aoEa�,k�RUN a� ;DO � TTUR � Co,, UP NOT SCALE HE CONSTRUCTION 3NEW HOLLOW MEM DOOR ENOME PAW,aaDENEW HARDWARE,oMATCH DUSTING aEaC.,�LLaao�tnruc.�. .M, a E n,a� �a r aa„EaE , a a�� �DE,w� E.0��0 5 DRAWINGS � ,.a D�M TO BE,�IEDTOEX,,,NGChIUWALL SEKBOTH FACES Of...WALL 5 EXISTING WINDOW TO BE UULNED AND SEALED•AVM Ve AND rag: ErLD?v,K„LDASPIASH.00K T,0 SE ,Lov„01;0 EXITINGDO,»JErO,T an� RCN SY OATS M HEET xaxusaew�rtcrc ra rRoecrru�vw ...ALL aica,n RESERVED �WILKUS x> creno,wm�o�sm. w - BOBLTONEB.eery Surve IVC. ` �w1. ORONO,MINNESOTA s.0 ny,w • WATER TREATMENT FACILITIES IMPROVMENTS toste e wow, Wog caeen•ili D E sNI.�nro.n 4.03 EXISIONG HWY 12 WELL HOUSE MODDIFICATIONS- �X:a ARCHITECTURAL PROPOSED PLANS o _ in g Ell02E 0- 1,, q. pwl lg i i 52 o' T $ r 44 1— 1 / 1 a. //:1-- 1, a yL' n zs o> o '00 LM ri / II►4II�� law' II II[��I* , x �a0 3� g. g mt $ 1 1 311 °: 1 g �_ i 5221 ,H.$ ) pi s� ! Z" ii y gab ,0 F- ._,.. - 0 Y € ° Li .. 7 I a R11 1113 a Eglav 1 582 n .mA W ? - 01 Z II$I' � S osstlnNervo _ III' INh LL 0 =W w p if o m g�5 s� C �gg �ugi_ 3e i ePphp 3 9 yjis PO IA 11111111111 11 1 Vis, \ :-------1 s''''''''''' I 1 " 1 - El / 1( ,., c! Z 7 of il �, ® l 1 I o �' 1 oi�I s e4�� \ p =tel III S 4E1 N HILL LLLLLLIII 1IIiII 11111111111111 IIII Waw I c. ., 2- �U La�'c: L.�Zcc( SECTION 06100-ROUGH CARPENTRY Bi VC-1 t ) PART 1--GENERAL 1.1 SUMMARY A. Provide labor,material,facilities and administration required to furnish and install all rough carpentry needed for a complete building. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300-Submittals B. Section 03100-Concrete Formwork C. Section 07210-Building Insulation D. Section 07500-Roof System E. Section 08110-Doors and Frames F. Section 09900-Painting 1.3 REFERENCE STANDARDS A. Commercial Standards PS-1 Construction and Industrial Plywood PS-20 American Softwood Lumber Standard AWPA Cl AWPA Manual of Recommended Practice NFPA National Forest Products Association National Design Specification for Wood Construction B. Federal Standards Fed.Spec.FF-B-561C Lag and Screw Bolts Fed.Spec.FF-B-575C Hexagon and Square Bolts Fed.Spec.FF-B-584E(1) Bolts,Finned Neck;Key Head;Machine;Ribbed Neck;Square Neck; Tee Head. Fed.Spec.FF-B-588C(1) Bolt,Toggle: And Expansion Sleeve,Screw. Fed.Spec.FF-N-105B(3) Nails,Brads,Staples and Spikes;Wire,Cut,and Wrought. Int.Amd.4 Fed.Spec.FF-N-836D(1) Nut: Square,Hexagon,Cap,Slotted,Castle,Knurled,Welding and Single Ball Seat. Fed.Spec.FF-S 1 l 1D Screw,Wood. Fed.Spec.FF-S-1362 Stud,Plain,General Purpose. 1.4 QUALITY ASSURANCES A. Ail lumber shall be reasonably dry,live,sound,commercially dried,and free of warps that cannot be corrected in anchoring and from other defects impairing durability or strength. All lumber shall be kiln-dried. C13.108617-Orono,MN ROUGH CARPENTRY Water Treatment System Improvements PAGE 06100-1 • B. Furnish and install all rough hardware or other metal fastenings indicated or required for proper installation of Carpentry,Millwork and other items noted. Nails,spikes,screws,bolts,etc.,shall be of sizes and types required to rigidly secure members in place. PART 2—PRODUCTS 2.1 MATERIALS AND GRADES A. Studs,plates,blocking and furring lumber shall be"construction grade"Douglas Fir,545,not over 18%moisture content. B. Grades shall conform to specification of Association of Lumber Manufacturers producing materials specified. C. All wood blocking at roof perimeter and blocking for metal coping shall be pressure treated or Wolmanized. D. All plywood shall be Douglas Fir,exterior grade and pressure treated or Wolmanized. E. Nails,Spike and Staples: galvanized for all locations. Size and type to suit application. F. Bolts,Nuts,Washers,Lags,Pins