HomeMy WebLinkAboutPermit for connection to aqnd use MWCC facilities Metropolitan Waste Control Commission
Mears Park Centre, 230 East Fifth Street, St. Paul, Minnesota 55101-1633
June 26, 1994 612 222-8423
Mr. John R. Gerhardson
Public Works Director
City of Orono
P O Box 66, Crystal Bay
Orono, MN 55323-0066
RE: Permit for Connection To or Use of MWCC Facilities
Permit Number 1268
Dear Mr. Gerhardson:
This letter is to inform you that the Metropolitan Waste Control
Commission (MWCC) has approved your application for Permit for
Connection To or Use of Commission Facilities. Enclosed is your
approved MWCC Permit Number 1268 for the connection of an 2" PVC
sanitary sewer to the MWCC's Sanitary Sewer Interceptor 83-52
located at 3505 W, . Wayzata Blvd. , in the City of Orono (see
enclosed plan sheet) . Also enclosed is an extra copy of the ap-
proved permit. This copy should be provided to the contractor who
will be making the connection so that s/he is aware of the MWCC's
requirements.
Please note that the connection shall be made in accordance with
Standard Details, which are attached to and made a part of
Connection Permit No. 1268.
It is required that the City contact Mr. Wally Wessels' office at
telephone number 612-772-2585 (7:30 a.m. to 4 : 00 p.m. ) and make
arrangements to have an inspector on site at the time the
connection is being made. A minimum 48-hour notice should be
given. Please refer to the permit index number when requesting an
inspection.
PLEASE NOTE: If the Commission's inspector is not notified prior
to installation of the connection, the applicant will be required
to pay all costs associated with re-excavation and inspection.
Sincerely,
_tCarol L. Jo on
1rReal Estate cialist
CLJ:bw
cc: W.R. Wessels, w/enclosures
E.J. Bloom, w/enclosure
Equal Opportunity/Aftlrmative Acton Employer
Metropolitan Waste Control Commission
Mears Park Centre,230 East Fifth Street, St. Paul, Minnesota 55101-1633
612 222-8423
PERMIT NO.
INTERCEPTOR
APPLICATION AND PERMIT
FOR CONNECTION TO, OR USE OF,
METROPOLITAN WASTE CONTROL
COMMISSION FACILITIES
(Note: this form must be submitted in duplicate)
APPLICATION
The City of hereby applies for a permit for
connection to, or use of, Metropolitan Waste Control Commission (MWCC)
facilities. A. description of the proposed connection or use is attached to
this Application as Exhibit A, Supplemental Data Sheet. By execution of this
Application, the Applicant agrees to:
1. Provide such additional information as is requested by the MWCC. in
order to make a determination on permit issuance.
2 . Abide by the permit terms and conditions set forth below and all
applicable state and local laws, ordinances, rules and regulations.
.3 . Pay all applicable permit fees (i.e service -Availability Charge
and Industrial Strength Charge) in . accordance with MWCC rules and
regulations.
4 .. . Reimburse the MWCC for any damages resulting to the MWCC's
facilities as a result of the connection or use of its facilities.
5. Indemnify and hold harmless the MWCC, its employees, agents, and
contractors from and against all claims, damages, losses and expenses,
including but not limited to attorney's fees, arising out of or resulting
from the connection. to, or use of, MWCC. facilities, provided that any such
claim, damage, loss . or expense ' (1) is attributable to bodily injury,
sickness, disease, or death or to injury to or. destruction of tangible
property, including the loss of use resulting therefrom, and (2) is caused in
whole or in part by any negligent act or omission of the Applicant.' its
contractors, subcontractors, or anyone directly or indirectly employed by any
of them, regardless of whether or not it caused in part by the MWCC.
Dated 2 Z / CITY OF
SIGNATURE
Print Name/:
Title: �� Gr/"
Page 1 of 3
Equal Opportunity/Affirmative Action Employer 10192
tof
PERMIT
It has been determined that Applicant has adopted a Comprehensive sewer plan,
has submitted it to the MWCC as required by law, and that the proposed
connection to, or use of, MWCC facilities conforms to the adopted
comprehensive plan or adopted comprehensive plan or adopted revisions
thereof.
Permission is hereby granted to Applicant for connection to, or use of, MWCC
facilities in accordance with the description provided by Applicant. This
permit is issued under the following terms and conditions:
1. The -provisions of the Waste Discharge -Rules for the Metropolitan
Disposal .System, Minn. Rules, Chapter 5900 apply to activity carried out
under this permit.
2 . This permit does not replace permits required by the Minnesota
Pollution Control Agency or the necessity of securing other permits and
fulfilling- requirements of other governmental units.
3 . The MWCC's issuance of this permit does not constitute a
certification that the project design and construction proposed by Applicant
meet engineering standards. Applicant remains responsible for design and
construction, including safety, for the project. . Applicant's attention is
specifically directed to the confined space rules adopted by the Minnesota
Department of Labor and Industry, OSHA Regulations, Parts 5202 . 100 through
5205. 1040 and 5207. 030Q.
4. - This permit shall be: nulland void if the connection proposed by
Application is not made within 90 days from the date of issuance.
5. This permit is subject to modification or revocation and may be
suspended at any time for .failure to comply with its terms.
Issuance Date METROPOLITAN WAS CONTROL COMMISSION
By
Assistant &ifectcf, E ering/Construction
Department
Page 2 of 3
EXHIBIT A
Supplemental Data Sheet
PERMIT NO.
Community Date
Individual Making Application Phoned
Representing Who
Location of Connection—_'36-40--5
Work to be Done by
Type of Connection Depth
Size of Connecting Sewer, P\1 Pipe Materia-i'
Invert Elevation
Area Served in Acres:
Residential Commercial
Industrial
Predicted- F ow in Gallons Per day
Initial
Design__
lio
Characteristics of Discharge:
Residential
Commercial
Industrial
Unusual Characteristics of Above (Strength, Oils, Chemicals ,
Temperature & etc. )
Page 3 of 3
r�/u sm IPlIERt�P
Heavily Galvanized Body
Designed for Maximum Strength and Rigidity
Neoprene Gasket Cemented in Place
Flattened for Greater Stability and Resistance to Corrosion
Strap Heavily Cadmium Plated
Curvature Accurately Designed to Fit Pipe
Threads Pression Machined to Close Tolerances
Thick Boss with Full Length Threa -:y
Threads Cadmium Plated
Rolled Steel Nut,Cadmium Plat
Tough Malleable Iron Body :•
Extra Large Forged Steel Strap "
SINGLE STRAP. DOUBLE STRAP
•
Available with GASKET SUPPORT
INSERT
f
Service Outlet rc` ""°'""A"'
4
PIPE
STAINLESS
STEEL GASKET
BAND
TYPICAL SADDLES FOR CONNECTION
ORWG SUBXCr;' SUL.
PRESSURE SEWER CONNECTION TO MWCC INTERCEPTOR FORCEMAIN NONE
KB 3-9-94 MWCC METROPOLITAN WASTE CONTROL `I NO.
CWjD=0 et Fe ENGINEERING/CONSTRUCTION COMMISSIONin
ft DEPARTMENT STANDARD INTERCEPTOR DETAILS s P-
ST. PAUL MINNESOTA