and Screws: Medium carbon steel;sized to suit application galvanized for exterior locations,high humidity locations and treated wood;plain finish for other interior locations. G. Fasteners: Toggle bolt type for anchorage to hollow masonry. Expansion shield and log bolt type for anchorage to solid masonry or concrete. Bolts or power activated type for anchorage to steel. PART 3--EXECUTION 3.1 GENERAL A. Install miscellaneous blocking,furring,nailing strips,framing,and sheathing. B. Install members true,plumb,and level. Secure in place. C. Space miscellaneous framing and furring at 24-inches on center unless noted otherwise. D. Construct members of continuous pieces of longest possible lengths. 3.2 FASTENERS AND FRAMING DEVICES A. Nailing: Where nail spacing is not otherwise regulated by the Building Code,nails shall not be driven closer together than 1/2 their length unless driven in drilled holes,not driven closer to the edge of a member than 1/4 of their length. When necessary to prevent splitting,holes shall be drilled slightly smaller than nail diameters. The nails shall penetrate the second or farther member not less than 1/2 the nail length. B. Bolts and Nuts: Malleable or cut-steel washers shall be provided under bolt heads and nuts except where bearing on steel plates or other steel attachments or where flat-head countersunk bolts are shown. Bolt holes shall be drilled 1/32-inch to 1116-inch larger diameter than the bolts they are to accommodate,and shall be bored true-to-line. Members shall be clamped together and bolts shall be driven in place and nuts drawn up tightly. Bolts shall be drawn tight again immediately prior to enclosing with finish or,if left exposed,upon completion of other work. Holes at anchor bolts embedded in concrete may be 1/16-inch larger than bolt diameter. C. Screws: Lag and wood screws shall be screwed,not driven,into place. Holes to receive lag screws shall be bored first of the same diameter and depth as shank,then continued to depth equal to length of screw with diameter equal to the base of the screw thread. Screws shall penetrate into the farther C13.108617-Orono,MN ROUGH CARPENTRY Water Treatment System Improvements PAGE 06100-2 member a distance equal to at least 7 times the diameter of the screw shank. Washers shall be installed under each lag screw head bearing on wood. D. Metal Framing Devices: Metal framing devices shall be furnished and installed where shown. Nails for the framing devices shall be as furnished or recommended by the manufacturer of the anchor device. All nails shall be driven to their full depth at all holes in anchors. Bolt and lag fasteners shall be drawn tight. ****END OF SECTION"*** C13.108617-Orono,MN ROUGH CARPENTRY Water Treatment System Improvements PAGE 06100-3 DIVISION 7 THERMAL AND MOISTURE PROTECTION 1 SECTION 07500-ROOF SYSTEM PART 1--GENERAL 1.1 SUMMARY A. Work specified in this section shall include all materials,labor,administration and facilities required to furnish and install a roof system as shown on the plans and specified. 1.2 RELATED SECTIONS A. Section 06100(Wood Roof Edge and Curbs)—Rough Carpentry B. Section 07600—Sheet Metal Work 1.3 QUALITY ASSURANCE A. Submittals 1. Submit samples as requested by Engineer. 2. Manufacturer's written product information,installation instructions and guarantee information. 3. Indicate seam locations,perimeter and penetration details and plan of roof walkways. 4. All submittals must be on file at the Engineer's office before roof system may be installed. B. Certificates 1. Manufacturers to submit an independent test lab report stating compliance with specification requirements and have the report dated within the last six(6)months. C. Contractor's Qualifications 1. The insulation and roof membrane shall only be applied in strict compliance with the manufacturer's written instruction by factory trained and approved roofing contractors familiar with the products. 1.4 PRODUCT DELIVERY,STORAGE AND HANDLING A. Make no deliveries to project until ready to install or approved storage is provided. B. Deliver materials to project site in manufacturer's original unopened packaging and rolls. C. Identify contents,manufacturer,brand name,thermal values,and applicable standards. D. Store materials in area protected from weather,moisture,open flame or sparks and according to manufacturer's written instructions and codes. E. Handle materials to prevent damage and remove damaged materials from site. 1.5 ENVIRONMENTAL REQUIREMENTS A. Do not install roof system during rain or wet weather or when surfaces are wet. B. Do not apply roof system when air temperature is below manufacturer's recommendations. C13.108617-Orono,MN ROOF SYSTEM Water Treatment System Improvements PAGE 07500-1 1.6 GUARANTEES A. Provide Roofer-Contractor joint standard written weather tightness guarantee. B. Provide roof insulation and membrane manufacturer's combined fifteen(15)years of written guarantee covering replacement of roof insulation and membrane from defects in materials and installation up to original cost of installation. PART 2--PRODUCTS 2.1 MANUFACTURERS A. Acceptable Roof Membrane Manufacturers 1. Carlisle membrane 2. Firestone membrane 3. Johns-Manville membrane 4. Versico B. Acceptable Roof Insulation Manufacturers 1. Manufacturers that comply with specification 2.2 ROOF MEMBRANE SYSTEM A. Ethylene Propylene Diene Monomer(EPDM)Systems meeting the following requirements are acceptable: Physical Properties Test Method Specification (Metric-SI Units) Color Grey-Black Specific Gravity ASTM D297 1.15+/-.03 Tensile Strength ASTM D412 1300 psi (90 MPA)Min. Elongation ASTM D412 300%Min. Tear Resistance,Die C ASTM D624 150 lbs./in.Mur. (26.3 KN/m) Shore A Hardness(5 Second Reading) ASTM D2240 60+/- 10 Ozone Resistance ASTM D1149 No Cracks 7 days/100 pphm/ 104°F(40°C)/50%Ext. Heat Aging(Accelerated) ASTM D573 Ten.Min. 1200 psi(8.3 MPA) 7 days/240°F(116°C) Elong.Min.200% Brittleness Temp. ASTM D746 -49°F(-45°C) Permeability,Water Vapor ASTM E96 2.0 Perm-Mils Proc.BW Minimum thickness of roof membrane for ballasted roof systems is to be 0.060". Minimum thickness of roof membrane flashings is to be 0.060". • B. Provide metal attachments and anchorage compatible with roof membrane. C. Provide Bonding Adhesives,Splicing Cement,Lap Sealants and Caulking products compatible with roof membrane. C13.108617-Orono,MN ROOF SYSTEM • Water Treatment System Improvements PAGE 07500-2 D. Ballast shall be washed,round and smooth stone about 1-1/2"(3.8 cm)thick with a minimum of 10 pounds per square foot. E. Walkways shall be"Roofblok"or equal concrete pavers with slip sheet. Pavers shall have fluted bottoms to permit drainage. Provide three(3)foot wide walkway around all rooftop mechanical equipment and a three-foot wide walkway from mechanical equipment to edge of roof or any other access to the roofs. F. Pipe flashing and other accessories shall meet manufacturer's standard materials requirements for a complete roofing system. G. Provide wolmanized wood strips or metal bar strips or rubber bar strips with fasteners as required to fasten membrane at roof edge and flashings. 2.3 ROOF INSULATION A. Roof insulation shall be compatible with ballasted,fully adhered and mechanically fastened single-ply, EPDM roofing systems.Insulation system shall be available in flat and tapered boards.The insulation shall use EPA accepted blowing agent and shall be free of HCFC. B. Rigid ISO Cyanurate conforming to ASTM C 1289,Type II,Class I and FM Class 1 approved. Minimum LTTR R-value(CAN/ULC S770)of the material shall be not less than 9.0 and 12.0 for a nominal thickness of 1.5 inches and 2.0 inches respectively.The minimum foam core density shall be 2.0 lb/cu.ft. The total thickness shall be as shown in drawings and at a minimum shall at least 1.5 inches. C. Tapered Insulation:Provide tapered insulation of 1.25 P.C.F.expanded polystyrene above first layer of roof insulation at all roof drains and elsewhere as indicated on the Drawings and as needed to provide proper roof drainage.(1/4"per foot min.) 2.4 VAPOR BARRIER A. Vapor barrier shall be installed in all areas with high interior humidity and shall be 6 mil clear polyethylene sheet conforming to CS 227 with a permeability of not more than 0.5 perm when tested in accordance with ASTM 154-79 or any other material as recommended by the roof membrane manufacturer. PART 3--EXECUTION 3.1 INSPECTION OF SURFACES A. Verify that work of other trades which penetrates roof deck or required men and equipment to traverse roof deck has been completed. B. Examine surfaces for inadequate anchorage,foreign material,moisture,and unevenness which would prevent the execution and quality of application of the roofing system as specified. C. Examine roof edge and curb lumber for proper anchorage. D. Do not proceed with application of the roofing system until defects are corrected. E. Clear deck of dust,dirt,debris,ice,snow,etc.,and promptly repair any disfigurement. F. Placement of insulation constitutes acceptance of roof deck. 3.2 DISTRIBUTION OF STORED MATERIALS A. Distribute temporarily stored materials evenly over roof deck to avoid overloading. C13.108617-Orono,MN ROOF SYSTEM Water Treatment System Improvements PAGE 07500-3 3.3 INSTALLATION OF INSULATION ON BALLASTED ROOF A. Loosely lay insulation board stock over the roof deck in two layers with the joints staggered one-half width and length of board below. B. Neatly cut to fit insulation around roof openings and projections. C. Lay no more insulation than can be covered by roofing membrane in same day. D. Leave surface clear of debris,ready to receive roofing. 3.4 INSTALLATION OF ROOF MEMBRANE ON BALLASTED SYSTEM A. Verify all construction details with factory representative prior to beginning installation. B. Factory representative shall visit the site during application. C. Install all materials according to manufacturer's written instructions. D. Loose lay roof membrane over insulation and install 10 lbs.of ballast per square foot of roof area. The t` ballast application shall be 15 Ibs/sq.ft.at corners and 12 lbs/sq.ft.along the perimeter. E. Bond roof membrane and flashings with bonding adhesive to all curbs,flashings and roof edges. This is a must for all roof systems. Lap and bond roof membrane to seal joint between bottom of wood curbs and top of wall construction at roof edge. 3.5 TESTING A. All roof areas shall be tested prior to installation of aggregate ballast. The tests shall be delayed at least 48 hours after the application of EPDM membrane. B. Testing may be carried out by flooding the entire roof or in sections. The roof or the sections shall be flooded to a minimum water depth of 2 inches. Scuppers and overflow openings may be temporarily blocked during flooding operation. C. Areas where leaks are observed shall be thoroughly dried repaired and retested. Ballast shall not be installed before the ENGINEER approves the testing. 3.6 PROTECTION OF PARTIALLY COMPLETED ROOF • A. Temporary enclosures shall be constructed to prevent moisture from entering under roof system. Use only the materials and methods recommended by the manufacturer. 3.7 WARRANTY INSPECTION A. Before the expiration of the manufacturer's warranty period,the manufacturer or his authorized representative shall meet with the OWNERS representative for a final inspection. At this time defects and deficiencies in roofing and flashing shall be repaired at no additional cost. Warranty shall be in effect until final inspection and necessary repairs have been performed. • ****END OF SECTION**** C13.108617-Orono,MN ROOF SYSTEM Water Treatment System Improvements PAGE 07500-4 SECTION 07600-FLASHING AND SHEET METAL WORK PART 1--GENERAL 1.1 SUMMARY A. Work covered in this section shall include all material,labor,facilities and administration required to furnish and install all sheet metal work shown or specified. 1.2 RELATED SECTIONS A. Section 07500—Roofing System B. Section 07900-Sealants and Caulking 1.3 SUBMITTALS A. Shop drawings shall be submitted for copings,facia and rain water drainage. Joint details and locations shall be shown in the shop drawings. B. Submit manufacturer's current specification and related literature. C. Provide samples and color chart for color selection. D. Submit manufacturer's 20-year paint warranty covering finish fade,chalk and peel. l.4 QUALITY ASSURANCE A. Comply with Architectural Sheet Metal Manual,Sheet Metal and Air Conditioning Contractor's National Association,Inc.,recommendations. B. Fabrication and installation is to be completed by trained personnel. 1.5 PRODUCT DELIVERY,STORAGE AND HANDLING A. Make no deliveries to project until ready to install or approved storage is provided. B. All products to be stored above the ground on supports that are not to be used in the work. C. Flammable materials must be stored in conformance with fire codes and in manner that will not create a potential fire hazard. D. Select and operate material handling equipment so not to damage existing construction,or new roofing system,and without overloading building structural system. E. Any damage to existing construction must be immediately reported to the Engineer. F. Color-coated sheet metal must be stored in a manner that will protect it from exposure to the sun up until the time of installation. 1.6 GUARANTEES A. Provide manufacturer's standard twenty(20)year written guarantee for color-coated metal covering color fade,chalk and film integrity. C13.108617-Orono,MN FLASHING AND SHEET METAL WORK Water Treatment System Improvements PAGE 07600-1 PART 2--PRODUCTS 2.1 MANUFACTURERS A. Ryerson Building Products("Colorklad") B. Peterson Aluminum Corporation("PAC-CLAD") C. Firestone Building Products(UNA-CLAD) 2.2 MATERIALS A. All color-coated metal for roof edge,flashings,reglets and wall caps shall be 24-gauge,pre-painted, galvanized steel(ASTM A526)with a minimum of 1 mil(dry)total thickness factory applied finish on exposed surface(color to be selected from manufacturer's standard colors)and 0.3 to 0.4 mil(dry)total thickness factory applied finish on unexposed surface. A strippable plastic film is to be factory applied to exposed surface of metal. B. Provide fasteners compatible with metal. PART 3--EXECUTION 3.1 FABRICATION A. Shop form sections as much as possible. B. Comply with Architectural Sheet Metal Manual,Sheet Metal and Air Conditioning Contractor's • National Association,Inc. 3.2 SCHEDULE A. Provide reglets and other items installed by others in time to be built into the work. 3.3 INSPECTION A. Verify that substrates are smooth and clean to the extent needed for sheet metal work. B. Verify that reglets,cants,and blocking,to receive sheet metal are installed and free of concrete and soil. C. Do not start sheet metal work until conditions are satisfactory. 3.4 PREPARATION A. Before installing sheet metal verify shapes and dimensions of surface to be covered. 3.5 INSTALLATION A. Install flashing and sheet metal to comply with Architectural Sheet Metal Manual,Sheet Metal and Air Conditioning Contractor's National Association,Inc. 3.6 REPAIRING A. Repair or replace damaged work. 3.7 CLEANING A. Leave work clean and free of stains,scrap,and debris. ****END OF SECTION**** C13.108617-Orono,MN FLASHING AND SHEET METAL WORK Water Treatment System Improvements PAGE 07600-2 SECTION 07900-CAULKING AND SEALANTS PART 1—GENERAL 1.1 SUMMARY A. Work specified in this section shall include all materials,labor,administration and facilities required to furnish and install caulking and sealants as shown and specified. B. Minimum Caulking Schedule 1. Caulking under this section shall include cleaning out openings and providing caulking at the following points: (a) Caulking of every description shown on drawings and/or otherwise detailed. (b) Caulking at joints at juncture of hollow metal frames and exposed masonry,both sides of wall at doors,windows and louver frames. (c) Caulking at exposed joints between wood and masonry interior and exterior expansion joints. (d) Caulking at face of interior and exterior,vertical and horizontal contraction joints. (e) Caulking at joints between masonry walls and pre-cast roof,floor slabs and floor planks and at penetration of floors,walls and roof. Fire rated caulk where required. (f) Caulking at exposed joints in pre-cast roof and floor planks. (g) Roof flashing and counter flashing. 2. Additional caulking may be specified under related sections. 1.2 RELATED SECTIONS A. Section 04810—Unit Masonry Assembly B. Section 07600—Flashing and Sheet Metal Work C. Section 08110—Doors and Frames D. Section 09900-Painting 1.3 SUBMITTALS A. Color charts and samples as requested. B. Submit manufacturer's recommended installation instructions. 1.4 PRODUCT DELIVERY,STORAGE AND HANDLING A. Deliver materials in manufacturer's original unopened containers with identifying labels intact and legible. B. Store materials in areas protected from weather,freezing,and construction traffic. 1.5 GUARANTEE A. The supplier shall replace any product found defective at no charge. C13.108617-Orono,MN CAULKING AND SEALANTS Water Treatment System Improvements PAGE 07900-1 PART 2--PRODUCTS 2.1 MANUFACTURERS A. Tremco,Inc. B. Sonnebom C. Pecora D. Sika Corporation E. Dow Corning 2.2 SEALANTS A. One-Component Acrylic Sealant: 1. Acrylic emulsion sealant,one-part,mildew resistant and paintable,complying with ASTM C834, recommended by manufacturer for general use as an exposed building construction sealant,Pecora AC-20 or approved substitute. B. Interior Silicone Rubber Sealant: 1. Silicone rubber-based,one-part elastomeric sealant,complying with ASTM C920,Type S, Class 25,Grade NS. 2. Use acid-type for non-porous joint surfaces,and non-acid type where one or both joint surfaces are porous. 3. For wet areas use type compounded specifically for mildew resistance. 4. Use for interior joints between equipment or counters and walls. C. Two-Component Polyurethane Sealant: 1. Polyurethane-based,2-part elastomeric sealant,complying with ASTM C920,Type M,Class 25, Grade NS(non-sag),Tremco"Dymeric",Pecora"Dynatrol II". 2. Optional Sealant:Contractor may,at his option,provide 1-Component Silicone Sealant,"Silpruf' by General Electric or#790 by Dow-Corning in lieu of above. 3. For exterior and interior walks,exterior wall joints and floor joints,polyurethane as above except Grade P(self-leveling),Tremco"Dymeric",Pecora"Urexpan NR-200". D. Backer Rod:Compressible,closed cell non-gassing type compatible with required sealant. PART 3—EXECUTION 3.1 INSTALLATION A. Joints: 1. Install sealants to depths as recommended by the sealant manufacturer but within the following general limitations,measured at the center(thin)section of the bead: (a) For walks,sidewalks,pavements and similar joints sealed with elastomeric sealants and subject to traffic and other abrasion and indentation exposures,fill joints to a depth equal to 75%of joint width,but neither more than 0.625"deep nor less than 0.375"deep. (b) For normal moving joints sealed with elastomeric sealants,but not subject to traffic,fill joints to a depth equal to 50%of joint width,but neither more than 0.5"deep nor less than 0.25" deep. C13.108617-Orono,MN CAULKING AND SEALANTS Water Treatment System Improvements PAGE 07900-2 (c) For joints sealed with non-elastomeric sealants and calking compounds,fill joints to a depth in the range of 75%to 125%of joint width. 3.2 SCHEDULE OF SEALANT APPLICATION: A. At joints in vertical planes on exterior of building and interior face of through expansion or control joints,provide non-sag type polyurethane or silicone sealant. B. At joints in horizontal planes on interior and exterior of building,provide self-leveling type polyurethane sealant. C. At joints on interior of building,except as indicated in item A above,provide acrylic type sealant. D. At perimeter of plumbing fixtures,and kitchen equipment provide silicone type sealant. E. Set all thresholds in full bed of urethane type caulking. F. All chlorine rooms,all electrical rooms adjoining classified areas(e.q.pretreatment,digester control etc.) 1. All walls fully sealed to the structure top and bottom and shall not allow migration of gasses or moisture. 2. Sealant around all electrical outlets,panel boxes,etc. 3. Expandable foam around sides and back of all electrical outlets,panel boxes,etc. 4. AlI openings,into computer and electrical room,into access floor space,and into space above ceiling shall be completely sealed. ****END OF SECTION**** C 13.108617-Orono,MN CAULKING AND SEALANTS Water Treatment System Improvements PAGE 07900-3 021,14_ 1,1,44` ATE TIMEv CITY OF ORONO CALLED IN INSPECTION NOTICE ,/, SCHEDULED __-__-7 R•m• PERMIT NO. )/.Se0oY' / PLEfED J ADDRESS c:=4: 6--L ( . /o 1 OWNER —T L . 0 E NOCO1 . 7: CONTRACTO- I Ala _ rio 1 s - tc.c., l j DESCRIPTION 1.A • ► d � 4t-) '� LU 6. ❑ FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL / Q ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF 0 PLUMBING FINAL 0 TREE REMOVAL ❑ RADON SLAB 0 MECHANICAL RI 0 SITE INSPECTION Q 0 FRAMING 0 MECHANICAL FINAL 0 PROGRESS is ❑ INSULATION ❑ WOOD BURNER/FIREPLACE 0 COMPLAINT v 0 WATER HOOK-UP 0 FOLLOW-UP W ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP ElHARD COVER REMOVAL v ❑ DEMO-SITE 0 SEPTIC INSTALL 0 FOUNDATION/REMOVAL 2 OWNER/CONTRACTOR TO MEET YOU:_YES NO (4• COMMENTS:cc iii Q. 77e4,,.-77e4,,.- - w cea /n itti. t— ro F' J O /'►lGtvl/Jr[v12 t'cw►ocie�fD Sr�Crc c S O / W Pk' 6.14oa- ) n e& ) /Sd/ -I- /nsie-JA4,Gter cc iz drat a> c0 - o? Gr64.4k 7041.5 Q iv p Pe tee. w ifq ra,et ..I /v e G. c4; Oa ee — cc !21L 'r- e'014.6.4..a. o a LU SATISFACTORY:PROCEED ❑ PROJECT COMPLETE ClIL CORRECT WORK&PROCEED 0 ISSUE CERTIFICATE OF OCCUPANCY O 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY Oj BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN 0 CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. fr.....- White Copyllnspector's File Canary Copy/Site Notice